Second Notice | | 2/17/2019 | 3/11/2019 | | DONE |
|
|
|
mailed 3-12-19
|
First Notice | 1/25/2019 | 1/25/2019 | 2/7/2019 | | DONE |
Brandon Shaw
|
|
|
mailed 2-11-19
|
BLD-Final | 1/24/2019 | 1/24/2019 | 1/25/2019 | P | DONE |
Brandon Shaw
|
|
|
"old grading permit. bond release back in 2013. any questions please call brittany ###-####
|
DOC - Permit Finaled | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | PASS |
Brandon Shaw
|
|
|
|
Case Summary (BLD) | | | 8/25/2016 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 8/25/2016 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 9/19/2013 | 9/19/2013 | 9/19/2013 | | DONE |
Jason C. Taylor
|
|
|
Recieved civil and structural engineers approval for the retaining wall. Public Works Hillside approves of final permit for grading/drainage. Jason Taylor ###-####.
|
BLD-Foundation | 8/19/2013 | 8/19/2013 | 8/20/2013 | P | PASS |
Dave Hannah
|
|
|
Navaro Phone #: ###-####
|
BLD-Footing | 7/30/2013 | 7/31/2013 | 8/8/2013 | A | PART |
Dave Hannah
|
|
|
alvaro Phone #: ###-#### crew working on ftg mti will be on site for spec inspection and testing.
|
BLD-Footing | 8/6/2013 | 8/6/2013 | 8/7/2013 | P | CANC |
Dave Hannah
|
|
|
Navaro Phone #: ###-####
|
PubWorks Subgrade Approval | 8/6/2013 | 8/6/2013 | 8/6/2013 | | DONE |
Jason C. Taylor
|
|
|
Recieved subgrade approval from geotechnical engineer. Project may schedule building department for footing inspections. Jason Taylor ###-####
|
Case Summary (BLD) | | | 7/10/2013 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/10/2013 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/10/2013 | | DONE |
|
|
|
Received updated engineering calculations for the added surcharge on the retaining wall. 7-10-13 CDM
|
OVERRIDE | | | 7/9/2013 | | |
|
|
|
|
Plan assigned to (CDM) | | 5/31/2013 | 7/9/2013 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PUBLIC WORKS | 7/9/2013 | | 7/9/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLAN CHECK | 7/9/2013 | | 7/9/2013 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 7/9/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/9/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 7/9/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/9/2013 | | DONE |
Tisha Gallop
|
|
|
called Kelly Marko and told her permit is ready, fee and need GC form.
|
Telephone call | | | 7/9/2013 | | DONE |
|
|
|
Spoke with Jim Conger about the retaining wall and told him that no surcharge was indicated on the in the structural calculations and if a structure was placed on the lot above that imposed a surcharge on the wall taht there was a potential for a redesign of the retaining wall or that the structure would need to be replaced far enough away from the retaining wall as not to impose a surcharge. 7-9-13 at 3:30 PM CDM
|
Plan resubmittals received | | | 7/3/2013 | | |
|
|
|
7-3-13 received 2 copies of sheets 1 of 5,2, Face of wall,Retaining wall detail. sent to Carl M.
|
Routing - PLANNING | 7/3/2013 | | 7/3/2013 | | PASS |
Joshua Johnson
|
|
|
Wall is under six feet in height and an easement has been placed on the plat for the wall's footing.
|
1st review completed | | | 6/21/2013 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 6/19/2013 | | 6/21/2013 | | FAIL |
Carl D Madsen
|
|
|
Retaining wall is indicated as sitting over the property line. structures are not allowed to cross over property lines.
|
Routing - PLANNING Land Div | 6/19/2013 | | 6/19/2013 | | PASS |
Todd Tucker
|
|
|
|
Routing - Erosion and Sediment | 6/19/2013 | | 6/19/2013 | | PASS |
Kimberly M. Johnson
|
|
|
waiver approved
|
Routing PW Grading-Hillside | | | 6/7/2013 | | PASS |
Jason C. Taylor
|
|
|
(Re-route to Hillside) A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the wall drainage system, construction, steel placement, and top of wall slopes must be inspected and approved by the structral engineer in a signed and stamped letter. This letter must be submitted to Public Works prior to the building permit final. Call Jason Taylor at ###-####.
|
Routing - Addressing | | | 6/7/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | | | 6/7/2013 | | FAIL |
Beverly Mountain
|
|
|
Hillside failed. Jason Taylor.
|
Intake Approval | | | 5/31/2013 | | PASS |
Sam Zahorka
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/31/2013 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/31/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 5/31/2013 | | | |
|
|
|
|
Routing - PLANNING | | | | | FAIL |
Joshua Johnson
|
|
|
Wall is over 6' in height on a future property line. Application requires variance. Wall was not a part of original approval PUD12-00009
|