Permit Information
Permit NumberBLD13-01452
StatusIssued
Name C2 CONSTRUCTION
Site Address 1105 N 13TH ST
Project NameNORTH JR HIGH SCHOOL
Customer Number 
ePlanReviewNo
Description
(NORTH JUNIOR HIGH – Storage room / classroom remodel – Basement) To remodel an existing 1,806 square foot storage and electrical room in the basement to become a new classroom. This building is fire sprinklered for area increase. Scope of work: construct interior non-bearing walls to create a new classroom in the basement, demo portion of masonry wall, demo stairs (pour flush), installation of new accessible doors / hardware, minor electrical, new mechanical, and installation of new interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/8/201310/9/201310/9/2013PPASS
DetailsTom Arcoraci
Later the better/please call ahead for access - Miguel Phone #: ###-####
FIRE-Final Inspection10/8/201310/8/201310/8/2013PPASS
DetailsForrest France
Fire life safety final approved.
FIRE-Final Inspection10/8/201310/8/201310/8/2013APASS
DetailsForrest France
Fire life safety finaled.
BLD-Final10/3/201310/4/201310/7/2013PPEND
DetailsTony Young
Please call at least 30 mins prior to insepction so he can meet you there--Antonio Phone #: ###-####
FIRE-Final Inspection10/3/201310/4/201310/4/2013ANR
DetailsForrest France
Refer to fire code review notes item number 17 and stamped plan sheet E101 for details regarding fire alarm permit work necessary due to relocated horn/strobe and revised coverage area at the new classroom. Fire life safety pending fire alarm permit application, review, field test and inspection final. Remainder of life safety inspection okay.
BLD-Final10/2/201310/3/201310/3/2013ANR
DetailsTony Young
ANTNIO Phone #: ###-####,, need trades..
BLD-Framing/Rough-in8/29/20138/30/20138/30/2013APART
DetailsTony Young
antonio Phone #: ###-####,, walls ok to cover
Issue PAID IN FULL permit  7/30/2013 DONE
DetailsChristina Prado
Routing - PLAN CHECK6/20/2013 6/26/2013 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  6/26/2013 DONE
DetailsTim L. Woodard
Case Summary (BLD)  6/26/2013 DONE
DetailsTim L. Woodard
Print Occupancy Form  6/26/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  6/26/2013 DONE
DetailsTisha Gallop
Telephone call  6/26/2013 DONE
DetailsTisha Gallop
called Jason Butler and told him permit is ready, fee due and need GC.
Plan assigned to (TLW)6/6/2013 6/26/2013 PASS
DetailsTim L. Woodard
First Review complete / North Jr. High
Plan resubmittals received  6/25/2013 DONE
DetailsChristina Prado
Received one copy of response letter and two sets of revised plans sheets marked G101 & F101; Taken to Tim for further review
1st review completed  6/20/2013 FAIL
Failed plan check
Routing - FIRE6/17/2013 6/20/2013 PASS
DetailsScott Arellano
Attached review comments to plans.
Routing - PLAN CHECK6/12/2013 6/17/2013 FAIL
DetailsTim L. Woodard
Review Plan Review Report. TLW
Routing - MECHANICAL6/6/2013 6/12/2013 PASS
DetailsTroy James
Troy James - School project
Routing - ELECTRICAL6/11/2013 6/11/2013 PASS
DetailsDoug A Poedy
Doug Poedy - School Project
Pending Assignment by JCB6/5/2013 6/6/2013 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  6/5/2013 DONE
DetailsChristina Prado
Intake Approval  6/5/2013 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  6/5/2013 DONE
DetailsChristina Prado
Application received 6/5/2013