BLD-Final | 2/26/2014 | 2/26/2014 | 2/26/2014 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
DOC - Permit Finaled | 2/26/2014 | 2/26/2014 | 2/26/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 2/25/2014 | 2/25/2014 | 2/26/2014 | P | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-#### needs to close risers to less than 4"
|
PubWorks Occupancy Approval | 2/26/2014 | 2/26/2014 | 2/26/2014 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 12/17/2013 | 12/18/2013 | 12/19/2013 | A | PASS |
Dave Hannah
|
|
|
call when on way // Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 12/17/2013 | 12/18/2013 | 12/19/2013 | A | PASS |
Dave Hannah
|
|
|
call when on way // Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 12/13/2013 | 12/13/2013 | 12/13/2013 | P | FAIL |
Jim Storey
|
|
|
jason PLEASE call before going out later if possible Phone #: ###-#### c/n posted
|
Plan Modification Accepted | | | 12/5/2013 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 12/5/2013 | | 12/5/2013 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Other | 12/2/2013 | 12/3/2013 | 12/4/2013 | A | PASS |
Dave Hannah
|
|
|
Call ahead please - Fire rated soffits - Jason Phone #: ###-#### pass crew has most of the 5/8 sheetrock on soffits
|
FIRE-Final Inspection | 12/2/2013 | 12/3/2013 | 12/3/2013 | A | DEFR |
Forrest France
|
|
|
Diane Phone #: ###-#### * Incorrect permit number request- There are no FIR inspections related to this project. Phoned listed contact to inform
|
BLD-Wall Bracing | 11/21/2013 | 11/22/2013 | 11/22/2013 | A | PASS |
Dave Hannah
|
|
|
Please call ahead for access - Conf also -Jason Phone #: ###-####
|
BLD-Concrete | 9/20/2013 | 9/20/2013 | 9/23/2013 | P | PASS |
Dave Hannah
|
|
|
Garage concrete wall - Kevin Phone #: ###-####
|
BLD-Footing | 9/18/2013 | 9/19/2013 | 9/19/2013 | A | PASS |
Dave Hannah
|
|
|
kevin around noon it possible Phone #: ###-####
|
BLD-Foundation | 9/11/2013 | 9/11/2013 | 9/11/2013 | P | PASS |
Jim Sly
|
|
|
Basement and 2 foot walls OK to pour.
|
BLD-Wall cover | 9/9/2013 | 9/10/2013 | 9/11/2013 | P | PART |
Dave Hannah
|
|
|
KEVIN Phone #: ###-#### rebar for basement walls ok
|
BLD-Footing | 9/4/2013 | 9/5/2013 | 9/5/2013 | A | PART |
Dave Hannah
|
|
|
Kevin Phone #: ###-#### basement ftgs ok
|
PubWorks Subgrade Approval | 8/19/2013 | 8/19/2013 | 8/19/2013 | | DONE |
Jason C. Taylor
|
|
|
Recieved subgrade approval from geotechnical engineer. Footing inspections may be scheduled with building department. Jason Taylor ###-####
|
OVERRIDE | | | 8/9/2013 | | |
|
|
|
|
Plan assigned to (AJS) | 6/21/2013 | 6/21/2013 | 8/9/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 7/4
|
Issue PAID IN FULL permit | | | 8/9/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 8/8/2013 | | 8/9/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
spoke with Leon on revisions made to driveway for fire access. The access width went from 15 feet to 25 feet. Planning limits the access point to 33 feet. Since the new dimention will not effect his approal I will not re route to him. 8/9/13 ajs
|
Case Summary (BLD) | | | 8/9/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/9/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 8/9/2013 | | DONE |
Christina Prado
|
|
|
left message for Steve advising permit is ready and gave fees due
|
Permit Ready to Issue | | | 8/9/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 8/6/2013 | | 8/8/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Note: full size plans not routed to ESC. See approved 11x17.
|
Routing - FIRE | 8/8/2013 | | 8/8/2013 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments witnin case. No comments attached to plans.
|
Routing PW Grading-Hillside | 8/2/2013 | | 8/2/2013 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan resubmittals received | | | 7/30/2013 | | DONE |
|
|
|
|
Routing - FIRE | 7/1/2013 | 7/1/2013 | 7/1/2013 | | FAIL |
Tim Frost
|
|
|
Emailed review to RP
|
1st review completed | | | 7/1/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Erosion and Sediment | 7/1/2013 | | 7/1/2013 | | FAIL |
Kimberly M. Johnson
|
|
|
Kim, contacted applicant and left voice mail requesting ESC plans. I will route to her when they are recieved.
|
Routing - PLAN CHECK | 6/28/2013 | | 7/1/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Adele. Emailed comments to Steve see documents for letter
|
Routing - MECHANICAL | | | 6/28/2013 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/27/2013 | | 6/27/2013 | | PASS |
Leon Letson
|
|
|
|
Routing - PUBLIC WORKS | | | 6/27/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | 6/26/2013 | | 6/26/2013 | | FAIL |
Jason C. Taylor
|
|
|
Project is in the hillside and will need a geotechnical report and site grading and drainage plan submitted prior to Public Works approval. Jason Taylor ###-####.
|
Route to Impact Fee Review | 6/21/2013 | 6/26/2013 | 6/24/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Addressing | 6/21/2013 | | 6/24/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Application received | | 6/21/2013 | 6/21/2013 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/21/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/21/2013 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 6/21/2013 | | PASS |
Barbara Stitt
|
|
|
|