Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-01449
StatusFinaled
Name RSCI
Site Address 11818 W JOPLIN RD
Project NameWest Boise WWTP - Phosphorus R
Customer Number 
ePlanReviewYes
Description
Thickening Building / WAS Phosphate Release Facility and Related Upgrades - To construct a new 13,410 square foot, two story, concrete and steel framed waste water thickening building with two attached 2,000 square foot, by 24 foot high concrete fermentation tanks, a 2,800 square foot open pit WAS phosphate release facility, a head works remodel, a RAS pump station, 4 aeration basin retrofits, 2 clarifiers, and a 310 square foot concrete wet well. This building will have two accessible restrooms on the first floor. This permit is also to refurbish two primary clarifiers, as well as, the associated site piping and electrical modifications required for the new thickening building. This permit also includes related site improvements. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 11/5/201512/10/2015 DONE
Mailed 12-11-15
First Notice 10/29/201510/26/2015 DONE
DetailsChristina Prado
customer failed to request in writing the overage paid on the plan check fee in 2013. After speaking with Rita it was determined no new fees are to be charged, so no FInal Value is required.
Permanent Occupancy  10/19/2015 DONE
Temporary Occupancy8/26/201511/24/20158/26/2015 DONE
DetailsCandy A. Nichols
Telephone call  8/24/2015 DONE
called Jeff to see if ready for permit c of o-left voice mail- he still needs to get an electrician to finish job then call in bldg final. see notes in ele permit
BLD-Aging Inspection8/17/20158/17/20158/20/2015 CANC
DetailsJim Sly
Temporary Occupancy5/28/20158/26/20155/28/2015 DONE
DetailsChristina Prado
Plan Reviewer's activity  5/28/2015 DONE
Scope of work was added to the permit for portions of work that were shown on plans and reviewed; however, not clearly mentioned in the "Scope of Work". TLW
Reopen Permit (ISS)  5/28/2015 DONE
DetailsChristina Prado
Permit reopened to allow for all remaining work & inspections to be completed for Aeration Basin #6. Permit was closed out without this portion being started resulting in an invalid Final Certificate of Occupancy granted. Permit status changed to TMP to allow for occupancy on completed portions. Scope of work was also updated to show a more accurate description of all work performed under this BLD//cdp
BLD-Final5/8/20155/11/20155/11/2015APASS
DetailsJim Sly
as early as possible // Jeff Phone #: ###-####
OK for Perm Occ.
BLD-Final5/1/20155/4/20155/5/2015PNR
DetailsJim Sly
Cory Phone #: ###-####
FIRE-Final Inspection5/1/20155/4/20155/4/2015APASS
DetailsTroy Cobbley
life safety passed
BLD-Final4/13/20154/15/20154/15/2015PNR
DetailsJim Sly
Cory Phone #: ###-####
Wa;lk thru........
FIRE-Final Inspection4/13/20154/15/20154/15/2015AFAIL
DetailsTroy Cobbley
Inspection was actually for a conference to go over life safety requirements. Cory Phone #: ###-####
BLD-Other7/9/20147/10/20147/10/2014PPART
DetailsJim Sly
rebar - Mike Phone #: ###-####
MTI on site.
BLD-Concrete6/25/20146/26/20146/26/2014APEND
DetailsTom Arcoraci
walls 27-30 please-Jesse Phone #: ###-#### pending mti
BLD-Concrete6/11/20146/12/20146/12/2014PPART
DetailsJim Sly
Jesse--Wall 29-wall 24 Phone #: ###-####
OK pending MTI special insp, tests and approvals.
BLD-Other4/4/20144/7/20144/7/2014APART
DetailsJim Sly
jesse - wall 22, 19 - claifier 1 wall 1 Phone #: ###-####
OK pending MTI special insp, tests and approvals.
BLD-Conference3/26/20143/26/20143/26/2014PPART
DetailsJim Sly
mack Phone #: ###-####
East wall of (North) fermentation tank.....OK pending Mti special inspections, tests and approvals.
BLD-Other3/12/20143/13/20143/13/2014APART
DetailsJim Sly
concrete form work and rebar for roof deck // Mack Phone #: ###-####
North West roof portion OK pending MTI special insp, tests and approvals.
BLD-Other3/6/20143/7/20143/7/2014APART
DetailsJim Sly
mack- rebar Phone #: ###-####
Pouring center portion of Far East wall. OK pending MTI special inspection, tests and approvals. CH2Mhill Engineer and Rick Cummings ( Pub. Works) also observing Project dayley.
