Third Notice | | 12/4/2013 | 12/4/2013 | | DONE |
Christina Prado
|
|
|
complete 12-4-13
|
Print Statement | | | 12/4/2013 | | DONE |
Christina Prado
|
|
|
|
Second Notice | | 12/9/2013 | 11/29/2013 | | DONE |
Christina Prado
|
|
|
mailed 12-2-13
|
First Notice | | 9/23/2013 | 10/1/2013 | | DONE |
|
|
|
mailed 10-01-2013
|
BLD-Final | 9/12/2013 | 9/13/2013 | 9/13/2013 | P | PASS |
Mike Jordan
|
|
|
larry Phone #: ###-####-As early as possible please. Ok for perm occ.
|
PubWorks Occupancy Approval | 9/13/2013 | 9/13/2013 | 9/13/2013 | | DONE |
Jason C. Taylor
|
|
|
Per Jason Taylor - no signature needed. Jason signed off on card as N/A
|
Permanent Occupancy | | | 9/13/2013 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 9/12/2013 | 9/12/2013 | 9/12/2013 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 9/10/2013 | 9/10/2013 | 9/10/2013 | P | PART |
Craig D. Hanson
|
|
|
o Zone map for alarm systems needs posted by FACP and Remote. o Evac map needs to be mounted at all emergency exits
|
FIRE-Final Inspection | 9/9/2013 | 9/9/2013 | 9/9/2013 | P | CANC |
Craig D. Hanson
|
|
|
Suppression system not done.
|
Zoning Approval | 9/9/2013 | 9/9/2013 | 9/9/2013 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Framing/Rough-in | 9/5/2013 | 9/6/2013 | 9/6/2013 | P | PASS |
Mike Jordan
|
|
|
Larry Phone #: ###-####. Recieved engineering for addtional framing for tv suuports off of roof joist. Noted in place construction was found to be acceptable.
|
Print Occupancy Form | | | 9/5/2013 | | DONE |
Christina Prado
|
|
|
|
BLD-Framing/Rough-in | 8/20/2013 | 8/20/2013 | 8/20/2013 | P | PART |
Mike Jordan
|
|
|
Larry Phone #: ###-####. New vestibule ok. pending electrical rough in inspection.
|
BLD-Framing/Rough-in | 8/7/2013 | 8/7/2013 | 8/7/2013 | P | PART |
Mike Jordan
|
|
|
larry Phone #: ###-####. Hardlids at new garage door ok. need engineering for roof I joist to show they are adequate to support the additional load for tv rack and flat screen tvs.
|
BLD-Framing/Rough-in | 7/25/2013 | 7/25/2013 | 7/25/2013 | P | PASS |
Mike Jordan
|
|
|
Larry Phone #: ###-####. Interior wood framed walls, exterior wall infill and new gargage door opening.
|
BLD-Footing | 7/12/2013 | 7/12/2013 | 7/12/2013 | P | PASS |
Tom Arcoraci
|
|
|
Larry Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/8/2013 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 7/8/2013 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 7/8/2013 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 7/5/2013 | | |
|
|
|
|
Plan assigned to (CJW) | 6/7/2013 | 6/7/2013 | 7/5/2013 | | PASS |
Carl Westfall
|
|
|
TWIN PEAKS (20 days - July 3) ePlanReview
|
Routing - PLAN CHECK | 7/2/2013 | | 7/5/2013 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines" after the 2nd plan review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/5/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 7/2/2013 | | DONE |
|
|
|
|
Routing PW Environmental | 6/7/2013 | | 6/27/2013 | | PASS |
Walt Baumgartner
|
|
|
Tenant/owner shall operate and maintain existing chemical odor dosing station per pretreatment requirements
|
1st review completed | | | 6/27/2013 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 6/27/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/7/2013 | | 6/27/2013 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing - FIRE | 6/7/2013 | | 6/12/2013 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - PLUMBING | 6/7/2013 | | 6/11/2013 | | PASS |
Bill VanDegrift
|
|
|
Per plan and 2013 ISPC.
|
Routing - Addressing | 6/7/2013 | | 6/7/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 6/7/2013 | | 6/7/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Design Review | 6/7/2013 | | 6/7/2013 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH13-00121
|
Routing - Erosion and Sediment | 6/7/2013 | | 6/7/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing PW Sewer Rating | 6/7/2013 | | 6/7/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Pending Assignment by JCB | 6/7/2013 | | 6/7/2013 | | DONE |
Jason Blais
|
|
|
|
Payment Received | | | 6/6/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Intake Approval | | | 6/6/2013 | | FAIL |
|
|
|
(6-6-13) The "E" Sheets were not provided. Please upload the "E" Sheets. CJW
|
Intake Approval | | | 6/6/2013 | | FAIL |
|
|
|
(6-6-13) Sheet E2.1 did not load properly. Please try again. CJW
|
Intake Approval | | | 6/6/2013 | | PASS |
|
|
|
3rd plan intake passed.
|
Application received | | | 5/30/2013 | | DONE |
|
|
|
Application submitted via PDS Online on May 30 2013 2:47PM
|