Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-01465
StatusFinaled
Name NORTHCON INC
Site Address 200 W FRONT ST
Project NameAda County Courthouse 1st & 2n
Customer Number 
ePlanReviewYes
Description
(Ada County Court House)(1st floor)Tenant improvement permit to renovate the evidence vault and reception area on the 1st floor. Scope of work to include demolition as per approved plans. Nonbearing noncombustible framing as per approved plans.(2nd Floor) - Tenant improvement on second floor reception area 767 and 4 offices. Demolition as per approved plans. Interior nonbearing noncombustible framing per approved plans. All interior finishes per chapter 8 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**AJS**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice9/27/20139/27/201310/10/2013 DONE
DetailsBarbara Stitt
Faxed 10-1-13
Letter of compliance/Occupancy  10/2/2013 DONE
DetailsBarbara Stitt
FIRE-Final Inspection9/26/20139/27/20139/27/2013APASS
DetailsForrest France
Fire life safety passed pending one additional fire extinguisher is posted within allowable travel distance at the 1st floor remodel area and one missing EM light is installed per plan at the exit hall 1st floor east side.
BLD-Final9/26/20139/27/20139/27/2013APASS
DetailsDave Hannah
rick PLEASE call before going out Phone #: ###-####
DOC - Permit Finaled9/27/20139/27/20139/27/2013PPASS
DetailsDave Hannah
BLD-Final9/25/20139/26/20139/27/2013PPASS
DetailsDave Hannah
Richard-PLease call when on your way to inspection Phone #: ###-####
BLD-Ceiling Grid Inspection9/19/20139/20/20139/20/2013APASS
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Framing/Rough-in9/13/20139/16/20139/17/2013APASS
DetailsDave Hannah
After 9AM - Rick Phone #: ###-#### repaired fire proofing on roof
BLD-Framing/Rough-in8/22/20138/23/20138/23/2013APASS
DetailsDave Hannah
richard Phone #: ###-####
Case Summary (BLD)  7/26/2013 DONE
Permit Ready to Issue  7/25/2013 DONE
DetailsBarbara Stitt
Issue PAID IN FULL permit  7/25/2013 DONE
DetailsBarbara Stitt
Inspection Record Card- Bld  7/25/2013 DONE
DetailsBarbara Stitt
Plan assigned to (AJS)6/13/20136/13/20136/18/2013 PASS
DetailsAdele J Schaffeld-Griffin
Due 6/26 Level II TI E Plan
Routing - PLAN CHECK6/13/2013 6/18/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed  6/18/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  6/18/2013 DONE
Payment Received  6/13/2013 DONE
Payment received via Govolutions
Application received  6/7/2013 DONE
Application submitted via PDS Online on Jun 7 2013 10:11AM
Intake Approval  6/7/2013 FAIL
Please provide the following items.
1. completed submittal checklist with all required items.
2. Review Eplan review submittal requirements. There is a link attached to this E-mail.
3. Provide the required stamping area in the lower right hand corner of the plan sheets per eplan review submittal requirements.
4. Plan sheets are required to follow the naming conventions to include a sheet discription per the eplan review submitta; requirements.