Third Notice | | 3/16/2019 | 4/8/2019 | | DONE |
|
|
|
mailed 4-11-19 with third final follow up
|
Third Follow up | | | 4/8/2019 | | DONE |
|
|
|
Emailed Josh, josh-durham@hoffmancorp.com, informing these final values will need to be sent in by 5pm on friday (4-12-19) or we will need to put a hold on the company
|
Meeting | | | 4/3/2019 | | DONE |
|
|
|
emailed Josh Durham (in documents) informing him final values are going out next week and we have been trying to get those for this project since October. Informed that if those are not sent in by 5pm on 4-12 we will have to put a hold on Hoffman and that would affect other projects they are out there.
|
Third Notice | | 3/12/2019 | 3/11/2019 | | DONE |
|
|
|
mailed 3-12 with second follow up
|
Second Follow up | | | 3/11/2019 | | DONE |
|
|
|
|
Third Notice | | 1/13/2019 | 3/7/2019 | | DONE |
|
|
|
email josh sheet and first follow up letter
|
First Follow up | | | 3/7/2019 | | DONE |
|
|
|
|
Meeting | | | 2/13/2019 | | DONE |
|
|
|
sent email to josh to touch bases on final values for this project josh-durham@hoffmancorp.com
|
Third Notice | | 12/18/2018 | 1/8/2019 | | DONE |
|
|
|
emailed Josh (josh-durham@hoffmancorp.com) since he sent in BLD14-03688
|
Third Notice | | 11/11/2018 | 12/13/2018 | | DONE |
|
|
|
mailed 12-14
|
Second Notice | | 10/21/2018 | 11/6/2018 | | DONE |
|
|
|
mailed 11-12
|
First Notice | | 9/14/2018 | 10/11/2018 | | DONE |
|
|
|
mailed 10-12-18
|
Permanent Occupancy | | | 9/4/2018 | | DONE |
|
|
|
|
Zoning Approval | 8/15/2018 | 8/15/2018 | 8/15/2018 | | DONE |
Andrea Tuning
|
|
|
|
Temporary Occupancy | 7/10/2018 | 10/8/2018 | 7/10/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd extension of Temp C of O good starting from 7/15/18
|
Telephone call | | | 7/6/2018 | | DONE |
|
|
|
emailed Victoria that the temp c of o was about to expire so she can email Jason B if they're not ready for a perm c of o yet
|
BLD-Aging Inspection | 6/6/2018 | 6/6/2018 | 6/11/2018 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 4/12/2018 | 7/11/2018 | 4/12/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason B ok'd extension for temp c of o starting 4-15-18
|
Telephone call | | | 4/11/2018 | | DONE |
|
|
|
Dan called back and is emailed Jason B for the exten request- called Adele to let know that i contacted them
|
BLD-Final | 3/28/2018 | 3/29/2018 | 3/29/2018 | A | PASS |
Dave Hannah
|
|
|
Victoria Phone #: ###-####
|
FIRE-Final Inspection | 3/28/2018 | 3/28/2018 | 3/28/2018 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection complete.
|
DOC - Permit Expired | 3/16/2018 | 3/16/2018 | 3/16/2018 | A | CANC |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/12/2018 | 3/12/2018 | 3/16/2018 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 1/17/2018 | 4/17/2018 | 1/17/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd the temp C of O extension good for 90 days starting from 1/15/18-called Mark
|
Telephone call | | | 1/17/2018 | | DONE |
|
|
|
Mark called-he asked me to email temp c of o to him
|
BLD-Final | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | NR |
Dave Hannah
|
|
|
Victoria Phone #: ###-####
|
Telephone call | | | 1/3/2018 | | DONE |
|
|
|
emailed Victoria that the temp will expire 1/15/18
|
BLD-Aging Inspection | 12/6/2017 | 12/6/2017 | 12/14/2017 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 10/17/2017 | 1/15/2018 | 10/17/2017 | | DONE |
Candy A. Nichols
|
|
|
Jason B ok'd ext for temp c of o starting from 10/17/17
|
Telephone call | | | 10/11/2017 | | DONE |
|
|
|
called Victoria to let know the temp c of o expires on 10-17-17-left a message on her phone
|
BLD-Aging Inspection | 9/25/2017 | 9/25/2017 | 10/3/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Other | 7/25/2017 | 7/25/2017 | 7/25/2017 | P | PART |
Dave Hannah
|
|
|
Victoria-wants temp final on level 5 exterior party deck Phone #: ###-#### ok for tco on all areas of the jump bld.
|
BLD-Final | 7/20/2017 | 7/21/2017 | 7/21/2017 | A | NR |
Jim Storey
|
|
|
Casey Phone #: ###-#### no ancer/ outstanding isues w down town with submitals and trades not signed off as well as fire permits.
