Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD13-01419
StatusFinaled
Name KEVIN WARTHEN
Site Address 3863 S FEDERAL WAY
Project NameTHE AUTO SURGEON
Customer Number 
ePlanReviewNo
Description
**(THE AUTO SURGEON)** Application for inspection to determine requirements for issuance of a Certificate of Occupancy for a 2,000 sq ft existing repair garage with office tenant. This space was previously occupied by "Diesel Injections. This building was constructed in 1978 in ADA County and annexed in to Boise in 1978. The building was built and occupied for Strahler Heating and Cooling and Heat Pumps. Between 2000 and 2003 Richard Harris Auto Sales moved into the building. The occupancy classification of S2 under the code the building was built included auto repair garages now an F1 occupancy. NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT. There will be no change to the occupancy. **AJS**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  10/21/2013 DONE
DetailsBarbara Stitt
BLD-Final9/25/20139/26/20139/26/2013PPASS
DetailsJim Storey
kevin Phone #: ###-####
FIRE-Final Inspection9/25/20139/26/20139/26/2013APASS
DetailsForrest France
C/N items verified for completion. Life safety finaled.
FIRE-Final Inspection6/19/20136/20/20136/20/2013AFAIL
DetailsForrest France
C/N items include; provide current certification tags on the fire extinguishers, post "door to remain ....." signage at the main entry/exit, remove manual thumbturn at the main entry/exit door.
FIRE-Final Inspection6/13/20136/18/20136/19/2013ANH
DetailsForrest France
Contact unavailable
Issue PAID IN FULL permit  6/13/2013 DONE
DetailsBarbara Stitt
Plan assigned to (AJS)6/6/20136/6/20136/6/2013 PASS
DetailsAdele J Schaffeld-Griffin
Routing PW Environmental6/6/2013 6/6/2013 PASS
DetailsWalt Baumgartner
Subject to pre treatment requirments, see scanned in PW approval,
Routing PW Sewer Rating6/6/2013 6/6/2013 PASS
DetailsConnie Baumgartner
1st review completed  6/6/2013 DONE
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  6/6/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  6/6/2013 DONE
Print Occupancy Form  6/6/2013 DONE
Permit Ready to Issue  6/6/2013  
Telephone call  6/6/2013  
6-6-13 called Kevin Warthen permit ready for pick up ///dld
Plan assigned to (TLW)6/3/2013 6/6/2013 DEFR
DetailsTim L. Woodard
Routing - PLAN CHECK6/6/2013 6/6/2013 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Addressing6/5/2013 6/6/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS6/5/2013 6/6/2013 PASS
DetailsConnie Baumgartner
see attached scanned in approval from PW
Application received 6/3/20136/3/2013 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  6/3/2013 DONE
DetailsBarbara Stitt
First Notice 10/31/2013