Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD13-01633
StatusFinaled
Name ESI
Site Address 800 W MAIN ST Unit: 110
Project NameRUTH'S CHRIS STEAK HOUSE
Customer Number 
ePlanReviewYes
Description
(RUTH'S CHRIS STEAK HOUSE – 8th & Main – Ste# 110) Permit is to build out a first time a 8,040 square foot restaurant on the first floor of a high-rise building. Approval is contingent on adhering to the approved plans and attached documents. Work to include: [construction of interior non-bearing walls to create 4 separate dining areas, a bar area, a waiting area, a wine room, 4 storage closets, an employee separate sex restroom, a kitchen area, and two offices], installation of new lighting, new plumbing, new cooking equipment, new grease duct, new accessible doors / hardware, new mechanical, and interior finishes. Separate fire sprinkler, fire alarm and cooking hood fire suppression permits will be required; as regulated by the Boise Fire Department. NOTE: The grease duct is not approved as part of this permit and is listed as a deffered submittal item. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/3/201410/9/2014 DONE
This permit finaled on the web by Adam Johnson
Third Notice 6/14/20148/29/2014 DONE
e-mailed to Adam Johnson
Third Notice 5/10/20146/9/2014 DONE
e-mailed to Adam Johnson
Third Notice 4/5/20145/5/2014 DONE
e-mailed to Adam Johnson
Second Notice 3/16/20143/31/2014 DONE
First Notice 2/2/20143/6/2014 DONE
BLD-Final1/23/20141/23/20141/23/2014PPASS
DetailsTony Young
Request for final inspection sign off of Ruth''s Chris restaurant. Electrical will be signed off by Noon. Please contact Adam when available, ###-####. Thanks. Phone #: ###-#### >> Inspection requested via
web by Adam Johnson,,, ok for perm c of o
FIRE-Final Inspection1/21/20141/22/20141/23/2014PPASS
DetailsCraig D. Hanson
emergency lighting and generator pass
Permanent Occupancy  1/23/2014 DONE
BLD-Conference1/21/20141/22/20141/22/2014APASS
DetailsDave Hannah
Meeting on site with Dave H. requested in ESI field office, followed by site visit if necessary. Please call Adam with any questions. ###-#### Phone #: ###-#### >> Inspection requested via web by Adam Johnson
FIRE-Final Inspection1/21/20141/21/20141/22/2014PFAIL
DetailsCraig D. Hanson
Emergency generator failure, Emergency lighting failure.
CHANGE STATUS TO (ISS)  1/21/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/21/2014 DONE
DetailsTim L. Woodard
Permit Ready to Issue  1/21/2014 DONE
Plan assigned to (TLW)1/13/2014 1/21/2014 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK1/13/2014 1/21/2014 PASS
DetailsTim L. Woodard
Routing - MECHANICAL1/13/2014 1/15/2014 PASS
DetailsTroy James
Routing - PLUMBING1/13/2014 1/14/2014 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Plan Modification Accepted  1/13/2014 DONE
DetailsTim L. Woodard
Grease hood fan modification, modern fold door, and miisc lighting, plumbing and architectural details.
BLD-Ceiling Grid Inspection1/7/20141/8/20141/9/2014APASS
DetailsDave Hannah
Ceiling Grid Inspection, AM Wednesday, Ruths Chris, Per Mike Beeson. Thanks AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
Print Occupancy Form  1/9/2014 DONE
DetailsChristina Prado
BLD-Framing/Rough-in12/6/201312/9/201312/9/2013APASS
DetailsDave Hannah