|
Temporary Occupancy | 7/17/2017 | 10/15/2017 | 7/17/2017 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd temp c of o good thru 10/17/17
|
BLD-Aging Inspection | 5/29/2017 | 5/29/2017 | 5/30/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/27/2017 | 3/27/2017 | 3/28/2017 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 3/6/2017 | 6/4/2017 | 3/6/2017 | | DONE |
Candy A. Nichols
|
|
|
|
Temporary Occupancy | 3/6/2017 | 6/4/2017 | 3/6/2017 | | DONE |
Candy A. Nichols
|
|
|
|
Temporary Occupancy | 3/3/2017 | 6/1/2017 | 3/3/2017 | | DONE |
Candy A. Nichols
|
|
|
as per Jason Blais request for extension granted for 6 months from 3/14/17
|
BLD-Aging Inspection | 12/26/2016 | 12/26/2016 | 1/3/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 10/24/2016 | 10/24/2016 | 10/25/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/22/2016 | 8/22/2016 | 8/22/2016 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 8/19/2016 | 11/17/2016 | 8/19/2016 | | DONE |
Candy A. Nichols
|
|
|
as per Jason Blais extension for temp c of o granted for 6 months from 9/14/16
|
BLD-Aging Inspection | 6/20/2016 | 6/20/2016 | 6/20/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 4/20/2016 | 4/20/2016 | 4/21/2016 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 3/14/2016 | 6/12/2016 | 3/14/2016 | | DONE |
Candy A. Nichols
|
|
|
as per Jason B ok for 6 month temp c of o
|
Telephone call | | | 3/10/2016 | | DONE |
|
|
|
emailed Noelle that the temp c of o is expired and asked if she could either request an extension or if they're ready for the finals to please call them in
|
BLD-Aging Inspection | 2/8/2016 | 2/8/2016 | 2/10/2016 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 12/10/2015 | 3/9/2016 | 12/10/2015 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Aging Inspection | 12/7/2015 | 12/7/2015 | 12/7/2015 | | PASS |
Dave Hannah
|
|
|
|
Telephone call | | | 12/4/2015 | | DONE |
|
|
|
called Noelle to see if she asked for for the extension for the temp c of o-she gave me Victoria's number. I left a message on her phone to see is she sent in the extension request
|
Telephone call | | | 11/23/2015 | | DONE |
|
|
|
called Noelle to let know temp c of o is going to expire this week and they need to call in the final if ready or request an extension and gave JAson B's email address-left message on Noelle's phone
|
BLD-Conference | 10/5/2015 | 10/5/2015 | 10/5/2015 | P | PEND |
Dave Hannah
|
|
|
Ada compliance in level 1 - Victoria Phone #: ###-####
|
Temporary Occupancy | 8/28/2015 | 11/26/2015 | 8/28/2015 | | DONE |
Carlos Velazquez
|
|
|
|
BLD-Final | 8/28/2015 | 8/28/2015 | 8/28/2015 | P | PART |
Dave Hannah
|
|
|
okay for temporary occupancy- Staff ONLY, no general public
|
FIRE-Final Inspection | 8/28/2015 | 8/28/2015 | 8/28/2015 | P | PART |
Thomas Walsh
|
|
|
as per phone call with Scott Arellano; okay for temp CofO //CEV
|
BLD-Conference | 7/8/2015 | 7/9/2015 | 7/10/2015 | P | PASS |
Dave Hannah
|
|
|
Meeting at Hoffman offices to discuss accessible pathway. Meeting at 2:30. If you can't make this time please call the architect, Lori Selna, at ###-####.
|
BLD-Framing/Rough-in | 7/6/2015 | 7/7/2015 | 7/10/2015 | A | PASS |
Dave Hannah
|
|
|
Request framing inspection for parking garage entry. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Conference | 7/2/2015 | 7/6/2015 | 7/6/2015 | A | DONE |
Dave Hannah
|
|
|
Review guardrail conditions. Please contact CJ with Hoffman to walk these areas ###-####.
Thanks Phone #: ###-#### Inspection requested via web by Noelle Idehara
|
BLD-Conference | 7/1/2015 | 7/2/2015 | 7/2/2015 | A | CANC |
Dave Hannah
|
|
|
Review guardrail conditions. Please contact CJ with Hoffman to walk these areas ###-####.
