BLD-Final | 6/29/2016 | 6/30/2016 | 6/30/2016 | A | PASS |
Mike Jordan
|
|
|
Dan Phone #: ###-####
|
DOC - Permit Finaled | 6/30/2016 | 6/30/2016 | 6/30/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 6/3/2016 | 6/3/2016 | 6/3/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 1/21/2016 | 1/21/2016 | 1/21/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 1/20/2016 | 1/20/2016 | 1/21/2016 | | PASS |
Tony Young
|
|
|
|
Elevation Cert Rec'd-Final | | | 12/7/2015 | | DONE |
|
|
|
Elevation Certificate documenting finish construction conditions has been received and approved.
Jim Wyllie / ###-####
|
BLD-Energy code compliance | 9/8/2015 | 9/8/2015 | 9/8/2015 | P | PASS |
Tony Young
|
|
|
Dan Phone #: ###-####
|
BLD-Framing/Rough-in | 8/28/2015 | 8/28/2015 | 8/28/2015 | A | PASS |
Tony Young
|
|
|
3771072 Ben
|
Override - Parcel Holds | | | 8/28/2015 | | |
|
|
|
|
Routing Walk-In (BLD) | 8/7/2015 | 8/7/2015 | 8/7/2015 | A | PASS |
Tisha Gallop
|
|
|
wants to add the unfinished upstairs to this permit so that it can be completed. Said the wall between living room and bedroom was added after this permit was issued
|
Inspection Record Card- Bld | | | 8/7/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/7/2015 | | DONE |
|
|
|
|
BLD-Other | 4/7/2015 | 4/8/2015 | 4/8/2015 | A | PASS |
Tony Young
|
|
|
Daniel// inspection for stairs Phone #: ###-####
|
BLD-Energy code compliance | 2/23/2015 | 2/24/2015 | 2/24/2015 | A | PART |
Tony Young
|
|
|
Dan Phone #: ###-####,, garage ok to cover
|
Override - Parcel Holds | 2/23/2015 | 1/1/1900 | 2/23/2015 | | |
|
|
|
energy inspection
|
BLD-Framing/Rough-in | 12/3/2014 | 12/3/2014 | 12/3/2014 | P | PART |
Tony Young
|
|
|
Dan Phone #: ###-####,, garage walls ok to insulate,, will run power in conduit externaly
|
BLD-Concrete | 8/18/2014 | 8/19/2014 | 8/19/2014 | A | PASS |
Tony Young
|
|
|
Dan Phone #: ###-####,, carport ftgs and slab ok
|
BLD-Framing/Rough-in | 8/7/2014 | 8/7/2014 | 8/7/2014 | P | PASS |
Jim Storey
|
|
|
Dan Renk ###-####exterior ok to cover.
|
Override - Parcel Holds | | | 8/7/2014 | | |
|
|
|
|
BLD-Conference | 6/5/2014 | 6/5/2014 | 6/5/2014 | P | PASS |
Tony Young
|
|
|
Dan Phone #: ###-####,, general ?s
|
Elevation Cert Rec'd-Final | | | 5/7/2014 | | PASS |
|
|
|
Need another Elevation Certificate that contains the elevation of the top of the platform for machineryand /or equipment servicing the building. This can be provided when the equipment is placed.
