Case Summary (BLD) | | | 5/19/2016 | | DONE |
|
|
|
|
BLD-Final | 10/6/2015 | 10/7/2015 | 10/7/2015 | A | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####
|
DOC - Permit Finaled | 10/7/2015 | 10/7/2015 | 10/7/2015 | P | PASS |
Tony Young
|
|
|
c of o issued
|
PubWorks Occupancy Approval | 10/6/2015 | 10/6/2015 | 10/6/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Conference | 4/2/2015 | 4/3/2015 | 4/3/2015 | A | PART |
Tony Young
|
|
|
David Phone #: ###-####,, need conf on final.. call 1st,, went over corrections
|
BLD-Final | 3/30/2015 | 4/2/2015 | 4/2/2015 | P | FAIL |
Tony Young
|
|
|
David Phone #: ###-####,, need: plans, hill side, temp glass, guardrail engineering,, rise and run of stairs,, garage step,, open risers more than 4",, insulated door to crawl,, hand rails per code,, inside and out per code,, etc
|
BLD-Final | 3/30/2015 | 3/30/2015 | 3/30/2015 | P | NR |
Tony Young
|
|
|
David Phone #: ###-####
|
Routing PW Grading-Hillside | 12/3/2014 | | 12/3/2014 | | FAIL |
Jason C. Taylor
|
|
|
*NO OCCUPANCY TO BE GRANTED UNTIL PUBLIC WORKS HAS APPROVED SITE WORK* Jason Taylor ###-####.
|
BLD-Final | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | NR |
Tony Young
|
|
|
David Phone #: ###-####
|
Plan Modification Accepted | | | 5/29/2014 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 5/29/2014 | | 5/29/2014 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Other | 5/15/2014 | 5/15/2014 | 5/15/2014 | P | PART |
Tony Young
|
|
|
Fire soffits and exterior wall - David Phone #: ###-####
|
BLD-Other | 5/14/2014 | 5/15/2014 | 5/15/2014 | A | PART |
Tony Young
|
|
|
Fire soffits and exterior wall - David Phone #: ###-####,, wall ok
|
BLD-Other | 5/14/2014 | 5/14/2014 | 5/14/2014 | P | PART |
Tony Young
|
|
|
Fire soffits - David Phone #: ###-####,, work in progress,, ok
|
BLD-Wall Bracing | 5/7/2014 | 5/8/2014 | 5/8/2014 | A | PASS |
Tony Young
|
|
|
david Phone #: ###-####,, interior shear
|
BLD-Energy code compliance | 5/6/2014 | 5/7/2014 | 5/8/2014 | P | PASS |
Tony Young
|
|
|
david Phone #: ###-####
|
BLD-Framing/Rough-in | 5/6/2014 | 5/7/2014 | 5/8/2014 | P | PASS |
Tony Young
|
|
|
david Phone #: ###-####
|
BLD-Framing/Rough-in | 4/30/2014 | 5/1/2014 | 5/1/2014 | P | PASS |
Jim Sly
|
|
|
Roger Phone #: ###-####
|
BLD-Wall Bracing | 4/28/2014 | 4/29/2014 | 4/29/2014 | A | PART |
Tony Young
|
|
|
roger Phone #: ###-####,, exterior shear ok to cover,,, will put other straps inside and will have interior shear
|
BLD-Wall Bracing | 4/25/2014 | 4/28/2014 | 4/28/2014 | A | DEFR |
Tony Young
|
|
|
roger Phone #: ###-####
|
BLD-Wall Bracing | 4/24/2014 | 4/25/2014 | 4/25/2014 | A | FAIL |
Tony Young
|
|
|
roger Phone #: ###-####,, need plans,, nail panel edges
|
BLD-Conference | 4/11/2014 | 4/14/2014 | 4/14/2014 | A | PART |
Tony Young
|
|
|
Roger Phone #: ###-####,, call 30 min,, frame walk through
|
BLD-Conference | 4/11/2014 | 4/11/2014 | 4/11/2014 | P | DEFR |
Tony Young
|
|
|
Roger Phone #: ###-####,, frame ?s,,
|
Plan Modification Accepted | | | 1/23/2014 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 1/23/2014 | | 1/23/2014 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Footing | 8/27/2013 | 8/27/2013 | 8/27/2013 | P | PART |
Tony Young
|
|
|
steve Phone #: ###-####,, 90%,, ok
|
BLD-Footing | 8/26/2013 | 8/27/2013 | 8/27/2013 | A | PART |
Tony Young
|
|
|
steve Phone #: ###-####,, work in progress.. 80%
|
BLD-Conference | 8/26/2013 | 8/26/2013 | 8/27/2013 | P | PART |
Tony Young
|
|
|
steve Phone #: ###-####,, ?s on rebar,, pre conf.
