Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-01539
StatusFinaled
Name THE ROBINS & MORTON GROUP
Site Address 8800 W EMERALD ST
Project NameTreasure Valley Hospital
Customer Number 
ePlanReviewYes
Description
(TREASURE VALLEY HOSPITAL - Phase I) This permit is to permit the grading and drainage, foundation, and superstructure only. Phase II and III will be permitted under separate permits and include all tenant improvement work and all modifications to the existing structure under those phases and permits. Scope of work includes: construction of foundation, construction of steel superstructure, minor work to maintain compliant egress of occupied hospital, new plumbing, new electrical, and site work. TLW
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice12/8/201412/8/20142/2/2015 DONE
DetailsCandy A. Nichols
mailed 2/2/15
First Notice12/8/201412/8/20141/2/2015 DONE
DetailsMike Jordan
BLD-Final12/8/201412/8/201412/8/2014PPASS
DetailsMike Jordan
Charles Phone #: ###-####
DOC - Permit Finaled12/8/201412/8/201412/8/2014PPASS
DetailsMike Jordan
DOC - Permit Finaled12/8/201412/8/201412/8/2014PPASS
DetailsMike Jordan
FIRE-Final Inspection12/4/201412/4/201412/4/2014PPASS
DetailsTroy Cobbley
Life safety passed
PubWorks Occupancy Approval12/2/201412/2/201412/2/2014 DONE
DetailsTiffany Lowery
BLD-Conference1/22/20141/22/20141/22/2014PPART
DetailsMike Jordan
walk through on work in progress on phase 1, part A and B.
BLD-Other1/2/20141/2/20141/2/2014PPASS
DetailsMike Jordan
rebar insp //Charles Phone #: ###-####. Interior slab on grade, 4 inch and 6 inch slabs for phase 1 part B at gridlines 11-13/AA-J 8-13/AA-C.
BLD-Footing11/18/201311/19/201311/19/2013APASS
DetailsMike Jordan
CHARLES - REBAR Phone #: ###-####. Rebar for light weight concrete placement on roof deck of patient addition phase 1A.
BLD-Framing/Rough-in11/19/201311/19/201311/19/2013APASS
DetailsMike Jordan
CHARLES - Phone #: ###-####. INterior steel steud partition wall for xray room C135, phase 1B. Structural steel beam to column connections, roof decking as per approved plans. All special inspections for complete joint penetration welds, fillet welds puddle welds and nelson studs ok, for patient phase 1A patient addition.
BLD-Footing10/30/201310/31/201310/31/2013ACANC
DetailsMike Jordan
Charles Miller-Re-bar inspection please Phone #: ###-####
BLD-Foundation10/31/201310/31/201310/31/2013APART
DetailsMike Jordan
Charles Miller-Re-bar inspection please Phone #: ###-####. work in progress on stemwalls, area b. Will be ok for concrete after approval from special inspector.
BLD-Footing10/16/201310/17/201310/17/2013PCANC
DetailsMike Jordan
requesting around 2:30 for rebar - Charles Phone #: ###-####
BLD-Foundation10/17/201310/17/201310/17/2013PPASS
DetailsMike Jordan
requesting around 2:30 for rebar - Charles Phone #: ###-####. Permiter stemwalls, north addition ok.
BLD-Footing10/14/201310/15/201310/15/2013APART
DetailsMike Jordan
Charles Miller Phone #: ###-####. Footings on north side of building for moment frames. Strata to verify the install of plate washers on threaded anchor bolts.
FIRE-Conference9/16/20139/17/20139/17/2013ADONE
DetailsTroy Cobbley
charles miller and I went over the exiting requirements which appear to have been approved through plan review. We also discussed inspections needed for the re-routed fire line. I deferred him to the fire dept for requirements to temporarily shut down on site fire hydrants.
OVERRIDE  9/6/2013  
Issue PAID IN FULL permit  9/6/2013 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  9/6/2013  
Permit Ready to Issue  9/6/2013 DONE
Routing Off Site - STRUCTURAL8/14/2013 8/21/2013 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  8/21/2013 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)6/14/2013 8/21/2013 PASS
DetailsTim L. Woodard
ePlanReview - Treasure Valley Hospital
Routing - PLAN CHECK6/14/2013 8/21/2013 PASS
DetailsTim L. Woodard
Plan resubmittals received  8/14/2013 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK8/14/2013 8/14/2013 PASS
DetailsTim L. Woodard
Routing Off Site - STRUCTURAL7/19/2013 8/1/2013 FAIL
DetailsTim L. Woodard
Routing PW Sewer Design7/26/2013 7/26/2013 PASS
DetailsKyle S. Rosenmeyer
Routing PW Sewer Design7/19/2013 7/23/2013 FAIL
DetailsKyle S. Rosenmeyer
Cleanouts within the Boise City Sewer Easement are required to be traffic rated, per SD-506A.
Routing - PLUMBING7/19/2013 7/23/2013 PASS
DetailsDaryl Spivey
Per plan and 2009 ISPC.
Routing - PLAN CHECK7/19/2013 7/19/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK6/26/2013 7/1/2013 FAIL
DetailsTim L. Woodard
Failed Stuctural. TLW
1st review completed  7/1/2013 DONE
DetailsTim L. Woodard
Routing Off Site - STRUCTURAL6/14/2013 7/1/2013 FAIL
DetailsTim L. Woodard
Structural Failed. TLW
Routing PW Drainage6/14/2013 6/27/2013 PASS
DetailsBrian Murphy
Routing - FIRE6/14/20136/14/20136/26/2013 PASS
DetailsTim Frost
Routing PW Environmental6/14/2013 6/25/2013 PASS
DetailsWalt Baumgartner
Routing - Erosion and Sediment6/14/2013 6/19/2013 PASS
DetailsKimberly M. Johnson
Routing PW Sewer Rating6/14/2013 6/18/2013 PASS
DetailsConnie Baumgartner
Routing - Design Review6/14/2013 6/18/2013 PASS
DetailsJosh Wilson
Ok for foundation only per Ron Hill 6/18/13.
Routing - PLUMBING6/14/2013 6/17/2013 FAIL
DetailsDaryl Spivey
Waste pipe sizing to be installed per 2009 ISPC. Can only have 3 water closets on a 3 inch horizontal drain line.
Routing - Addressing6/14/2013 6/17/2013 PASS
DetailsJason C. Taylor
Routing - PLANNING Land Div6/14/2013 6/16/2013 PASS
DetailsTim L. Woodard
Routing - PUBLIC WORKS6/14/2013 6/14/2013 PASS
DetailsBeverly Mountain
Routing PW Solid Waste6/14/2013 6/14/2013 PASS
DetailsPeter J. McCullough
Intake Approval  6/14/2013 PASS
DetailsTim L. Woodard
Routing PW Street Lights6/14/2013 6/14/2013 PASS
Details
Routing PW Sewer Design6/14/2013 6/14/2013 FAIL
DetailsKyle S. Rosenmeyer
Application received  6/13/2013 DONE
Application submitted via PDS Online on Jun 13 2013 1:58PM
VOIDED CHANGE STATUS  6/13/2013 DONE
DetailsTisha Gallop
void permit, duplicate of Bld13-001524
CHANGE STATUS TO (REV)  6/13/2013 DONE
bld13-001524 is voided due to incorrect workflow and routing
BLD-Other10/31/201311/1/2013 P 
DetailsMike Jordan
rebar on a slab // charles Phone #: ###-####