Thanks Phone #: ###-#### Inspection requested via web by Noelle Idehara
|
BLD-Wall cover | 6/18/2015 | 6/18/2015 | 6/18/2015 | P | PASS |
Dave Hannah
|
|
|
Kitchen studio fireplace framing for cover contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Conference | 6/4/2015 | 6/4/2015 | 6/4/2015 | P | PASS |
Dave Hannah
|
|
|
6th floor grid ceiling cover inspection Kitchen area. contact Jeremy Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Ceiling Grid Inspection | 5/27/2015 | 5/28/2015 | 5/28/2015 | A | PASS |
Mike Jordan
|
|
|
Makers studio above ceiling office.... 1st ; 2nd floor Kitchen studio ceiling contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Ceiling Grid Inspection | 5/13/2015 | 5/13/2015 | 5/13/2015 | P | PASS |
Dave Hannah
|
|
|
Ceiling inspection for Grid ceilings 1st 2nd 4th 6th Floors of the JUMP building.... Contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 4/27/2015 | 4/28/2015 | 4/28/2015 | P | PASS |
Dave Hannah
|
|
|
Requesting inspection for framing at level 6 sofit near stair A-01, Please contact Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Wall cover | 4/23/2015 | 4/23/2015 | 4/23/2015 | A | PASS |
Dave Hannah
|
|
|
Requesting sheathing inspection for West Tractor Box. Please call Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 3/24/2015 | 3/24/2015 | 3/25/2015 | P | PASS |
Dave Hannah
|
|
|
Requesting sheathing inspection for East Tracker box interior. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Conference | 3/12/2015 | 3/13/2015 | 3/13/2015 | A | PEND |
Dave Hannah
|
|
|
Temp 2hr separation wall under ground garage from jump building.contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Ceiling Grid Inspection | 3/2/2015 | 3/4/2015 | 3/4/2015 | A | PASS |
Dave Hannah
|
|
|
Service core elevator lobbies 3rd 4th 5th 6th floors and Jump lobby ceilings all for cover for drywall over fat grid. contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Ceiling Grid Inspection | 2/27/2015 | 3/2/2015 | 3/2/2015 | A | CANC |
Dave Hannah
|
|
|
Service core elevator lobbies and Jump lobby ceiling inspections for cover drywall ceilings.. Neal Mays Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson Inspection cancelled from web by: Jeremy Richardson
|
BLD-Ceiling Grid Inspection | 2/13/2015 | 2/13/2015 | 2/14/2015 | P | PASS |
Dave Hannah
|
|
|
6th floor service core drywall ceiling cover inspection. Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 2/11/2015 | 2/11/2015 | 2/12/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 2/10/2015 | 2/11/2015 | 2/11/2015 | A | DEFR |
Dave Hannah
|
|
|
Requesting framing (z furring) inspection on level 6 outside of service core. Please contact Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Wall cover | 2/6/2015 | 2/9/2015 | 2/9/2015 | A | PASS |
Dave Hannah
|
|
|
Service core Elevator vestibules walls for cover interior and exterior walls 3rd, 4th, 5th and 6th floors Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 2/4/2015 | 2/4/2015 | 2/5/2015 | P | PASS |
Dave Hannah
|
|
|
Requesting sheathing inspection on level 4 near passenger elevator. Soffit framing inspection level 6 service core. Framing west tractor box bottom soffit. Please call Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 1/26/2015 | 1/26/2015 | 1/27/2015 | P | PASS |
Dave Hannah
|
|
|
Requesting framing inspection for west tractor box, level 4 passenger elevator at zee girts and sheathing for 3rd and 4th elevator fronts on passenger. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Ceiling Grid Inspection | 1/22/2015 | 1/23/2015 | 1/23/2015 | A | CANC |
Dave Hannah
|
|
|
1st floor ceiling cover inspection in the Decouctics ceiling area kitchen studio lobby...and fire wall talk on exterior wall 2 hour fire rated conditions service core area... UL425 contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 1/14/2015 | 1/15/2015 | 1/15/2015 | A | PASS |
Dave Hannah
|
|
|
requesting sheathing inspection for level 5 soffits by pioneer stair and level 4 soffit by passenger elevator Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Wall cover | 1/9/2015 | 1/12/2015 | 1/12/2015 | A | PASS |
Dave Hannah
|
|
|
6th floor restroom area walls for cover... and movement studio area drywall ceilings cover Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 1/9/2015 | 1/12/2015 | 1/12/2015 | A | PASS |
Dave Hannah
|
|
|
Requesting framing inspection on the 3 center tractor boxes. Please call Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 1/7/2015 | 1/7/2015 | 1/7/2015 | P | PASS |
Dave Hannah
|
|
|
Requesting sheathing inspection for level south side of kitchen studio soffits, level 3-4 passenger elevator soffits. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Wall cover | 12/19/2014 | 12/22/2014 | 12/22/2014 | A | PASS |
Dave Hannah
|
|
|
5th Floor service core Restroom for wall and ceiling cover. Contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 12/18/2014 | 12/19/2014 | 12/19/2014 | A | PASS |
Dave Hannah
|
|
|
Requesting framing inspection for stair 801. Please call Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 12/17/2014 | 12/18/2014 | 12/18/2014 | A | PASS |
Dave Hannah
|
|
|
Requesting framing inspection for 5th floor soffits. Please call Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 12/11/2014 | 12/15/2014 | 12/15/2014 | A | PASS |
Dave Hannah
|
|
|
Requesting zee furring inspection for south side of kitchen studio 1st floor soffit. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Wall cover | 12/11/2014 | 12/12/2014 | 12/12/2014 | A | PASS |
Dave Hannah
|
|
|
6th floor pioneer lobby radius wall ...Contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Wall cover | 12/2/2014 | 12/3/2014 | 12/4/2014 | A | PASS |
Dave Hannah
|
|
|
6th floor Kitchen, the wall furring at exterior wall line for cover. contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Wall cover | 11/12/2014 | 11/13/2014 | 11/13/2014 | A | PASS |
Dave Hannah
|
|
|
6th floor wall cover inspection. contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 11/10/2014 | 11/10/2014 | 11/10/2014 | P | PASS |
Jim Storey
|
|
|
Requesting sheathing inspection for Multi-Media and framing inspection for 1st and 2nd floor @ stair A0-3. Please call Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton ceillings ok to cover.
