Permit Information
Permit NumberBLD13-01621
StatusIssued
Name SPRING CREEK CONTRACTORS
Site Address 629 E BRAEMERE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the replacement of 322S.F. existing trex decking on an above grade deck with 6 X 6 support posts and a triple 2 X 10 beam. The new decking will be a product that meets the WUI requirements. Trex Transend or equal. There is also to be a new shade cover over the deck using heavy timber wood construction for the main structure and fire retardant treated wood of other noncombustible material for the "slats". the project is also to include the removal of an existing wood retaining wall ABOUT 40 L.F. and replacing it with a new fully engineered concrete retaining wall. R-1B ok per Colleen Carroll. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason at 384-3946. All per the approved plans as marked, Engineering details and calculations / modified WUI requirements and Erosion & Sediment Plan Approval along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Foundation7/17/20137/17/20137/17/2013PPART
DetailsTony Young
call before to meet//Andy Phone #: ###-####,, retaining wall,, work in progress
BLD-Footing7/10/20137/10/20137/10/2013PPASS
DetailsTony Young
please call ahead to meet contractor on site - andy Phone #: ###-####
PubWorks Subgrade Approval7/10/20137/10/20137/10/2013 DONE
DetailsJason C. Taylor
Recieved subgrade approvel letter from geotechnical engineer. Building department may be scheduled for footing inspections. Jason Talyor ###-####.
BLD-Footing7/9/20137/9/20137/9/2013PNR
DetailsJim Sly
call for access - andy Phone #: ###-####
Need Approval from P/W.
Issue PAID IN FULL permit  6/24/2013 DONE
DetailsChristina Prado
Plan assigned to (PEP)6/20/20136/20/20136/21/2013 PASS
DetailsKimberly M. Johnson
Routing Walk-In (Erosion)6/20/20136/20/20136/21/2013PDONE
DetailsKimberly M. Johnson
Routing - Erosion and Sediment6/20/2013 6/21/2013 PASS
DetailsKimberly M. Johnson
PLANS/APPL TAKEN TO FRONT DESK  6/21/2013  
PLANS/APPL TAKEN TO FRONT DESK  6/21/2013 DONE
Inspection Record Card- Bld  6/21/2013 DONE
Permit Ready to Issue  6/21/2013  
Telephone call  6/21/2013  
6-21-13 called Andrew Zior permit ready and fee given ///dld
Application received 6/20/20136/20/2013 DONE
DetailsBarbara Stitt
Routing Walk-In (PW Hillside)6/20/20136/20/20136/20/2013PPASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Routing Walk-In (Zoning)6/20/20136/20/20136/20/2013PPASS
DetailsColleen T Carroll
Routing Walk-In (BLD)6/20/20136/20/20136/20/2013PDONE
DetailsCarl D Madsen
Inspection Record Card- Bld  6/20/2013  
1st review completed  6/20/2013 DONE