|
PubWorks Subgrade Approval | 8/8/2013 | 8/8/2013 | 8/8/2013 | | DONE |
Jason C. Taylor
|
|
|
Recieved subgrade approval from geotechnical engineer for garage and residence footing, and two column pads on the northside of residence. Footing inspection may be scheduled with building department. Jason Taylor ###-####
|
Issue PAID IN FULL permit | | | 7/26/2013 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 7/18/2013 | | |
|
|
|
|
Meeting | | | 7/18/2013 | | DONE |
Tisha Gallop
|
|
|
per conversation with Bob Barrow, value for retaining walls on this lot are $15,000. Value was added to construction value in permit.
|
Permit Ready to Issue | | | 7/18/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (AJS) | | 5/31/2013 | 7/17/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 6/19 Hillside
|
Case Summary (BLD) | | | 7/17/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/17/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/17/2013 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Sue Barrow, plan are ready but need breakdown of value for house and value for retaining walls before I can calculate the fees.
|
Plan resubmittals received | | | 7/11/2013 | | DONE |
Christina Prado
|
|
|
received 4 sets of revised plans marked C1.0 and two A2.0 & A2.1; taken to Adele for further review
|
Routing - PLANNING | 7/11/2013 | | 7/11/2013 | | PASS |
Todd Tucker
|
|
|
|
Plan Reviewer's activity | | | 7/9/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Spoke with Todd T. in planning. He spoke with Sue 7/8/13 and went over his outstanding requirments. ajs 7/9/13
|
Routing - PLAN CHECK | 7/1/2013 | | 7/1/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Spoke with Sue, will filter in all sheets when I get the approved planning sign off
|
Plan resubmittals received | | | 6/28/2013 | | DONE |
Tisha Gallop
|
|
|
received two copies of structural plan sheets S0.01, S6.01 and calcs; taken to Adele
|
Routing - PLAN CHECK | 6/27/2013 | | 6/27/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
emailed 2nd plan review letter. letter in documents
|
Plan resubmittals received | | | 6/26/2013 | | |
|
|
|
Received 2 copies of sheets A1.0, A1.1 inserted into plans and taken back to Adele's desk
|
Routing - PLAN CHECK | 6/12/2013 | | 6/17/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see plan review letter in documents emailed 6/17/13
|
1st review completed | | | 6/17/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 6/6/2013 | | 6/12/2013 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing - MECHANICAL | 6/10/2013 | | 6/10/2013 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 6/5/2013 | | 6/6/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - MECHANICAL | 6/5/2013 | | 6/5/2013 | | FAIL |
Troy James
|
|
|
emailed correction to True Services
|
Routing - PLANNING | 6/4/2013 | | 6/5/2013 | | FAIL |
Todd Tucker
|
|
|
CFH13-00016 Todd
1. Driveway must be reduced to 33' wide, within the front setback.
2. Chimney must be reduced to 35' or less from adjacent grade.
3. Appeal period for CFH13-00016 ends on June 10th @ 5 pm. Permit cannot be issued until after that time and no appeals are submitted.
|
Routing PW Grading-Hillside | | | 6/4/2013 | | PASS |
Jason C. Taylor
|
|
|
All compaction testing/ fill results and a letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 6/4/2013 | | 6/4/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 5/31/2013 | | 6/3/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Route to Impact Fee Review | 5/30/2013 | 6/4/2013 | 5/31/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/30/2013 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 5/30/2013 | | PASS |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/30/2013 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 5/30/2013 | | | |
|
|
|
|