FIRE-Final Inspection | 11/25/2013 | 11/26/2013 | 11/26/2013 | A | PASS |
Craig D. Hanson
|
|
|
Exit signs have been moved and are approved. 3rd exit sign was not needed.
|
Permanent Occupancy | | | 11/26/2013 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 11/12/2013 | 11/13/2013 | 11/13/2013 | A | FAIL |
Troy Cobbley
|
|
|
Need tag on the fire exitinguisher. Need exit signage and emergency lighting as per the approved plans.
|
Print Occupancy Form | | | 11/12/2013 | | DONE |
|
|
|
|
BLD-Final | 10/24/2013 | 10/25/2013 | 10/25/2013 | P | PASS |
Mike Jordan
|
|
|
PLease call Jeffrey 45 mins prior to site visit-Jeffrey Phone #: ###-####. Ok for perm occ.
|
Override - Parcel Holds | 10/24/2013 | 1/1/1900 | 10/24/2013 | | |
|
|
|
Temp
|
BLD-Conference | 9/23/2013 | 9/23/2013 | 9/23/2013 | P | DONE |
Mike Jordan
|
|
|
troy Phone #: ###-####. walk through on pool. exit signage still needs to be posted and other trades final.
|
BLD-Other | 8/16/2013 | 8/16/2013 | 8/16/2013 | P | PASS |
Tom Arcoraci
|
|
|
rebar for pool//troy Phone #: ###-####
|
Plan assigned to (AJS) | 6/17/2013 | 6/17/2013 | 8/6/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 7/12 Level 3 Commercial Pool
|
Print Occupancy Form | | | 8/6/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 8/6/2013 | | 8/6/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 8/6/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2013 | | DONE |
|
|
|
|
Telephone call | | | 8/6/2013 | | DONE |
Christina Prado
|
|
|
called Troy to advise permit is ready for pick up and gave fes due
|
Override - Parcel Holds | | | 8/6/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 8/6/2013 | | DONE |
Christina Prado
|
|
|
|
Override - Parcel Holds | | | 8/6/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/6/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 8/2/2013 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets S0.01, S1.00, S1.01, S1.02, S1.03 & S1.04 as well as one response letter;Plans taken to Adele for review
|
1st review completed | | | 7/9/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 6/24/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 6/20/2013 | | 6/24/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see plan review letter in documents emailed to troy 6/24/13
|
Routing - PLUMBING | 6/20/2013 | | 6/20/2013 | | PASS |
Bill VanDegrift
|
|
|
--Pool equipment has no sewer discharge----
1) if drainage is not provided for the pool makeup R.P. permanent connection will not be allowed.
|
Routing - PLUMBING | 6/20/2013 | | 6/20/2013 | | PASS |
Bill VanDegrift
|
|
|
see other routing
|
Routing - Design Review | 6/19/2013 | | 6/20/2013 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - DRH12-00344
|
Routing - PLUMBING | 6/19/2013 | | 6/19/2013 | | FAIL |
Bill VanDegrift
|
|
|
Require plan showing plumbing for pool equipment disharge piping.
|
Routing - Erosion and Sediment | 6/18/2013 | | 6/19/2013 | | CANC |
Kimberly M. Johnson
|
|
|
No ESC required. See ESC12-01219
|
Routing - FIRE | 6/17/2013 | 6/17/2013 | 6/18/2013 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing - PUBLIC WORKS | 6/17/2013 | | 6/18/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 6/17/2013 | | 6/18/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Sewer Rating | 6/17/2013 | | 6/18/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/17/2013 | | |
|
|
|
Ok per Tim W to take in
|
Intake Approval | | | 6/17/2013 | | PASS |
Tim L. Woodard
|
|
|
|
First Notice | | 12/6/2013 | | | |
|
|
|
|
Application received | | 6/17/2013 | | | |
|
|
|
|
Pending Assignment by JCB | 6/17/2013 | | | | |
Jason Blais
|
|
|
|