Case Summary (BLD) | | | 5/19/2016 | | DONE |
|
|
|
|
BLD-Final | 11/17/2015 | 11/18/2015 | 11/18/2015 | A | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####
|
DOC - Permit Finaled | 11/18/2015 | 11/18/2015 | 11/18/2015 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 10/6/2015 | 10/7/2015 | 10/7/2015 | A | NR |
Tony Young
|
|
|
Bob Phone #: ###-####,, need firecaulking,, need guardrail on drive way
|
PubWorks Occupancy Approval | 10/6/2015 | 10/6/2015 | 10/6/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 3/30/2015 | 3/30/2015 | 3/30/2015 | P | NR |
Tony Young
|
|
|
David Phone #: ###-####
|
BLD-Energy code compliance | 7/7/2014 | 7/7/2014 | 7/7/2014 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 6/23/2014 | 6/24/2014 | 6/24/2014 | P | PASS |
Tom Arcoraci
|
|
|
David Phone #: ###-#### - call 15 mins prior
|
BLD-Wall Bracing | 6/13/2014 | 6/16/2014 | 6/16/2014 | A | PART |
Tony Young
|
|
|
David Phone #: ###-####,, exterior shear ok,, will need interior
|
OVERRIDE | | | 6/16/2014 | | |
|
|
|
|
Plan assigned to (CDM) | 6/16/2014 | 6/16/2014 | 6/16/2014 | | DONE |
Carl D Madsen
|
|
|
|
Plan assigned to (AJS) | 6/12/2014 | 6/12/2014 | 6/16/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
SFD plan modification
|
Routing - PLAN CHECK | 6/12/2014 | | 6/16/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/16/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/16/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 6/16/2014 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 6/16/2014 | | DONE |
Christina Prado
|
|
|
Called Bob to advise plan mod is ready and gave revised fees due
|
CHANGE STATUS TO (ISS) | | | 6/16/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan resubmittals received | | | 6/4/2014 | | DONE |
Tisha Gallop
|
|
|
Received revisions to add basement to project. Received three copies of plan sheets A1.0, A1.1, A2.0, A2.1, A3.0 and additional sheets A1.2, SB1.0, SB1.1, SB1.2 and structural calcs; taken to JG.
|
BLD-Footing | 1/28/2014 | 1/28/2014 | 1/28/2014 | P | PART |
Tony Young
|
|
|
Steve Phone #: ###-####,, stair ftg,, patio area,, front left,, (south,,east)
|
BLD-Foundation | 11/27/2013 | 11/27/2013 | 11/27/2013 | P | PEND |
Tony Young
|
|
|
Steve Phone #: ###-####,, engineer looked at everything because they wanted to pour this am,, pending letter of ok
|
BLD-Footing | 10/8/2013 | 10/9/2013 | 10/9/2013 | A | PART |
Tony Young
|
|
|
steve Phone #: ###-####,, footing rebar all in place
|
BLD-Footing | 10/7/2013 | 10/8/2013 | 10/8/2013 | A | PART |
Tony Young
|
|
|
steve Phone #: ###-####,, work in progress..
|
PubWorks Subgrade Approval | 9/26/2013 | 9/26/2013 | 9/26/2013 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 7/26/2013 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 7/18/2013 | | |
|
|
|
|
Meeting | | | 7/18/2013 | | DONE |
Tisha Gallop
|
|
|
per conversation with Bob Barrow, value for retaining walls on this lot are $15,000. Value was added to construction value in permit.
|
Permit Ready to Issue | | | 7/18/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (AJS) | 5/30/2013 | 5/30/2013 | 7/17/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 6/19 Hillside
|
Routing - PLAN CHECK | 7/17/2013 | | 7/17/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 7/17/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Erosion and Sediment | 7/17/2013 | | 7/17/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/17/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/17/2013 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Sue Barrow, plan are ready but need breakdown of value for house and value for retaining walls before I can calculate the fees.
|
Routing PW Grading-Hillside | 7/11/2013 | | 7/12/2013 | | PASS |
Jason C. Taylor
|
|
|
Project approved as Cat 2 hillside with an additional grading permit for Lot 3 under MIS13-00202.
All compaction testing/ fill results and a letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan resubmittals received | | | 7/11/2013 | | DONE |
Christina Prado
|
|
|
received 4 sets of revised plans marked C1.0 and two A2.0 & A2.1; taken to Adele for further review
|
Routing - PLANNING | 7/11/2013 | | 7/11/2013 | | PASS |
Todd Tucker
|
|
|
|
Plan Reviewer's activity | | | 7/9/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Spoke with Todd T. in planning. He spoke with Sue 7/8/13 and went over his outstanding requirments. ajs 7/9/13
|
Routing - PLAN CHECK | 7/1/2013 | | 7/1/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Spoke with Sue, will filter in all sheets when I get the approved planning sign off
|
Plan resubmittals received | | | 6/28/2013 | | DONE |
Tisha Gallop
|
|
|
received two copies of structural plan sheets S0.01, S6.01 and calcs; taken to Adele
|
Routing - PLAN CHECK | 6/27/2013 | | 6/27/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
emailed comments 6/27/13. see documents for 2nd plan review comments
|
Plan resubmittals received | | | 6/26/2013 | | |
|
|
|
Received 2 copies of sheets A1.0, A1.1 inserted into plans and taken back to Adele's desk
|
Routing PW Grading-Hillside | 6/25/2013 | | 6/25/2013 | | PASS |
Jason C. Taylor
|
|
|
Spoke with Civil Engineer (Dean Briggs) about grading over property line. An additional building and ESC permit will be submitted for adjacent lot (eastern lot) to account for grading on this lot. Jason Taylor ###-####
|
Routing - PLAN CHECK | 6/12/2013 | | 6/18/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see documents for plan review comments emailed 6/18/13
|
1st review completed | | | 6/18/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 6/11/2013 | | 6/12/2013 | | PASS |
Tim Frost
|
|
|
No Comments
|
Routing - Erosion and Sediment | 6/10/2013 | | 6/11/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
New ESC plan required or permitting for disturbance on adjacent lot
|
Routing - MECHANICAL | 6/5/2013 | | 6/10/2013 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/4/2013 | | 6/5/2013 | | FAIL |
Todd Tucker
|
|
|
CFH13-00017 Todd
1. Driveway must be reduced to 33' or less within the front setback.
2. Chimney must be reduced to 35' or less next to adjacent grade.
3. Appeal period for CHF13-00017 ends on June 10th at 5 pm. Building Permit cannot be issued until June 11th if no appeal is submitted.
|
Routing - Addressing | 5/31/2013 | | 6/4/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 6/4/2013 | | 6/4/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | | | 6/4/2013 | | FAIL |
Jason C. Taylor
|
|
|
Revised grading planns needed (3 copies). Jason Taylor ###-####.
|
Route to Impact Fee Review | 5/30/2013 | 6/4/2013 | 5/31/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Application received | | 5/30/2013 | 5/31/2013 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/30/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/30/2013 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 5/30/2013 | | PASS |
Tisha Gallop
|
|
|
|