BLD-Energy code compliance | 8/15/2013 | 8/16/2013 | 8/16/2013 | A | PASS |
Tom Arcoraci
|
|
|
Brett Phone #: ###-####
|
BLD-Energy code compliance | 8/15/2013 | 8/15/2013 | 8/15/2013 | P | PASS |
Tom Arcoraci
|
|
|
Brett Phone #: ###-####
|
BLD-Framing/Rough-in | 8/9/2013 | 8/9/2013 | 8/9/2013 | A | PASS |
Tom Arcoraci
|
|
|
please call 30 minutes in advance Phone #: ###-#### >> Inspection requested via web by Brett Ogata
|
BLD-Foundation | 6/24/2013 | 6/25/2013 | 6/25/2013 | A | PART |
Jim Sly
|
|
|
mike Phone #: ###-#### All rebar in foundation and basement wall OK. Cannot determine South setback. No survey done. Contractor proceeding without verification of South property line.
|
BLD-Footing | 6/18/2013 | 6/19/2013 | 6/19/2013 | A | FAIL |
Jim Sly
|
|
|
early as poss//Mike Phone #: ###-#### Called and talked to Brett. I told him that I cannot determine property line on South side. The footings and re-bar all looked OK.
|
Routing Walk-In (Zoning) | 6/11/2013 | 6/11/2013 | 6/11/2013 | P | PASS |
Leon Letson
|
|
|
enlarged footprint by 3 feet.
|
Routing Walk-In (BLD) | 6/11/2013 | 6/11/2013 | 6/11/2013 | P | PASS |
Perry Paine
|
|
|
Shift foundation walls to allw for larger swimming/spa room
noadded value
|
OVERRIDE | | | 5/29/2013 | | |
|
|
|
|
Routing Walk-In (Zoning) | 5/29/2013 | 5/29/2013 | 5/29/2013 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 5/29/2013 | 5/29/2013 | 5/29/2013 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 5/29/2013 | 5/29/2013 | 5/29/2013 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 5/29/2013 | | |
|
|
|
|
1st review completed | | | 5/29/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/29/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/29/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 5/29/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 5/29/2013 | | | |
|
|
|
|