Third Notice | | 9/8/2014 | 9/18/2014 | | DONE |
Christina Prado
|
|
|
follow up
|
Third Notice | | 6/14/2014 | 9/3/2014 | | DONE |
|
|
|
mailed with letter to Western Idaho Bldrs
|
Third Notice | | 5/10/2014 | 6/9/2014 | | DONE |
|
|
|
mailed
|
Third Notice | | 3/5/2014 | 5/5/2014 | | DONE |
|
|
|
wait for Bld13-01020 /// mailed
|
Second Notice | | 1/9/2014 | 2/28/2014 | | DONE |
Christina Prado
|
|
|
wait for main bld permit Bld13-01020 to perm, they bonded for site work not completed.
mailed 2/28
|
First Notice | 11/19/2013 | 11/19/2013 | 12/30/2013 | | DONE |
Jim Storey
|
|
|
mailed 12-30-13
|
BLD-Final | 11/19/2013 | 11/19/2013 | 11/19/2013 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 11/19/2013 | 11/19/2013 | 11/19/2013 | P | PASS |
Jim Storey
|
|
|
|
Plan Modification Accepted | | | 11/18/2013 | | |
|
|
|
11-18-13 plan modification accepted for BLD13-01622 For the grading for the west half of the sitehad to be modified to accommodate a valley gutter that was not installed originally parallel to Rose Hill at the enterance to the site. The valley gutter had to be replacedwith pipe connecting a new catch basin to an existing one. As part of the re-grading a small additional infiltration facility had tobe installed near the southwest corner of the site. sheets C1.2,C1.3,& C2.1 . gave to Christina Prado.
|
Plan assigned to Christina | 11/18/2013 | | 11/18/2013 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/18/2013 | | DONE |
Christina Prado
|
|
|
No need for a plan mod- changes are as builts intended only for Jason Taylor's records. No review required
|
OVERRIDE | | | 6/25/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/25/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 6/25/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - FIRE | 6/24/2013 | 6/24/2013 | 6/24/2013 | | PASS |
Scott Arellano
|
|
|
Per sign off in BLD13-01020
|
Plan assigned to (CDM) | 6/20/2013 | 6/20/2013 | 6/24/2013 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 6/20/2013 | | 6/24/2013 | | PASS |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 6/24/2013 | | 6/24/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Routing - PUBLIC WORKS GRADING | 6/24/2013 | | 6/24/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Plan assigned to Christina | 6/24/2013 | | 6/24/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING | 6/24/2013 | | 6/24/2013 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLANNING Land Div | 6/24/2013 | | 6/24/2013 | | PASS |
Todd Tucker
|
|
|
Per sign off approval in BLD13-01020
|
Routing - PUBLIC WORKS | 6/24/2013 | | 6/24/2013 | | PASS |
Connie Baumgartner
|
|
|
Per sign off in BLD13-01020
|
Inspection Record Card- Bld | | | 6/24/2013 | | DONE |
Christina Prado
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2013 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 6/24/2013 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/20/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 6/20/2013 | | | |
|
|
|
|