|
BLD-Foundation | 3/24/2014 | 3/24/2014 | 3/24/2014 | P | PASS |
Tony Young
|
|
|
Dan-Please call prior to inspection Phone #: ###-####,, interior wall ok and b3 post ftgs
|
Override - Parcel Holds | | | 3/24/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/24/2014 | | DONE |
|
|
|
|
Plan assigned to (PEP) | 2/21/2014 | 2/21/2014 | 3/10/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/10/2014 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 2/21/2014 | 2/21/2014 | 2/21/2014 | P | PASS |
Perry Paine
|
|
|
need 1-0" above finish grade in alluvial fan. per jim wyllie
|
Case Summary (BLD) | | | 2/21/2014 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/21/2014 | | |
|
|
|
|
BLD-Energy code compliance | 11/22/2013 | 11/22/2013 | 11/22/2013 | P | PASS |
Tony Young
|
|
|
Late afternoon -Stem wall insulation - Dan Phone #: ###-####
|
BLD-Foundation | 10/30/2013 | 10/31/2013 | 10/31/2013 | P | PASS |
Tony Young
|
|
|
Dan Phone #: ###-####
|
Override - Parcel Holds | 10/30/2013 | 1/1/1900 | 10/30/2013 | | |
|
|
|
foundation only
|
BLD-Footing | 10/25/2013 | 10/25/2013 | 10/25/2013 | P | PASS |
Tony Young
|
|
|
Dan Phone #: ###-####
|
OVERRIDE | | | 9/4/2013 | | |
|
|
|
|
OVERRIDE | | | 9/4/2013 | | |
|
|
|
|
OVERRIDE | | | 9/4/2013 | | |
|
|
|
|
OVERRIDE | | | 9/4/2013 | | |
|
|
|
|
OVERRIDE | | | 9/4/2013 | | |
|
|
|
|
OVERRIDE | | | 9/4/2013 | | |
|
|
|
|
Plan assigned to (AJS) | | 6/27/2013 | 9/4/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 7/15
|
Application received | | 6/17/2013 | 9/4/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/4/2013 | | 9/4/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 9/4/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/4/2013 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 9/4/2013 | | 9/4/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Flood Plain | 9/4/2013 | | 9/4/2013 | | PASS |
Jim Wyllie
|
|
|
Two more elevation certificates will be required. One prior to receiving a framing inspection (building under construction)and one prior to receiving a final occupancy permit (based upon finish construction). Jim Wyllie (###-####)
|
Telephone call | | | 9/4/2013 | | DONE |
Christina Prado
|
|
|
called Dan to advise permit is ready for pick up and gave fees due
|
Override - Parcel Holds | | | 9/4/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 9/4/2013 | | DONE |
Christina Prado
|
|
|
|
Override - Parcel Holds | | | 9/4/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/4/2013 | | DONE |
|
|
|
|
Elevation Cert Rec'd-Prelim | | | 8/27/2013 | | PASS |
|
|
|
Elevation certicicate received. A second elevation certificate is required prior to scheduling a framing inspection. A third elevation certificate based upon finished construction is required prior to obtaining building occupancy. Jim Wyllie (###-####)
|
Routing - PLAN CHECK | 7/9/2013 | | 7/15/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
emailed Daniel 7/15/13
Daniel,
I have completed the plan review for BLD13-01573. I met with Jim Wylie this afternoon to discuss the pit shown on the plans. Jim indicated to me that the pit would not be permitted. Please contact him in regards to all flood plain requirements.
If the pit was allowed you would need to submit a design for the walls of the pit. The design and calculations would need to show the surcharge from the vehicles accounted into the design. You would also need to provide the design for guard/rails or fall protection required due to the change in elevation of the floor.
Please show the finished floor elevation on the plans.
Please let me know how you wish to proceed with the pit.
The items above are the only outstanding items from my plan review.
Please let me know if I can be of any assistance.
Thank you
Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####
|
1st review completed | | | 7/15/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Flood Plain | 7/3/2013 | | 7/9/2013 | | PASS |
Jim Wyllie
|
|
|
Elevation Certificate is not correct. Item A7 should be 1B. Page 2 needs property address. Section E needs to be filled out. Comment should be added regarding finish grade entry into shop. A foundation stem wall form inspection is required prior to placement of concrete. Jim Wyllie (###-####).
|
Route to Impact Fee Review | 6/27/2013 | 7/2/2013 | 7/2/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - MECHANICAL | | | 7/1/2013 | | PASS |
Troy James
|
|
|
hydronic floor heat and no cooling design.
|
Routing - PLANNING | 7/1/2013 | | 7/1/2013 | | PASS |
Leon Letson
|
|
|
|
Routing - Addressing | 6/27/2013 | | 7/1/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | | | 7/1/2013 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Jim Wylie for floodplain issues.
|
Plans ACCEPTED BY PLAN TECH | | | 6/27/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/27/2013 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/27/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/17/2013 | | FAIL |
|
|
|
Pit environmental Walt Baumgartner###-####
Slab-in garage insulation
Wall bracing
Headers for garage
Energy code compliance on drawing
Bracing on carport
Heat for garage need the BTU
Per Troy James manual J not needed
|