BLD-Other2/27/20142/27/20142/27/2014PPART
DetailsJim Sly
rebar for concrete placement - Mack Phone #: ###-####
Select walls OK pending MTI special inspection tests and approvals
BLD-Concrete2/4/20142/5/20142/5/2014PPART
DetailsJim Sly
Fermentation tank walls - Mack Phone #: ###-#### Select wall sections.......South and center walls......OK pending observation of cold weather provisions and MTI special inspection, tests and approvals.
BLD-Concrete1/23/20141/23/20141/23/2014PPART
DetailsJim Storey
entry/pump room & SW ferm tank concrete wall - Jessie Phone #: ###-#### si ok
BLD-Concrete1/10/20141/10/20141/10/2014PPART
DetailsJim Sly
Jesse Phone #: ###-####
1st pour of walls.......Thickening Bldg. Rick Cummings, Structural Engineers and MTI observing.
BLD-Footing12/23/201312/23/201312/26/2013PPASS
DetailsJim Sly
Jesse // remainder of footing - gridline A between 2 & 3 and electrical interior footings Phone #: ###-####
FIRE-Conference12/18/201312/19/201312/20/2013ACANC
DetailsTroy Cobbley
Travis Krajnikrequested a hydrant supply line inspection. I let him know that I do not inspect fire hydrants and that that is United Waters juridiction.
BLD-Footing12/13/201312/16/201312/16/2013PPART
DetailsJim Sly
Jesse Phone #: ###-####
Approx 2/3's of footings at East structure....... Following cold weather provisions. Rick Cummings (P/W) and Resident Struct Engineer observing concrete proceedures. MTI special inspections.
OVERRIDE  10/2/2013  
Issue PAID IN FULL permit  10/2/2013 DONE
DetailsChristina Prado
Print Occupancy Form  10/2/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  10/2/2013 DONE
DetailsChristina Prado
PLANS/APPL TAKEN TO FRONT DESK  9/12/2013 DONE
DetailsJohn Menard
Plan assigned to (JCM)6/19/2013 9/12/2013 PASS
DetailsJohn Menard
1st Review completed 07-01-2013
Routing - PLAN CHECK9/5/2013 9/12/2013 PASS
DetailsJohn Menard
Routing - FIRE9/5/2013 9/9/2013 PASS
DetailsScott Arellano
Attached IFC comments to plans.
Plan Reviewer's activity  9/6/2013 PASS
DetailsJohn Menard
Reviewed and approved resubmitted revisions. JCM
1st review completed  7/3/2013 DONE
DetailsJohn Menard
Routing Off Site - STRUCTURAL6/19/2013 7/3/2013 PASS
DetailsJohn Menard
Routing PW Drainage6/19/2013 7/2/2013 PASS
DetailsBrian Murphy
Routing - PLAN CHECK6/19/2013 7/1/2013 FAIL
DetailsJohn Menard
Routing - Erosion and Sediment6/19/2013 6/27/2013 PASS
DetailsKimberly M. Johnson
LM for Amanda, Plan Designer 6/20/13 at 11:20 AM. Plan for groundwater dewatering? Is area of disturbance 4 acres (as stated on application) or 1.5 acres (as stated in SWPPP)? LM for John Reseigh on 6/26/13 at 9:00 AM. Spoke with PD on 6/27; groundwater will be dewatered to plant intake. Reaccepted plan on 6/27 and approved.
Routing - PLANNING6/19/2013 6/25/2013 PASS
DetailsSue Cummings
Routing - PLUMBING6/19/2013 6/24/2013 PASS
DetailsDaryl Spivey
Routing - FIRE6/19/20136/19/20136/21/2013 FAIL
DetailsScott Arellano
Emailed Fire Comments to architect. Attached comments to case.
Routing - Addressing6/19/2013 6/20/2013 PASS
DetailsJason C. Taylor
Route to Impact Fee Review6/19/2013 6/19/2013 PASS
DetailsCindy M. Gould
Routing - PLANNING Land Div6/19/2013 6/19/2013 PASS
DetailsDave Abo
Parcel over 5 acres in size.
Routing - PUBLIC WORKS6/19/2013 6/19/2013 PASS
DetailsBeverly Mountain
Pending Assignment by JCM6/19/2013 6/19/2013 DONE
DetailsJohn Menard
Intake Approval  6/18/2013 PASS
DetailsCarl D Madsen
Intake Approval  6/6/2013 FAIL
Please provide the following items.
1. Provide the completed form 502 checklist with all applicable items.
2. Review the e-plan review submittal requirements. the link is attached to tjis E-Mail. Specifically the stamping are on the plan sheets is not correctly placed.
Application received  6/5/2013 DONE
Application submitted via PDS Online on Jun 5 2013 2:23PM