Permit Information
Permit NumberBLD13-01376
StatusIssued
Name ESI
Site Address 8077 W FRANKLIN RD
Project NameStarbucks
Customer Number 
ePlanReviewYes
Description
(STARBUCKS)(GRADING-DRAINAGE) ** PLAN MODIFICATION accepted 9/30/13 to change configuration of drive thru from original approved plan. Ref DRH13-00258 for planning modification approval. CDP 10/3/13** Permit for the reconfiguration of the existing Starbucks drive thru area. There will be portions of the existing concrete island removed and replaced to allow for a new directional flow of traffic. New curb and gutter will also be replaced in certain areas and new landscaping is to be installed. No site utilities will be modified in this scope of work for the reduction of existing hardscape. NO CONSTRUCTION IS ALLOWED UNDER THIS PERMIT. X-ref DRH13-00123 for planning approval. CDP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Inspection Record Card- Bld  11/4/2013 DONE
(F) Reprint permit  11/4/2013 DONE
CHANGE STATUS TO (ISS)  11/4/2013 DONE
Routing PW Drainage10/11/2013 10/15/2013 PASS
DetailsBrian Murphy
PLANS/APPL TAKEN TO FRONT DESK  10/15/2013 DONE
DetailsChristina Prado
Routing - PLAN CHECK9/30/2013 10/15/2013 PASS
DetailsChristina Prado
Pending drainage approval
Plan assigned to Christina9/30/2013 10/10/2013 PASS
DetailsChristina Prado
Pending drainage approval
Routing PW Solid Waste9/30/2013 10/10/2013 PASS
DetailsPeter J. McCullough
Per ePlanreview approval
Routing PW Drainage9/30/2013 10/9/2013 FAIL
DetailsBrian Murphy
NEEDS NEW DRAINAGE REPORT AND O AND M.
Routing - Design Review9/30/2013 10/4/2013 PASS
DetailsJosh Wilson
Routing - FIRE9/30/20139/30/201310/1/2013 PASS
DetailsScott Arellano
No comments attached.
Plan Modification Accepted  9/30/2013 DONE
DetailsChristina Prado
received request for plan modification to reflect revisions to the original approved drive thru re-configuration
Routing - PUBLIC WORKS9/30/2013 9/30/2013 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment9/30/2013 9/30/2013 PASS
DetailsEvan Jenkins
BLD-Framing/Rough-in7/15/20137/16/20137/16/2013APASS
DetailsJim Sly
Please look @ framing adjacent to drive through window(interior) and new soffit over main counter. Kevin Honeycutt is on site contact- PH# listed on this request. Phone #: ###-#### >> Inspection requested via web by Philip Allen
Issue PAID IN FULL permit  7/9/2013 DONE
DetailsChristina Prado
Inspection Record Card- Bld  7/9/2013 DONE
DetailsChristina Prado
OVERRIDE  6/25/2013  
Telephone call  6/25/2013 DONE
DetailsChristina Prado
emailed super (Zach Higgins) fees due
Permit Ready to Issue  6/25/2013 DONE
DetailsChristina Prado
Routing - FIRE6/11/2013 6/14/2013 PASS
DetailsScott Arellano
No comments attached.
Routing PW Drainage6/14/2013 6/14/2013 PASS
DetailsBrian Murphy
PLANS/APPL TAKEN TO FRONT DESK  6/14/2013 DONE
DetailsChristina Prado
Routing - FRONT DESK6/11/2013 6/14/2013 PASS
DetailsChristina Prado
Christina Prado//Plan review complete 6-14-13
Routing - Erosion and Sediment6/11/2013 6/13/2013 PASS
DetailsKimberly M. Johnson
Routing - Design Review6/11/2013 6/12/2013 PASS
DetailsJosh Wilson
Josh Wilson - DRH13-01376
Routing - Addressing6/11/2013 6/11/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS6/11/2013 6/11/2013 PASS
DetailsBeverly Mountain
Payment Received  6/10/2013 DONE
Payment received via Govolutions
Intake Approval  6/10/2013 PASS
DetailsChristina Prado
Application received  5/29/2013 DONE
Application submitted via PDS Online on May 29 2013 11:28AM
Plan assigned to Christina6/11/2013   PASS
DetailsChristina Prado
ePlanReview case - Pending Fire, ESC & Drainage approvals//plan review complete 6-14-13