|
BLD-Framing/Rough-in | 11/5/2014 | 11/6/2014 | 11/6/2014 | A | PASS |
Dave Hannah
|
|
|
Requesting sheathing inspection for 4th and 5th level. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Wall cover | 10/28/2014 | 10/30/2014 | 10/30/2014 | A | PASS |
Dave Hannah
|
|
|
5th floor all areas wall cover only at this time. Neal Mays 941 1493 Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 10/28/2014 | 10/29/2014 | 10/29/2014 | A | PASS |
Dave Hannah
|
|
|
Requesting framing inspection for level 5 ceilings. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Conference | 10/21/2014 | 10/22/2014 | 10/22/2014 | A | PASS |
Dave Hannah
|
|
|
Requesting sheathing inspection for 1st, 2nd and 3rd floor soffits. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Wall cover | 10/17/2014 | 10/20/2014 | 10/20/2014 | A | PART |
Dave Hannah
|
|
|
Service core Restrooms 4th floor ceiling cover, 5th floor walls cover, and Multi purpose studio wall cover contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson sixth floor shaft 5th floor rest rooms ok to cover
|
BLD-Framing/Rough-in | 10/15/2014 | 10/16/2014 | 10/16/2014 | P | PASS |
Dave Hannah
|
|
|
Requesting framing inspection on ceilings on 5th floor, 3rd and 4th by passenger elevator. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 10/14/2014 | 10/15/2014 | 10/15/2014 | A | PASS |
Dave Hannah
|
|
|
Request re-inspection for 3rd and 4th floor ceilings. Please contact Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 10/9/2014 | 10/10/2014 | 10/10/2014 | A | PASS |
Dave Hannah
|
|
|
Requsting soffit framing inspection @ stair A0-3b and A0-4b 3rd and 4th floor beyween grid line 9.1 ; 9.2a. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Wall cover | 9/30/2014 | 10/1/2014 | 10/1/2014 | A | PASS |
Dave Hannah
|
|
|
Makers Studio chase cover this includes shaft ceiling 4th floor IDF room that is the bottom of chase....Multi Media Hard lid @ entry to cover Contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 9/29/2014 | 9/30/2014 | 9/30/2014 | A | PASS |
Dave Hannah
|
|
|
Requesting framing inspection for 4th floor soffits excluding grid line 9.1a to 9.2. Framing inspection Level 5 and 6 passenger elevator grid line 9.4a. Framing and sheathing inspection Level 7 between 9.5 and 9.5a. Sheathing inspection on Level 3/4 at storage/dust containment parking level. Sheathing inspection at underside of Inspiration and movement studio. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 9/26/2014 | 9/26/2014 | 9/26/2014 | P | PASS |
Dave Hannah
|
|
|
Requesting exterior sofit inspection for 3rd floor grid line 9.2 to 9.3 a. please contact Rudy Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Wall cover | 9/22/2014 | 9/22/2014 | 9/22/2014 | A | PASS |
Dave Hannah
|
|
|
Makers Studio and Movement studio wall cover re-inspection Contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Wall cover | 9/19/2014 | 9/19/2014 | 9/22/2014 | P | DEFR |
Dave Hannah
|
|
|
Makers Studio and Movement studio wall cover re-inspection Contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 9/18/2014 | 9/19/2014 | 9/19/2014 | A | PASS |
Dave Hannah
|
|
|
Requesting framing inspection for soffits under movement and inspiration studios, and wall framing at column line 9.4 at the kitchen studio Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 9/15/2014 | 9/16/2014 | 9/16/2014 | A | NR |
Dave Hannah
|
|
|
Requesting framing inspection for 1st floor ceiling from 9.3a to 9.4a and 3rd floor 9.3a to 9.6a. Please contact Rudy. Phone #: ###-#### Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Wall cover | 9/15/2014 | 9/16/2014 | 9/16/2014 | A | NR |
Dave Hannah
|
|
|
Makers studio and Movement studio wall cover inspection contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 9/12/2014 | 9/15/2014 | 9/15/2014 | A | CANC |
Dave Hannah
