Permit Information
Permit NumberBLD13-01431
StatusFinaled
Name M C CONSTRUCTION
Site Address 1011 S BROADWAY AVE
Project NameU-SWIRL OF IDAHO
Customer Number 
ePlanReviewNo
Description
(U-SWIRL – Self-Serve-Yogurt) To remodel an existing 1,055 sq. ft. restaurant tenant space in 3,360 sq. ft. shell building per approved plans. This space was last occupied by “Janga Juice” under BLD05-02133. Work to include: new interior walls and doors, interior finish, new casework and equipment, new plumbing, and new electrical work. Two existing accessible restrooms shared with the adjacent tenant space and exiting from this core area were previously constructed and approved by the Building Official on a field modification to the "vanilla finish" permit. The south wall of this tenant space is an existing 2-hour rated fire wall. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is not fire sprinklered & has an alternate approval for the yogurt machines. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 8/4/20137/25/2013 DONE
Permanent Occupancy  7/25/2013 DONE
DetailsTisha Gallop
BLD-Final7/22/20137/23/20137/23/2013APASS
DetailsJim Storey
bill - Phone #: ###-#### mech n/a / health dept to sign off/ final ok.
FIRE-Final Inspection7/22/20137/22/20137/22/2013PPASS
DetailsTroy Cobbley
Life safety passed. Contractor chose to install passage hardware on the access door to the island restrooms.
FIRE-Final Inspection7/16/20137/19/20137/19/2013PFAIL
DetailsTroy Cobbley
Need annual inspection for the fire extinguisher and door hardware corrected for exiting/access to the island restrooms that were not shown on the plans. Per email from tim woodard "Talking with Carl Westfall I learned one of the ways we deal with that scenario on existing cases like this would be to only have a key locking dead bolt (Both sides). They would need to sign each side “THIS DOOR TO REMAIN UNLOCKED WHEN RESTROOM CORE IS OCCUPIED”. This eliminates the idea of someone besides staff being able to lock people inside that core area. Furthermore by the wording of “RESTROOM CORE” the associate who would be locking the door would hopefully have enough of a trigger to check the restrooms prior to locking them down.
BLD-Framing/Rough-in6/17/20136/18/20136/18/2013APASS
DetailsJim Storey
Bill Phone #: ###-####
Issue PAID IN FULL permit  6/14/2013 DONE
DetailsChristina Prado
1st review completed  6/12/2013 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  6/12/2013 DONE
DetailsTim L. Woodard
Case Summary (BLD)  6/12/2013 DONE
DetailsTim L. Woodard
Print Occupancy Form  6/12/2013 DONE
Print Occupancy Form  6/12/2013 DONE
DetailsChristina Prado
Telephone call  6/12/2013 DONE
DetailsChristina Prado
left message with Ben advising permit is ready pending GC, also gave fees due.
Permit Ready to Issue  6/12/2013 DONE
DetailsChristina Prado
Plan assigned to (TLW)  6/12/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK6/7/2013 6/12/2013 PASS
DetailsTim L. Woodard
Approved with alternate. TLW
Routing - PLUMBING6/11/2013 6/11/2013 PASS
DetailsDaryl Spivey
Per plan and 2009 ISPC.
Routing - PUBLIC WORKS  6/7/2013 PASS
Routing PW Environmental6/7/2013 6/7/2013 PASS
DetailsWalt Baumgartner
Reviewed, no comment
Routing - Addressing6/5/2013 6/6/2013 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  6/5/2013 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  6/5/2013 DONE
DetailsChristina Prado
Application received 6/4/20136/4/2013 DONE
DetailsBarbara Stitt
Intake Approval  6/4/2013 PASS
DetailsTim L. Woodard