BLD-Energy code compliance | 9/24/2014 | 9/25/2014 | 9/25/2014 | A | PASS |
Phil Shearer
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 9/22/2014 | 9/23/2014 | 9/23/2014 | A | PASS |
Phil Shearer
|
|
|
David// please call before Phone #: ###-####
|
BLD-Footing | 8/25/2014 | 8/26/2014 | 8/26/2014 | A | PASS |
Phil Shearer
|
|
|
Tim Phone #: ###-####
|
Routing Walk-In (BLD) | 7/29/2014 | 7/29/2014 | 7/29/2014 | A | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 7/29/2014 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/29/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/25/2013 | | DONE |
|
|
|
|
OVERRIDE | | | 6/18/2013 | | |
|
|
|
|
Telephone call | | | 6/18/2013 | | DONE |
Christina Prado
|
|
|
gave rep fees due and advised permit cannot be issued without a valid RP & GC
|
Permit Ready to Issue | | | 6/18/2013 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (Zoning) | 6/17/2013 | 6/17/2013 | 6/17/2013 | P | PASS |
Leon Letson
|
|
|
|
Routing Walk-In (PW Hillside) | 6/17/2013 | 6/17/2013 | 6/17/2013 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (BLD) | 6/17/2013 | 6/17/2013 | 6/17/2013 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 6/17/2013 | 6/17/2013 | 6/17/2013 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 6/17/2013 | | |
|
|
|
|
1st review completed | | | 6/17/2013 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2013 | | DONE |
|
|
|
|
Application received | | 6/17/2013 | | | |
|
|
|
|