Follow up documentation to Fridays inspection of Ruths Chris w/Mike Beeson. Thanks. akj Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover the rest of the hard ceilings
BLD-Framing/Rough-in11/22/201311/25/201311/25/2013APASS
DetailsDave Hannah
Framing inspection of Ruths Chris, 1st Floor. Per Mike Beeson, thanks. akj Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in11/6/201311/6/201311/7/2013PPART
DetailsDave Hannah
Framing inspection of Ruths Chris, 8th and Main 1st Floor, Mike Beeson, Thanks. ###-#### Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover walls servce area
BLD-Conference10/31/201311/1/201311/1/2013APART
DetailsDave Hannah
Permit was Pulled 10-31, Plans sent to print shop, if you could do a framing inspection around 10-10:30 please. Call Adam to confirm Plans on site to coordinate. ###-#### Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover walls inkitchen area.
Issue PAID IN FULL permit  10/31/2013 DONE
DetailsBarbara Stitt
Print Occupancy Form  10/31/2013 DONE
DetailsBarbara Stitt
Print Occupancy Form  10/25/2013 DONE
DetailsBarbara Stitt
Permit Ready to Issue  10/25/2013 DONE
DetailsBarbara Stitt
Routing - MECHANICAL10/9/2013 10/9/2013 PASS
DetailsTroy James
Mechanical items to be deferred.
PLANS/APPL TAKEN TO FRONT DESK  10/9/2013 PASS
DetailsJason Blais
Plan assigned to (TLW)7/30/2013 10/9/2013 PASS
DetailsTim L. Woodard
1st Review Completed Ruth's Chris
Routing - PLAN CHECK10/8/2013 10/8/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK9/3/2013 9/9/2013 FAIL
DetailsTim L. Woodard
Refer to change marks in E-Plan. TLW
Telephone call  9/9/2013 DONE
DetailsTim L. Woodard
Called Ryan Griffiths to discuss last of review items. Informed him we could issue a Partial Permit at this point if needed. TLW
Routing - MECHANICAL9/3/2013 9/4/2013 FAIL
DetailsTroy James
eplan
Routing PW Sewer Rating9/3/2013 9/3/2013 PASS
DetailsConnie Baumgartner
Plan resubmittals received  9/3/2013 DONE
DetailsTim L. Woodard
Plans approved
Routing - FIRE7/30/20137/30/20138/19/2013 PASS
DetailsScott Arellano
Attached review comments to case and plans.
Routing - PLAN CHECK7/30/2013 8/19/2013 FAIL
DetailsTim L. Woodard
Refer to E-plan changemarks. TLW
1st review completed  8/19/2013 FAIL
DetailsTim L. Woodard
Routing - PLUMBING7/30/2013 8/1/2013 PASS
DetailsBill VanDegrift
1)R.P. on water to soda.
2) 2" vent required on the 3" floor sink at the water softener.
3) vent combination waste and vent system per ISPC.
4)indirect water heater to be double wall with leak detection.
Routing - PUBLIC WORKS7/30/2013 7/31/2013 PASS
DetailsConnie Baumgartner
Routing - Design Review7/30/2013 7/31/2013 PASS
DetailsSarah Schafer
Sarah Schafer - Approved per DRH11-00240.
Routing PW Sewer Rating7/30/2013 7/31/2013 FAIL
DetailsConnie Baumgartner
Will need to resubmit floor plans per Tim Woodard. Will calculate customer service area then.
Routing PW Environmental7/30/2013 7/30/2013 PASS
DetailsWalt Baumgartner
Routing - Addressing7/30/2013 7/30/2013 PASS
DetailsJason C. Taylor
Payment Received  7/29/2013 DONE
Payment received via Govolutions
Intake Approval  7/29/2013 PASS
DetailsJason Blais
Prescreen passed on 7/26/13. Plan Review Fees paid on 7/29/13.
Telephone call  7/22/2013 DONE
DetailsAdele J Schaffeld-Griffin

