First Notice | 9/27/2013 | 9/27/2013 | 10/10/2013 | | DONE |
Barbara Stitt
|
|
|
Faxed 10-1-13
|
Letter of compliance/Occupancy | | | 10/2/2013 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Final Inspection | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | PASS |
Forrest France
|
|
|
Fire life safety passed pending one additional fire extinguisher is posted within allowable travel distance at the 1st floor remodel area and one missing EM light is installed per plan at the exit hall 1st floor east side.
|
BLD-Final | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | PASS |
Dave Hannah
|
|
|
rick PLEASE call before going out Phone #: ###-####
|
DOC - Permit Finaled | 9/27/2013 | 9/27/2013 | 9/27/2013 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 9/25/2013 | 9/26/2013 | 9/27/2013 | P | PASS |
Dave Hannah
|
|
|
Richard-PLease call when on your way to inspection Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 9/19/2013 | 9/20/2013 | 9/20/2013 | A | PASS |
Dave Hannah
|
|
|
Rick Phone #: ###-####
|
BLD-Framing/Rough-in | 9/13/2013 | 9/16/2013 | 9/17/2013 | A | PASS |
Dave Hannah
|
|
|
After 9AM - Rick Phone #: ###-#### repaired fire proofing on roof
|
BLD-Framing/Rough-in | 8/22/2013 | 8/23/2013 | 8/23/2013 | A | PASS |
Dave Hannah
|
|
|
richard Phone #: ###-####
|
Case Summary (BLD) | | | 7/26/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/25/2013 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 7/25/2013 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Bld | | | 7/25/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (AJS) | 6/13/2013 | 6/13/2013 | 6/18/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Due 6/26 Level II TI E Plan
|
Routing - PLAN CHECK | 6/13/2013 | | 6/18/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 6/18/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2013 | | DONE |
|
|
|
|
Payment Received | | | 6/13/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/7/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 7 2013 10:11AM
|
Intake Approval | | | 6/7/2013 | | FAIL |
|
|
|
Please provide the following items.
1. completed submittal checklist with all required items.
2. Review Eplan review submittal requirements. There is a link attached to this E-mail.
3. Provide the required stamping area in the lower right hand corner of the plan sheets per eplan review submittal requirements.
4. Plan sheets are required to follow the naming conventions to include a sheet discription per the eplan review submitta; requirements.
|