BLD-Final | 1/14/2014 | 1/15/2014 | 1/15/2014 | A | PASS |
Dave Hannah
|
|
|
Access key is in back doors exterior power outlet weather proof box. Phone #: ###-#### >> Inspection requested via web by Lucas Christian
|
DOC - Permit Finaled | 1/15/2014 | 1/15/2014 | 1/15/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 10/31/2013 | 11/1/2013 | 11/1/2013 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lucas Christian
|
BLD-Framing/Rough-in | 10/31/2013 | 10/31/2013 | 10/31/2013 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lucas Christian ok to cover ext and insulate int
|
BLD-Framing/Rough-in | 10/29/2013 | 10/29/2013 | 10/30/2013 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lucas Christian c/n on site ok to insulate
|
BLD-Wall Bracing | 10/22/2013 | 10/23/2013 | 10/24/2013 | P | FAIL |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lucas Christian
|
BLD-Wall Bracing | 10/17/2013 | 10/18/2013 | 10/18/2013 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lucas Christian #3 front of house need 3 king studs and hds installed with nailling reinspected/ the rest of the house is ok to cover.
|
BLD-Foundation | 9/25/2013 | 9/26/2013 | 9/26/2013 | A | PASS |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 9/25/2013 | 9/26/2013 | 9/26/2013 | A | PASS |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Foundation | 9/24/2013 | 9/25/2013 | 9/25/2013 | A | NR |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. Still needs to provide the bmp's as previuosly noted.
|
BLD-Footing | 9/24/2013 | 9/24/2013 | 9/24/2013 | P | PEND |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Herom Stop work on erosion control insp.
|
Issue PAID IN FULL permit | | | 9/23/2013 | | DONE |
|
|
|
|
OVERRIDE | | | 9/20/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 9/20/2013 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 6/24/2013 | 6/24/2013 | 9/19/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 7/5
|
Routing - PLAN CHECK | 9/19/2013 | | 9/19/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 9/19/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/19/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 9/11/2013 | | 9/18/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
waiting on response from Fire on WUI zone. 9/16/13
email sent to Steve see documents. 9/17/17
Steve,
I have attached the building plan review comments for 510 Coston. I am waiting for comments back from the Fire Marshall in regards to the specific WUI zone this structure is in. Once I receive verification of the zone I will let you know if there will be any additional comments to meet WUI code requirements.
If you have any questions please feel free to contact me.
Please submit 2 set of all revised documents.
Thank you
Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####
|
Plan resubmittals received | | | 9/18/2013 | | |
|
|
|
9-18-13 Received 1 review report, 1 design criteria, 1 calc & 2 copies of sheets 1,2,3,4,5,6,7,8, & roof plan sent to Adele
|
Routing - PLANNING | 9/16/2013 | | 9/16/2013 | | PASS |
Andrea Tuning
|
|
|
|
Routing - MECHANICAL | 9/6/2013 | | 9/11/2013 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 9/6/2013 | | DONE |
Christina Prado
|
|
|
Received two full new sets of revised plan sheets marked 1, 2,3,4,5,6,7 for home & 1,2,3,4 for detached garage, as well as once copy new Manual J, Application & site plan; Re-routed to planning, mechanical & plan review
|
Routing - PLANNING | 9/6/2013 | | 9/6/2013 | | FAIL |
Andrea Tuning
|
|
|
The Design Review approavl is DRH13-00233. The applicant did not revise the site plan to include sidewalks on Hillview and Coston. The applicant has not updated the elevations to include a sidelite at teh main entrance on Coston and a landscape plan was not included with the building plans. A message was left for Steve Hanson.
|
1st review completed | | | 7/1/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 6/28/2013 | | 7/1/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
needs DR emailed Steve will review when DR approved
email sent 7/1/13 to steve
Steve,
I have received the plans for 510 N. Coston Street. I will not review the plans until the DR is approved. I will begin the review when it is approved and just waiting for the 10 day appeal if you let me know as soon as the design is accepted. Also in going through the plans there are notes for the engineering on the lateral and it states TBD. I will need the lateral calculations for my review.
Please let me know if you have any questions.
Thank you
Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####
|
Routing - MECHANICAL | 6/25/2013 | | 6/28/2013 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 6/24/2013 | 6/27/2013 | 6/25/2013 | | PASS |
Cindy M. Gould
|
|
|
Demo permit will be issued prior to the building permit being issued.
|
Routing - Addressing | 6/24/2013 | | 6/25/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | | | 6/25/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 6/25/2013 | | 6/25/2013 | | FAIL |
Josh Wilson
|
|
|
Needs DR approval for single family house on a substandard lot.
|
Intake Approval | | | 6/21/2013 | | PASS |
|
|
|
|
Application received | | 6/21/2013 | | | |
|
|
|
|