|
|
|
Requesting framing inspection for 1st floor ceiling from 9.3a to 9.4a and 3rd floor 9.3a to 9.6a. Please contact Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton Inspection cancelled from web by: Tim Pendleton
|
BLD-Wall cover | 9/10/2014 | 9/11/2014 | 9/11/2014 | A | PASS |
Dave Hannah
|
|
|
2nd floor Kitchen studio drywall ceiling cover...Jeremy Richardson ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 9/3/2014 | 9/4/2014 | 9/4/2014 | P | PASS |
Dave Hannah
|
|
|
Request framing inspection for exterior Ceilings at 2nd floor and 1st floor lobby including sheathing. Please contact Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Wall Bracing | 8/29/2014 | 9/2/2014 | 9/2/2014 | A | PART |
Dave Hannah
|
|
|
4th floor service core restroom area contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson ok to cover
|
BLD-Wall cover | 8/28/2014 | 8/29/2014 | 8/29/2014 | A | DEFR |
Jim Storey
|
|
|
4th floor service core restroom area contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson out of time defr. to am tue
|
BLD-Conference | 8/21/2014 | 8/22/2014 | 8/22/2014 | A | PASS |
Dave Hannah
|
|
|
Kitchen Studio High drywall ceiling 2nd floor over stairs . Inspiration studio walls and ceiling, Service core 4th floor restroom walls. Contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 8/18/2014 | 8/19/2014 | 8/19/2014 | A | PASS |
Dave Hannah
|
|
|
Requesting Framing inspection for 4th floor Dust Containment. Please call Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 8/15/2014 | 8/18/2014 | 8/19/2014 | P | PASS |
Dave Hannah
|
|
|
Requesting sheathing inspection for service core levels 5-7. Please contact Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Wall cover | 8/11/2014 | 8/12/2014 | 8/12/2014 | A | PASS |
Dave Hannah
|
|
|
Service core 3rd floor Maintenance/Electrical room Neal Mays ###-#### Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 8/11/2014 | 8/12/2014 | 8/12/2014 | A | PASS |
Dave Hannah
|
|
|
Requesting inspections for framing on South side of service core and sheathing on passenger elevator. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Conference | 8/6/2014 | 8/7/2014 | 8/8/2014 | P | PASS |
Dave Hannah
|
|
|
Request framing inspection for West Side Passenger Elevator. Please call Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Ceiling Grid Inspection | 8/7/2014 | 8/7/2014 | 8/7/2014 | P | PASS |
Dave Hannah
|
|
|
Kitchen Studio 1st floor drywall ceiling cover inspection Contact Neal Mays ###-#### Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson
|
BLD-Conference | 7/28/2014 | 7/28/2014 | 7/29/2014 | P | PART |
Dave Hannah
|
|
|
Requesting framing inspection for elevator service core 5th and 6th floor, East side passenger elevator floors 3-7, and skylight at JUMP room. Please call Rudy Phone #: ###-#### >> Inspection requested via web by Tim Pendleton ok to cover ext
|
BLD-Wall cover | 7/28/2014 | 7/28/2014 | 7/29/2014 | P | PASS |
Dave Hannah
|
|
|
Interior precover inspection for Levels 1 and 2 of the service core. This is a follow up inspection due to areas that required fireproof patching. Phone #: ###-#### >> Inspection requested via web by Noelle Idehara
|
Additional plans submitted | | | 7/29/2014 | | DONE |
Tisha Gallop
|
|
|
deferred submittal for Lobby Stair; taken to John Menard
|
BLD-Wall cover | 7/21/2014 | 7/22/2014 | 7/22/2014 | A | PASS |
Jim Storey
|
|
|
shaft wall cover service core elevator Phone #: ###-#### Inspection requested via web by Jeremy Richardson core board ok on service elavator ok to cover.
|
BLD-Wall cover | 7/17/2014 | 7/17/2014 | 7/17/2014 | P | FAIL |
Jim Storey
|
|
|
Wall cover and looking at the fireproofing in service core mechanical room on column. contact Neal Mays ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson fire prooffing not in place .
