BLD-Final | 5/15/2014 | 5/16/2014 | 5/16/2014 | P | PASS |
Dave Hannah
|
|
|
Jim Greenwood Phone #: ###-####,, after 3
|
DOC - Permit Finaled | 5/16/2014 | 5/16/2014 | 5/16/2014 | P | PASS |
Dave Hannah
|
|
|
|
Zoning Approval | 5/16/2014 | 5/16/2014 | 5/16/2014 | | FAIL |
Matthew A Halitsky
|
|
|
Parking, landscaping, window recess.
|
BLD-Final | 5/15/2014 | 5/15/2014 | 5/15/2014 | P | PART |
Tony Young
|
|
|
Jim Greenwood Phone #: ###-####,, need historical,, need front and rear steps to have handrail or landing for 3 risers,, inside all ok
|
BLD-Energy code compliance | 2/5/2014 | 2/5/2014 | 2/6/2014 | P | PASS |
Dave Hannah
|
|
|
Look on the French door, South West corner main level for the paper work from Momentum.
Questions: call Jim Phone #: ###-#### >> Inspection requested via web by James Greenwood
|
BLD-Wall cover | 2/5/2014 | 2/5/2014 | 2/6/2014 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by James Greenwood
|
BLD-Framing/Rough-in | 1/30/2014 | 1/31/2014 | 1/31/2014 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by James Greenwood
|
BLD-Framing/Rough-in | 1/30/2014 | 1/30/2014 | 1/30/2014 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by James Greenwood,, walk through only,, need fireplace approval,, need plans,, straps,, etc..
|
BLD-Wall Bracing | 12/31/2013 | 12/31/2013 | 12/31/2013 | P | PART |
Jim Sly
|
|
|
The back porch is now framed and needs inspected prior to siding. Call Jim ###-#### w/any questions. Phone #: ###-#### >> Inspection requested via web by James Greenwood Back patio cover and deck OK to Cover.
|
BLD-Footing | 11/27/2013 | 12/2/2013 | 12/2/2013 | P | PASS |
Dave Hannah
|
|
|
dane Phone #: ###-####
|
Routing - PLAN CHECK | 11/27/2013 | | 11/27/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
addition or rear covered deck as noted with corrections
|
Routing - Design Review | 11/27/2013 | | 11/27/2013 | | PASS |
Sarah Schafer
|
|
|
DR13-00359
|
Case Summary (BLD) | | | 11/27/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/27/2013 | | DONE |
Tisha Gallop
|
|
|
deferred submittal approved, no fees due.
|
Plan Modification Accepted | | | 10/31/2013 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 10/31/2013 | | 10/31/2013 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Wall Bracing | 10/29/2013 | 10/30/2013 | 10/30/2013 | A | PASS |
Dave Hannah
|
|
|
mike Phone #: ###-####
|
BLD-Foundation | 8/27/2013 | 8/27/2013 | 8/28/2013 | P | PASS |
Dave Hannah
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 8/19/2013 | 8/19/2013 | 8/20/2013 | P | PART |
Dave Hannah
|
|
|
dane Phone #: ###-#### basement ftg ok to place concrete
|
CHANGE STATUS TO (ISS) | | | 8/9/2013 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 8/9/2013 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 8/8/2013 | | |
|
|
|
|
Plan assigned to (AJS) | 8/2/2013 | 8/2/2013 | 8/8/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
plan mod/ needs DR approval
|
Routing - PLAN CHECK | 8/6/2013 | | 8/8/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Called Jim to let him know plan review fee would need to be repaid as there were substantial changes to the plan. Called Ken need beam sizes in basement that were not shown in calcs or on plans. revised valuation based on new plans
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/8/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 8/8/2013 | | 8/8/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Permit Ready to Issue | | | 8/8/2013 | | DONE |
Tisha Gallop
|
|
|
plan mod ready
|
Telephone call | | | 8/8/2013 | | DONE |
Tisha Gallop
|
|
|
called Jim and told him plan mod ready and fee due.
|
Routing - PLANNING | 8/5/2013 | | 8/6/2013 | | PASS |
Matthew A Halitsky
|
|
|
Route to Plan Check.
|
Plan Modification Accepted | | | 8/2/2013 | | DONE |
Christina Prado
|
|
|
Received two complete sets of revised plans as well as structural calcs - Plan mod to add additional square footage by modifying existing approved floor plan
|
OVERRIDE | | | 6/21/2013 | | |
|
|
|
|
Plan assigned to (AJS) | | 6/6/2013 | 6/21/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed, did not review elevations and site plan are not what was approved by historic reviewDue 6/19
|
Routing - PLAN CHECK | 6/20/2013 | | 6/21/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 6/21/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/21/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 6/21/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 6/21/2013 | | DONE |
Barbara Stitt
|
|
|
Called Jim and told him that permit is ready & fees due on 6-21-13 @ 4:10pm///BAS
|
Issue PAID IN FULL permit | | | 6/21/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING | 6/20/2013 | | 6/20/2013 | | PASS |
Matthew A Halitsky
|
|
|
|
1st review completed | | | 6/18/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 6/18/2013 | | 6/18/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
spoke with Jim, I will not do the plan review until the site and elevations are approved by planning. 6/18/13
|
Routing - MECHANICAL | | | 6/18/2013 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/7/2013 | | 6/17/2013 | | FAIL |
Matthew A Halitsky
|
|
|
Elevations and site plan do not match HPC approval. Modification required. Notified architect (Ken Reed) 6-17-2013.
|
Route to Impact Fee Review | 6/6/2013 | 6/11/2013 | 6/7/2013 | | PASS |
Cindy M. Gould
|
|
|
Credit for demo of existing house BLD13-01450
|
Routing - PUBLIC WORKS | | | 6/7/2013 | | PASS |
|
|
|
|
Application received | | 6/6/2013 | 6/6/2013 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/6/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/6/2013 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/6/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - Addressing | 6/6/2013 | | 6/6/2013 | | PASS |
Jason C. Taylor
|
|
|
|