First Notice | 12/8/2014 | 12/8/2014 | 2/2/2015 | | DONE |
Candy A. Nichols
|
|
|
mailed 2/2/15
|
First Notice | 12/8/2014 | 12/8/2014 | 1/2/2015 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 12/8/2014 | 12/8/2014 | 12/8/2014 | P | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####
|
DOC - Permit Finaled | 12/8/2014 | 12/8/2014 | 12/8/2014 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 12/8/2014 | 12/8/2014 | 12/8/2014 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 12/4/2014 | 12/4/2014 | 12/4/2014 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
PubWorks Occupancy Approval | 12/2/2014 | 12/2/2014 | 12/2/2014 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Conference | 1/22/2014 | 1/22/2014 | 1/22/2014 | P | PART |
Mike Jordan
|
|
|
walk through on work in progress on phase 1, part A and B.
|
BLD-Other | 1/2/2014 | 1/2/2014 | 1/2/2014 | P | PASS |
Mike Jordan
|
|
|
rebar insp //Charles Phone #: ###-####. Interior slab on grade, 4 inch and 6 inch slabs for phase 1 part B at gridlines 11-13/AA-J 8-13/AA-C.
|
BLD-Footing | 11/18/2013 | 11/19/2013 | 11/19/2013 | A | PASS |
Mike Jordan
|
|
|
CHARLES - REBAR Phone #: ###-####. Rebar for light weight concrete placement on roof deck of patient addition phase 1A.
|
BLD-Framing/Rough-in | 11/19/2013 | 11/19/2013 | 11/19/2013 | A | PASS |
Mike Jordan
|
|
|
CHARLES - Phone #: ###-####. INterior steel steud partition wall for xray room C135, phase 1B. Structural steel beam to column connections, roof decking as per approved plans. All special inspections for complete joint penetration welds, fillet welds puddle welds and nelson studs ok, for patient phase 1A patient addition.
|
BLD-Footing | 10/30/2013 | 10/31/2013 | 10/31/2013 | A | CANC |
Mike Jordan
|
|
|
Charles Miller-Re-bar inspection please Phone #: ###-####
|
BLD-Foundation | 10/31/2013 | 10/31/2013 | 10/31/2013 | A | PART |
Mike Jordan
|
|
|
Charles Miller-Re-bar inspection please Phone #: ###-####. work in progress on stemwalls, area b. Will be ok for concrete after approval from special inspector.
|
BLD-Footing | 10/16/2013 | 10/17/2013 | 10/17/2013 | P | CANC |
Mike Jordan
|
|
|
requesting around 2:30 for rebar - Charles Phone #: ###-####
|
BLD-Foundation | 10/17/2013 | 10/17/2013 | 10/17/2013 | P | PASS |
Mike Jordan
|
|
|
requesting around 2:30 for rebar - Charles Phone #: ###-####. Permiter stemwalls, north addition ok.
|
BLD-Footing | 10/14/2013 | 10/15/2013 | 10/15/2013 | A | PART |
Mike Jordan
|
|
|
Charles Miller Phone #: ###-####. Footings on north side of building for moment frames. Strata to verify the install of plate washers on threaded anchor bolts.
|
FIRE-Conference | 9/16/2013 | 9/17/2013 | 9/17/2013 | A | DONE |
Troy Cobbley
|
|
|
charles miller and I went over the exiting requirements which appear to have been approved through plan review. We also discussed inspections needed for the re-routed fire line. I deferred him to the fire dept for requirements to temporarily shut down on site fire hydrants.
|
OVERRIDE | | | 9/6/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/6/2013 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 9/6/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 9/6/2013 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 8/14/2013 | | 8/21/2013 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 6/14/2013 | | 8/21/2013 | | PASS |
Tim L. Woodard
|
|
|
ePlanReview - Treasure Valley Hospital
|
Routing - PLAN CHECK | 6/14/2013 | | 8/21/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 8/14/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 8/14/2013 | | 8/14/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 7/19/2013 | | 8/1/2013 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Sewer Design | 7/26/2013 | | 7/26/2013 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Sewer Design | 7/19/2013 | | 7/23/2013 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Cleanouts within the Boise City Sewer Easement are required to be traffic rated, per SD-506A.
|
Routing - PLUMBING | 7/19/2013 | | 7/23/2013 | | PASS |
Daryl Spivey
|
|
|
Per plan and 2009 ISPC.
|
Routing - PLAN CHECK | 7/19/2013 | | 7/19/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/26/2013 | | 7/1/2013 | | FAIL |
Tim L. Woodard
|
|
|
Failed Stuctural. TLW
|
1st review completed | | | 7/1/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 6/14/2013 | | 7/1/2013 | | FAIL |
Tim L. Woodard
|
|
|
Structural Failed. TLW
|
Routing PW Drainage | 6/14/2013 | | 6/27/2013 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 6/14/2013 | 6/14/2013 | 6/26/2013 | | PASS |
Tim Frost
|
|
|
|
Routing PW Environmental | 6/14/2013 | | 6/25/2013 | | PASS |
Walt Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 6/14/2013 | | 6/19/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing PW Sewer Rating | 6/14/2013 | | 6/18/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Design Review | 6/14/2013 | | 6/18/2013 | | PASS |
Josh Wilson
|
|
|
Ok for foundation only per Ron Hill 6/18/13.
|
Routing - PLUMBING | 6/14/2013 | | 6/17/2013 | | FAIL |
Daryl Spivey
|
|
|
Waste pipe sizing to be installed per 2009 ISPC. Can only have 3 water closets on a 3 inch horizontal drain line.
|
Routing - Addressing | 6/14/2013 | | 6/17/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLANNING Land Div | 6/14/2013 | | 6/16/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 6/14/2013 | | 6/14/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Solid Waste | 6/14/2013 | | 6/14/2013 | | PASS |
Peter J. McCullough
|
|
|
|
Intake Approval | | | 6/14/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Street Lights | 6/14/2013 | | 6/14/2013 | | PASS |
|
|
|
|
Routing PW Sewer Design | 6/14/2013 | | 6/14/2013 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
|
Application received | | | 6/13/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 13 2013 1:58PM
|
VOIDED CHANGE STATUS | | | 6/13/2013 | | DONE |
Tisha Gallop
|
|
|
void permit, duplicate of Bld13-001524
|
CHANGE STATUS TO (REV) | | | 6/13/2013 | | DONE |
|
|
|
bld13-001524 is voided due to incorrect workflow and routing
|
BLD-Other | 10/31/2013 | 11/1/2013 | | P | |
Mike Jordan
|
|
|
rebar on a slab // charles Phone #: ###-####
|