PubWorks Occupancy Approval | 6/5/2014 | 6/5/2014 | 6/5/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
Letter of compliance/Occupancy | | | 3/25/2014 | | DONE |
Tisha Gallop
|
|
|
emaild to Stephanie at Jayo Const
|
BLD-Final | 1/10/2014 | 1/13/2014 | 1/13/2014 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by SHANE JAYO
|
DOC - Permit Finaled | 1/13/2014 | 1/13/2014 | 1/13/2014 | P | PASS |
Tony Young
|
|
|
done
|
PubWorks Occupancy Approval | 1/10/2014 | 1/10/2014 | 1/10/2014 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 10/21/2013 | 10/22/2013 | 10/22/2013 | A | PASS |
Tony Young
|
|
|
JEFF Phone #: ###-####
|
BLD-Framing/Rough-in | 10/16/2013 | 10/17/2013 | 10/17/2013 | P | PART |
Tony Young
|
|
|
Please call ahead for access 30-60 min - Dave Phone #: ###-####,, corrections,, ok to insulate
|
BLD-Framing/Rough-in | 10/15/2013 | 10/16/2013 | 10/16/2013 | P | FAIL |
Tony Young
|
|
|
Please call ahead for access 30-60 min - Dave Phone #: ###-####,, see paint marks/notes,, ok to insulate
|
BLD-Foundation | 9/3/2013 | 9/3/2013 | 9/3/2013 | P | PART |
Tony Young
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 8/29/2013 | 8/30/2013 | 8/30/2013 | A | PASS |
Tony Young
|
|
|
11 am if possible Phone #: ###-####
|
PubWorks Subgrade Approval | 8/30/2013 | 8/30/2013 | 8/30/2013 | | DONE |
Jason C. Taylor
|
|
|
Recieved subgrade approval from geotechnical engineer. Building department may be scheduled for footing inspections. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 8/5/2013 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 6/27/2013 | | |
|
|
|
|
Plan assigned to (AJS) | | 6/6/2013 | 6/27/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 6/25 Hillside
|
Plan resubmittals received | | | 6/27/2013 | | |
|
|
|
6-27-13 received 2 copies of sheets A-2.0 ,A-3.0, A-6.0 sent to Adele
|
Case Summary (BLD) | | | 6/27/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 6/27/2013 | | 6/27/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/27/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 6/27/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/27/2013 | | DONE |
Tisha Gallop
|
|
|
called Shane Jayo and told him permit is ready and fee.
|
Routing - MECHANICAL | 6/21/2013 | | 6/24/2013 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 6/24/2013 | | 6/24/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
sent email to Shane 6/24/13
Shane,
I have completed the review for 2514 N Pleasant Hill Way, Block 7 Lot 9 Somerset Ridge #4.
Please submit 2 sets of revised documents to address the following corrections.
1. This address is located in WUI ZONE A. Please revise the plans to include the requirements for this zone.
2. All of the plan sheets that have any engineered design shall be stamped by the engineer of record.
Please let me know if you have any questions.
Thank you
|
1st review completed | | | 6/24/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 6/20/2013 | | 6/21/2013 | | PASS |
Scott Arellano
|
|
|
No comments.
|
Routing - Erosion and Sediment | 6/18/2013 | | 6/20/2013 | | PASS |
Kimberly M. Johnson
|
|
|
PD signature recvd 6/19/2013
|
Plan resubmittals received | | | 6/20/2013 | | |
|
|
|
6-20-13 received 1 load short form sent to Adele
|
Route to Impact Fee Review | 6/6/2013 | 6/11/2013 | 6/7/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 6/7/2013 | | 6/7/2013 | | PASS |
Leon Letson
|
|
|
|
Routing - Addressing | 6/6/2013 | | 6/7/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | | | 6/7/2013 | | PASS |
|
|
|
|
Routing PW Grading-Hillside | | | 6/7/2013 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 6/6/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/6/2013 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/6/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 6/6/2013 | | | |
|
|
|
|
Routing - MECHANICAL | | | | | FAIL |
Troy James
|
|
|
no manual j for review
|