BLD-Final | 4/1/2015 | 4/1/2015 | 4/1/2015 | P | PASS |
Jim Storey
|
|
|
Request to final per 410- ###-#### All corrections made ok and finaled under FIR14-00142.
|
FIRE-Final Inspection | 4/1/2015 | 4/1/2015 | 4/1/2015 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 12/9/2014 | 12/9/2014 | 12/9/2014 | P | NR |
Jim Storey
|
|
|
Chad Phone #: ###-####
|
BLD-Final | 10/1/2014 | 10/1/2014 | 10/1/2014 | P | DONE |
Jim Storey
|
|
|
All corrections made ok and finaled under FIR14-00142.
|
FIRE-Final Inspection | 5/2/2014 | 5/7/2014 | 5/7/2014 | A | FAIL |
Forrest France
|
|
|
C/N items include; remove keyed locking deadbolts above panic hardware at two locations including the north office area and south breakroom exit doors, post "door to remain...." signage at the main entry/exit, missing fire sprinkler coverage at the fire riser room, need to complete acceptance testing for the building related fire alarm permit work, post signage at the paint booth per fire code review notes.
|
BLD-Final | 5/2/2014 | 5/7/2014 | 5/7/2014 | A | FAIL |
Jim Storey
|
|
|
Chad- Phone #: ###-#### need planreview to resolve missing 1 hr fire wall on plan not in the feild.
|
FIRE-Conference | 5/6/2014 | 5/6/2014 | 5/6/2014 | P | DONE |
Forrest France
|
|
|
Regarding project related fire alarm work.
|
BLD-Conference | 4/16/2014 | 4/16/2014 | 4/16/2014 | A | PART |
Jim Storey
|
|
|
Chcek status? pending fire alarm phone line
|
Issue PAID IN FULL permit | | | 2/7/2014 | | DONE |
Barbara Stitt
|
|
|
|
Routing - FIRE | 1/29/2014 | 1/29/2014 | 1/29/2014 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 1/29/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 1/29/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 1/29/2014 | | 1/29/2014 | | PASS |
Tim L. Woodard
|
|
|
Approved with Fire Approval. TLW
|
Permit Ready to Issue | | | 1/29/2014 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 1/29/2014 | | DONE |
Barbara Stitt
|
|
|
Called and left message for Cheryl that permit is ready, fees due, and need GC information on 1-29-14 @ 3:50pm
|
Plan resubmittals received | | | 1/29/2014 | | DONE |
|
|
|
Received HMIS from BME.
|
Plan assigned to (TLW) | 6/26/2013 | | 1/29/2014 | | PASS |
Tim L. Woodard
|
|
|
1st Review Complete.
|
Routing Off Site - STRUCTURAL | 8/2/2013 | | 11/26/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved by Outsource. TLW
|
Routing - PLAN CHECK | 8/7/2013 | | 11/26/2013 | | PEND |
Tim L. Woodard
|
|
|
Waiting for Resubs. TLW
|
Telephone call | | | 9/25/2013 | | DONE |
Scott Arellano
|
|
|
Spoke with Captain Ray Criner with the Boise Fire Department. Captain Criner is going to follow up with the tenant on the request for a Hazardous Materials Inventory Statement (HMIS) necessary to determine final paint room and storage room design criteria.
|
Routing - FIRE | 8/6/2013 | 8/6/2013 | 8/7/2013 | | FAIL |
Scott Arellano
|
|
|
Faxed and Emailed resubmittal items to the applicant and architect.
|
Plan resubmittals received | | | 8/2/2013 | | DONE |
Tisha Gallop
|
|
|
received three copies of structural response, structural calculations and plan sheets a0.01, s-1.0, s-1.1, s-1.2, s-2.0, s-3.0; inserted by arch. rep. and taken back to Tim Woodard. Thirs set routed to outside engineering.
|
Telephone call | | | 8/2/2013 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up.
|
1st review completed | | | 7/15/2013 | | FAIL |
|
|
|
Failed Structural and Fire
|
Routing - PLAN CHECK | 7/15/2013 | | 7/15/2013 | | PEND |
Tim L. Woodard
|
|
|
Waiting for Resubs. TLW
|
Routing - FIRE | 7/11/2013 | | 7/15/2013 | | FAIL |
Scott Arellano
|
|
|
Emailed architect resubmittal items with plan review report. Attached plan review report to case.
|
Route to Impact Fee Review | 6/26/2013 | 7/1/2013 | 7/11/2013 | | PASS |
Cindy M. Gould
|
|
|
Addition was done prior to the impact fee ordinance. No impact charged.
|
Routing - PLAN CHECK | 7/1/2013 | | 7/11/2013 | | FAIL |
Tim L. Woodard
|
|
|
Failed Outsource Structural review.
|
Routing Off Site - STRUCTURAL | 6/26/2013 | | 7/8/2013 | | FAIL |
Tim L. Woodard
|
|
|
Correction report attached. TLW
|
Routing - PLANNING | 6/28/2013 | | 7/1/2013 | | PASS |
Josh Wilson
|
|
|
DRH10-00298-Josh Wilson
|
Routing - PUBLIC WORKS | 6/26/2013 | | 6/28/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 6/28/2013 | | 6/28/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 6/27/2013 | | 6/27/2013 | | PASS |
Walt Baumgartner
|
|
|
|
Application received | | 6/25/2013 | 6/26/2013 | | DONE |
Barbara Stitt
|
|
|
|
Pending Assignment by JCM | 6/26/2013 | | 6/26/2013 | | DONE |
John Menard
|
|
|
|
Routing - Addressing | | | 6/26/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLANNING Land Div | 6/26/2013 | | 6/26/2013 | | PASS |
Dave Abo
|
|
|
Parcel "C" of ROS 8916.
|
Plans ACCEPTED BY PLAN TECH | | | 6/26/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/26/2013 | | DONE |
Tisha Gallop
|
|
|
called Erstad Architects and told Megan need initial cert of value of building or BO will set value and need to pay plan check fee.
|
Telephone call | | | 6/26/2013 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
FIRE-Final Inspection | 12/2/2014 | 12/3/2014 | | A | |
Forrest France
|
|
|
Chad Phone #: ###-####
|