FIRE-Final Inspection | 12/3/2013 | 12/4/2013 | 12/4/2013 | A | FAIL |
Forrest France
|
|
|
C/N items include; post fire extinguisher as discussed, cover open electrical junction boxes at the ceiling, remove exit sign at the back door or provide approved hardware.
|
Issue PAID IN FULL permit | | | 11/26/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 6/18/2013 | | 6/25/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/18/2013 | | 6/25/2013 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 6/25/2013 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/25/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/25/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 6/25/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 6/25/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 6/25/2013 | | DONE |
Barbara Stitt
|
|
|
Left message for Steve Hensley that permit is ready on 6-25-13 @ 3:15pm//BAS
|
Plans ACCEPTED BY PLAN TECH | | | 6/18/2013 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/18/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 6/18/2013 | | | |
|
|
|
|