|
BLD-Framing/Rough-in | 7/11/2014 | 7/11/2014 | 7/14/2014 | P | PART |
Dave Hannah
|
|
|
Requesting framing inspection for elevator service floor 5-7. Except the South side. Please contact Rudy Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 7/10/2014 | 7/11/2014 | 7/11/2014 | A | PART |
Dave Hannah
|
|
|
Requesting sheathing inspection for West side of elevator service floor 5-7. Please contact Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton ext framing and sheetig ok
|
BLD-Conference | 7/10/2014 | 7/11/2014 | 7/11/2014 | A | PART |
Dave Hannah
|
|
|
Requesting framing inspection at North side passenger elevator from 3-7 floor. Please contact Rudy Phone #: ###-#### >> Inspection requested via web by Tim Pendleton ext sheeting ok and framing ok
|
BLD-Wall cover | 7/9/2014 | 7/11/2014 | 7/11/2014 | A | PASS |
Dave Hannah
|
|
|
Wall cover inspection for 2nd floor Kitchen studio and service core trash and mechanical rooms contact Neal Mays ###-#### Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 7/9/2014 | 7/9/2014 | 7/10/2014 | P | FAIL |
Dave Hannah
|
|
|
Requesting framing inspection at North side passenger elevator from 3-7 floor. Please contact Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton needs to refire proof be
|
BLD-Wall cover | 7/2/2014 | 7/3/2014 | 7/3/2014 | A | PART |
Dave Hannah
|
|
|
Service core 1st level trash room and mechanical room. Kitchen studio 2nd floor. Neal Mays is the contact ###-#### Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson ok to one side 2nd floor needs fire protect floor pens patch fire proofing on colunms ok to cover trase and elec room all but for column that fire proofing was removed to add stiffiner plates
|
BLD-Framing/Rough-in | 6/24/2014 | 6/24/2014 | 6/24/2014 | A | PASS |
Dave Hannah
|
|
|
Request sheathing inspection at first floor vestibule at Kitchen Studio. Please call Rudy. Phone #: ###-#### Inspection requested via web by Tim Pendleton
|
BLD-Wall cover | 6/17/2014 | 6/23/2014 | 6/24/2014 | A | PART |
Dave Hannah
|
|
|
East Half Kitchen Studio 1st floor, Multi-Media Studio, Inspiration Studio, Makers Studio, Service Core 1st level Trash and Mechanical rooms and 3rd floor Maintenance and electrical rooms Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 6/23/2014 | 6/23/2014 | 6/24/2014 | P | CANC |
Dave Hannah
|
|
|
Request sheathing inspection at first floor vestibule at Kitchen Studio. Please call Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Wall cover | 6/12/2014 | 6/13/2014 | 6/13/2014 | A | PASS |
Dave Hannah
|
|
|
West half bathroom side area A kitchen studio 1st floor. Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 6/11/2014 | 6/12/2014 | 6/12/2014 | A | PASS |
Dave Hannah
|
|
|
Request Framing inspection for 1st floor lobby at kitchen studio. Please call Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 6/10/2014 | 6/11/2014 | 6/12/2014 | P | PASS |
Dave Hannah
|
|
|
Request Framing inspection for Multii- Purpose 5th floor. Call Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Conference | 6/10/2014 | 6/10/2014 | 6/10/2014 | P | PASS |
Dave Hannah
|
|
|
Request sheathing inspection for Multi-Purpose Studio 5th Floor. Please contact Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Conference | 6/4/2014 | 6/5/2014 | 6/5/2014 | A | PASS |
Dave Hannah
|
|
|
Request framing inspection for Multi-Purpose 5th floor. Also sheathing inspection for Movement 5th floor. Please contact Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Wall cover | 6/3/2014 | 6/4/2014 | 6/4/2014 | A | PART |
Dave Hannah
|
|
|
Area A Kitchen Studio 1st and 2nd floor wall cover inspections restroom area only. Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson ok to cover 1st floor only 2nd floor sill needs pent fire stopped
|
BLD-Framing/Rough-in | 5/30/2014 | 6/2/2014 | 6/2/2014 | A | PASS |
Dave Hannah
|
|
|
Requesting exterior framing inspection for Movement Studio and exterior framing/sheathing for skylights @Maker''s Studio 5th floor. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Conference | 5/30/2014 | 6/2/2014 | 5/30/2014 | A | CANC |
Dave Hannah
|
|
|
Request framing inspection on Movement and Multimedia Studio 5th Floor. Please contact Rudy ###-#### Phone #: ###-#### >> Inspection requested via web by Tim Pendleton Inspection cancelled from web by: Tim Pendleton
|
BLD-Framing/Rough-in | 5/30/2014 | 6/2/2014 | 5/30/2014 | A | CANC |
Dave Hannah
|
|
|
Request framing inspection on Movement Studio 5th Floor. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton Inspection cancelled from web by: Tim Pendleton
|
BLD-Framing/Rough-in | 5/16/2014 | 5/19/2014 | 5/19/2014 | A | PASS |
Dave Hannah
|
|
|
Requesting framing and sheathing inspection for storage 03-C11 between 9.8 grid line & 9.7A grid line parking Level 3 Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 5/16/2014 | 5/16/2014 | 5/16/2014 | P | CANC |
Dave Hannah
|
|
|
Interior wall framing inspection Kitchen, Multi media, Makers and Inspiration Studio''s This is a interior wall framing package inspection for Interior Systems so we can hang top out drywall. contact Jeremy Richardson @ ###-#### or Neil Mays ###-#### Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson
|
BLD-Framing/Rough-in | 5/15/2014 | 5/15/2014 | 5/15/2014 | P | FAIL |
Jim Sly
|
|
|
Requesting framing inspection for storage 03-C11 between 9.8 grid line & 9.7A grid line parking Level 3. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton Missing two bolts in top track. Rudy will complete and call for Insp. (Storage rooms).