email sent 7/22/13

Update

I spoke with Ryan on Thursday 7/18 and he told me the plans would be submitted on Friday 7/19.

On Friday afternoon I spoke with both Ryan and Lyle about the status as I had not received the revised plans. Lyle told me they were having a hard time trying to get a hold of an architect. They were trying to contact Babcock and could not get a call back from them. Lyle told me I would have the plans submitted no later than Monday as they were desperate to get them submitted.

I followed up with them just now as I have not received any resubmittals. Sometimes resubmittals get hung out in cyber space. They have contacted CTA to stamp the plans but CTA has reservations on stamping the plans as they are not the primary contract holder. Ryan has put a call into the State to see if there is a way to resolve this.

As of now we still do not have resubmittal to approve the prescreen.

Will let you when and if it changes.

Thanks


Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####
Intake Approval  7/16/2013 FAIL
DetailsAdele J Schaffeld-Griffin
email sent 7/16/13 7:46 am
Ryan, I have completed the prescreen. The 3 items below will still need to be addressed prior to the prescreen being approved.

1. Please provide the completed Form #304, Design professional. 7/9 comment
*The 304 form did not upload. Please re upload this form. 7/16 comment

2. All sheets submitted for review shall be stamped and signed by the design professional of record. The only sheets stamped and signed are the plumbing, mechanical and electrical sheets. 7/9 comment
*Sheets A4.1, A4.2, A4.3, A5.1, A5.2, A6.1, A6.2 currently still do not have a stamp by the licensed design professional. 7/16 comment

3. In the check list it is specified that the specification book for this project is separate. Please upload the specification books. 7/9 comment
*Comment addressed

4. The plans shall be stamped by a Idaho licensed Architect as noted in the check list that you submitted. You checked yes that the Architect was licensed in Idaho. I have verified with the State of Idaho that Lyle Beecher has not been licensed in Idaho since his license expired in April of 2008.
x Building Plans (2 complete paper sets). Plans drawn to scale on 18”x24” minimum size plan sheets.
Architectural stamped and signed by an Idaho licensed architect; Civil, structural, mechanical & plumbing
stamped and signed by Idaho licensed engineers. Note: Mechanical and plumbing may be designed by the
architect for minor work where approved in advance by the Chief Plumbing/Mechanical Inspector.
*Please upload all of the architectural sheets with a current Idaho Licensed Stamp and Signature.


If you have any questions or need any assistance please feel free to contact me.

Thank you

Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####
Telephone call  7/12/2013 DONE
DetailsAdele J Schaffeld-Griffin
called Ryan left voice mail. I went in and checked e plan and the form 304 was uploaded yesterday. It did not come through. I left a message with Rayan to send it to me and I would upload it for him if he is having trouble. I also let him know that we had still not recieved any revised plan sheets to address the pre screen commentsl 7/12/13 1:40 pm ajs
Telephone call  7/10/2013 DONE
DetailsAdele J Schaffeld-Griffin
Returned call to Ryan 7/10/13 questions on intake.
Intake Approval  7/9/2013 FAIL
DetailsAdele J Schaffeld-Griffin
email sent to Ryan 7/9/13
Ryan, I have completed the prescreen. The 3 items below will still need to be addressed prior to the prescreen being approved.

1. Please provide the completed Form #304, Design professional.

2. All sheets submitted for review shall be stamped and signed by the design professional of record. The only sheets stamped and signed are the plumbing, mechanical and electrical sheets.

3. In the check list it is specified that the specification book for this project is separate. Please upload the specification books.


I have attached change marks on the check list. This will allow you to see the exact location the requirement is specified from.

If you need any assistance please feel free to contact me.

Thank you

Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####

Plan Reviewer's activity  7/1/2013 DONE
DetailsAdele J Schaffeld-Griffin
EMAIL SENT TO RYAN 7/1/13

Ryan, I received you message and wanted to send you the forms/link hoping it may be easier for you. We need form 304 http://pds.cityofboise.org/home/documents/apps/300/# completed and uploaded.

We also need the 520 Major check list completed and uploaded. I have attached it to this email.

In your message you mentioned you had completed these forms so maybe someone in your office has them and they just need to be scanned in and uploaded.

If you are having trouble uploading the forms please email them to me and I will upload them for you.

I need these 2 items before I can start the prescreen.

Please let me know how we can be of any assistance.

Thank you

Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####

Telephone call  6/28/2013 DONE
DetailsAdele J Schaffeld-Griffin
Called Ryan and left voice mail checking in on status of uploading check list to begin pre screen.
Application received  6/21/2013 DONE
Application submitted via PDS Online on Jun 21 2013 10:47AM
Intake Approval  6/21/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Please upload the completed 520 Check list.
Please upload the completed 304 form.

I need this information to begin the pre screen.

Thank you