|
BLD-Framing/Rough-in | 5/8/2014 | 5/8/2014 | 5/9/2014 | P | PASS |
Dave Hannah
|
|
|
Requesting framing and sheathing inspection for skylights at kitchen and makers studio. Please call Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 4/29/2014 | 4/30/2014 | 5/2/2014 | P | PASS |
Dave Hannah
|
|
|
Requesting sheathing inspection for Makers studio. Please call Rudy ###-#### Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 4/30/2014 | 5/1/2014 | 5/1/2014 | A | NR |
Mike Jordan
|
|
|
This is a interior wall inspection and walk threw so we can start wall top out in area A kitchen studio 1st and 2nd floor The inspection is for ISI Interior Systems Inc. INTERIOR framing contractor on the JUMP project. Please Contact Neil Mays ###-#### for the inspection Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson. Noted that trades are not inspected or completed in these areas. ISI wants to rock from deck down 4ft. 8inch. Suggested to Hoffman to set up a meeting between subs and inspectirs to come up with a phasing plan moving forward.
|
BLD-Framing/Rough-in | 4/29/2014 | 4/30/2014 | 4/30/2014 | A | PASS |
Dave Hannah
|
|
|
Requesting sheathing inspection for west side service elevator. Please call Rudy ###-####. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 4/23/2014 | 4/24/2014 | 4/29/2014 | P | PASS |
Dave Hannah
|
|
|
Requesting sheathing inspection Multi-media. Please call Rudy. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 4/28/2014 | 4/29/2014 | 4/29/2014 | A | PASS |
Dave Hannah
|
|
|
Requesting Framing Inspection @ Makers studio and Elevator Service Core South and West Walls. Sheathing inspection for Grid line "G" on the 4th floor. Please call Rudy ###-#### Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 4/22/2014 | 4/23/2014 | 4/24/2014 | A | PASS |
Dave Hannah
|
|
|
Requesting inspection for the following items. Please call Rudy with Northwest Interiors to coordinate inspection ###-####. 1. Exterior Sheathing Inspection - Inspiration Studio. 2. Exterior Framing Inspection - at grid G around the helix on Level 4 (east and west sides). 3. Sheathing Inspection at South side of Service Core Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 4/21/2014 | 4/22/2014 | 4/23/2014 | A | PASS |
Dave Hannah
|
|
|
Requesting exterior framing inspection for Filming Studio. Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 4/7/2014 | 4/7/2014 | 4/7/2014 | P | PASS |
Dave Hannah
|
|
|
requesting exterior framing inspection at the elevator service core. Grid lines 9.1a-9.2a. 3rd and 4th floors Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 4/2/2014 | 4/3/2014 | 4/7/2014 | A | PASS |
Dave Hannah
|
|
|
requesting exterior framing inspection at the elevator service core. Grid lines 9.1a-9.2a. 3rd and 4th floors Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Framing/Rough-in | 4/1/2014 | 4/1/2014 | 4/1/2014 | P | PASS |
Dave Hannah
|
|
|
requesting exterior sheathing inspection at the kitchen. Grid lines 9.4a-9.5 Phone #: ###-#### >> Inspection requested via web by Tim Pendleton
|
BLD-Wall cover | 3/26/2014 | 3/27/2014 | 3/27/2014 | A | CANC |
Dave Hannah
|
|
|
area A of the jump building interior framing first and second floor restroom / kitchen prep areas Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson
|
Issue PAID IN FULL permit | | | 2/10/2014 | | DONE |
Christina Prado
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2013 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 12/20/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 12/20/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/22/2013 | | 12/20/2013 | | PASS |
John Menard
|
|
|
|
Plan assigned to (JCM) | 6/24/2013 | | 12/20/2013 | | PASS |
John Menard
|
|
|
1st Review Complete - JUMP - MAJOR TI
|
Plan resubmittals received | | | 12/13/2013 | | DONE |
Tisha Gallop
|
|
|
received two copies of response, specs addendum, and plan sheets A0-00-B, A0-00-B2, A-0-00-Q, A-0-01-S, A0-05-0, A1-01-1, A2-00-0, A2-05-0, A3-01-A, A3-05-A, A4-01-0, A4-01-A, A8-10-52, AD-26-1, AD-28-1, AD-32-1, AD-33-1, AD-34-1, E0-07, E0-08, E2-01-A; inserted by owner rep. and taken back to John Menard.
|
1st review completed | | | 10/22/2013 | | FAIL |
|
|
|
Failed plumbing, plan check and mechanical.
|
Routing - FIRE | 10/18/2013 | | 10/22/2013 | | PASS |
Scott Arellano
|
|
|
Attached IFC report to plans.
|
Routing - PLAN CHECK | 7/2/2013 | | 10/18/2013 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals requested | | | 10/18/2013 | | |
John Menard
|
|
|
E-mailed the applicant a copy of the plan review requesting revisions. JCM
|
Plan resubmittals requested | | | 10/18/2013 | | DONE |
John Menard
|
|
|
E-mailed the applicant a copy of the plan review requesting revisions. JCM
|
Routing - PLUMBING | 10/11/2013 | | 10/14/2013 | | PASS |
Daryl Spivey
|
|
|
Install per plan and ISPC.
|
Routing - MECHANICAL | 10/8/2013 | | 10/11/2013 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 10/1/2013 | | DONE |
Tisha Gallop
|
|
|
received two copies of response to plumbing comments, resonse to mechanical comments, and plan sheets P4-01, M2-01-A, M2-02-A, M2-05-A, M2-06-A, M2-07-A; inserted by Noelle and routed to Plumbing and Mechanical.
|
Routing - PLUMBING | 9/20/2013 | | 9/24/2013 | | FAIL |
Bill VanDegrift
|
|
|
Resubmittals
Missing plan page P4.01
|
Routing - MECHANICAL | 7/11/2013 | | 8/1/2013 | | FAIL |
Troy James
|
|
|
emailed corrections to applicant
|
Plan resubmittals received | | | 7/12/2013 | | DONE |
Christina Prado
|
|
|
Received 1 response letter and two sets of revised plans marked 90-01, P0-03, P2-01-0, P2-01-A, P2-01-B, P2-01-C, P2-01-D, P2-01-F, P2-01-G, P2-01-H, P2-02-0, P2-020-A, P2-02-B, P2-02-C, P2-03-0, P2-03-A, P2-03-B, P2-03-C, P2-04-0, P2-04-A, P2-04-B, P2-04-C, P2-05-0, P2-05-A, P2-05-B, P2-05-C, P2-06-0, P2-06-A, P3-01-0, P3-03-0, P4-02, P4-11, P4-12, P4-13, P4-21, P4-22, P4-31, P5-01, P5-02; inserted by arch rep and taken to John
|
Routing - Design Review | 7/1/2013 | | 7/2/2013 | | PASS |
Sarah Schafer
|
|
|
Sarah Schafer - DRH10-00178 Approved per DRH10-00178.
|
Routing - PLUMBING | 6/28/2013 | | 7/1/2013 | | FAIL |
Bill VanDegrift
|
|
|
1. all covered area drains and storm drains to drain to sanitary thru flammable interceptor.
2. The Wilkins dual check 700xl backflow is not an approved backflow valve. Must be a testable device. P3-01-0, P3-03-0, P4-11, and P4-12.
3. The 4 inch oil-flammable interceptor vent shall vent out by itself. P4-02.
4. Basement plans do not match up with plumbing on 1st floor.
5. 3 inch waste on P4-01 is suppose to connect on P4-02. No note or connection was found.
6. These are the same plans I failed on the 1st shell and core review with out the changes requested.
|
Routing PW Sewer Rating | 6/26/2013 | | 6/27/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 6/27/2013 | | 6/27/2013 | | PASS |
Walt Baumgartner
|
|
|
All food service and kitchen related wastewater shall route to suitable and adequate grease abatement
|
Routing - PUBLIC WORKS | 6/26/2013 | | 6/27/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 6/24/2013 | | 6/25/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Pending Assignment by JCB | 6/21/2013 | | 6/24/2013 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 6/21/2013 | | PASS |
John Menard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/21/2013 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/21/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 6/21/2013 | | | |
|
|
|
|