Permit Information
Permit NumberBLD13-01675
StatusFinaled
Name BIG D BUILDERS
Site Address 4308 S KENNEDY ST
Project NameWestern Aircraft
Customer Number 
ePlanReviewNo
Description
Western Aircraft Parts Warehouse - To construct a new 13,730 square foot, one story, pre-engineered metal building parts warehouse and office building. This permit also includes related site improvements. This building is fully fire sprinkled. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 3/10/20143/31/2014 DONE
DetailsChristina Prado
completed 3-6-14
Print Statement  3/6/2014 DONE
DetailsChristina Prado
First Notice 2/14/20142/28/2014 DONE
DetailsChristina Prado
mailed 2-28-14
BLD-Final2/3/20142/4/20142/4/2014APASS
DetailsJim Storey
Rick Phone #: ###-####
Permanent Occupancy  2/4/2014 DONE
DetailsChristina Prado
FIRE-Final Inspection2/3/20142/4/20142/3/2014APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final1/21/20141/22/20141/22/2014APART
DetailsJim Sly
rick Phone #: ###-####
OK for Temp. Occ. OK for Perm Occ. when Troy Perms Fire alarm and fire life safety......For Mag lock on front door.
BLD-Final1/21/20141/21/20141/21/2014PDEFR
DetailsJim Storey
rick Phone #: ###-#### out of time
FIRE-Final Inspection1/21/20141/21/20141/21/2014PPART
DetailsTroy Cobbley
A temporary occupancy is being given with scott arellano's permission until the door mag/hardware hase been installed and tested. All other life safety items are ok.
PubWorks Occupancy Approval1/8/20141/8/20141/8/2014 DONE
DetailsTiffany Lowery
Zoning Approval1/7/20141/7/20141/7/2014 DONE
DetailsColleen T Carroll
CHANGE STATUS TO (ISS)  1/7/2014 DONE
(F) Reprint permit  1/7/2014 DONE
BLD-Framing/Rough-in12/27/201312/30/201312/30/2013APASS
DetailsJim Storey
###-#### Rick @ D Builders ceilling ok
OVERRIDE  12/5/2013  
Plan assigned to (JCM)12/3/201312/3/201312/5/2013 PASS
DetailsJohn Menard
Routing - PLAN CHECK12/4/2013 12/5/2013 PASS
DetailsJohn Menard
With red lined note. JCM
PLANS/APPL TAKEN TO FRONT DESK  12/5/2013 DONE
DetailsJohn Menard
Print Occupancy Form  12/5/2013 DONE
Telephone call  12/5/2013 DONE
DetailsChristina Prado
called Richard to advise plan modification is approved, plans are ready and gave fees due
Permit Ready to Issue  12/5/2013 DONE
DetailsChristina Prado
Routing - FIRE12/3/2013 12/4/2013 PASS
DetailsScott Arellano
Updated plan review report attached to plans. No changes in original conditions of approval.
Routing - PLAN CHECK12/3/2013 12/3/2013 PASS
DetailsJohn Menard
Plan Modification Accepted  12/3/2013 DONE
DetailsChristina Prado
Received three sets of revised plan sheets marked A2 as well as Plan Modification application for the addition of a wall in warehouse room 118; Plans taken to John Menard for further review
BLD-Wall cover11/26/201311/26/201311/26/2013PPASS
DetailsJim Storey
rick Phone #: ###-####
Routing - Addressing10/8/2013 10/8/2013 PASS
DetailsJason C. Taylor
Address Changed to 4308 S Kennedy St from 4300 S Kennedy St. Jason Taylor ###-####
BLD-Foundation9/23/20139/24/20139/24/2013APASS
DetailsJim Storey
pouring around 10 - Craig Phone #: ###-####
BLD-Concrete9/20/20139/23/20139/23/2013APASS
DetailsJim Storey
craig Phone #: ###-####
BLD-Footing9/16/20139/17/20139/17/2013APASS
DetailsJim Storey
Craig Phone #: ###-####
BLD-Foundation9/11/20139/12/20139/12/2013APASS
DetailsJim Storey
Craig-Rebar Phone #: ###-####
Plan Reviewer's activity  9/10/2013 PASS
DetailsJohn Menard
Reviewed and approved structural deferred submittal for the concrete retaining walls for the loading dock ramp area. JCM
BLD-Footing9/6/20139/9/20139/9/2013APASS
DetailsJim Storey
rick Phone #: ###-####
Additional plans submitted  9/6/2013 DONE
DetailsTisha Gallop
received deferred submittal for loading dock; received four copies of structural calculations and three copies of plan sheets S0.1, S1.1, S2.1, S2.2; taken to John Menard.
Issue PAID IN FULL permit  7/16/2013 DONE
DetailsTisha Gallop
OVERRIDE  7/15/2013  
Telephone call  7/15/2013 DONE
DetailsTisha Gallop
called Adam at Houston Bugatsch Architects and told him permit is ready, fee and need GC form & ACHD.
Routing - PLAN CHECK7/11/2013 7/15/2013 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  7/15/2013 DONE
DetailsJohn Menard
Print Occupancy Form  7/15/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  7/15/2013 DONE
DetailsTisha Gallop
Plan assigned to (JCM)6/26/2013 7/15/2013 PASS
DetailsJohn Menard
1st Review completed 7/2/2013
Routing - PUBLIC WORKS7/10/2013 7/11/2013 PASS
DetailsConnie Baumgartner
Route to Impact Fee Review7/8/20137/11/20137/10/2013 PASS
DetailsCindy M. Gould
Routing - FIRE7/8/20137/8/20137/10/2013 PASS
DetailsScott Arellano
Attached Fire Code plan review to plans.
1st review completed  7/10/2013 FAIL
Failed PW and Plan check.
Routing PW Sewer Design7/10/2013 7/10/2013 PASS
DetailsKyle S. Rosenmeyer
Routing - PLAN CHECK7/5/2013 7/8/2013 FAIL
DetailsJohn Menard
Routing - PLANNING7/3/2013 7/5/2013 PASS
DetailsSarah Schafer
Approved. This is on City property with no adjacent property lines.
Route to Impact Fee Review6/26/20137/1/20137/3/2013 PASS
DetailsCindy M. Gould
Routing Off Site - STRUCTURAL6/26/2013 7/3/2013 PASS
DetailsJohn Menard
Received letter from consulting structural engineer approving approving structural plans and calculations. JCM
Routing - PLUMBING7/2/2013 7/3/2013 PASS
DetailsDaryl Spivey
Per plan and 2009 ISPC.
Routing - PUBLIC WORKS  7/2/2013 FAIL
DetailsConnie Baumgartner
Failed by Kyle Rosenmeyer for sewe design.
Routing - Erosion and Sediment7/2/2013 7/2/2013 PASS
DetailsKimberly M. Johnson
Routing PW Sewer Design7/1/2013 7/2/2013 FAIL
DetailsKyle S. Rosenmeyer
Use Type "c" connection per ISPWC SD-511. Minimum grades on a type c service line are 1.0%.
Plan resubmittals requested  7/2/2013 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Plan resubmittals received  7/2/2013  
7-2-13 received 3 copies of sheet C2 sent to John M.
Plan resubmittals received  7/2/2013 DONE
DetailsChristina Prado
Received one response letter and two sets of plans marked SP, A3, A & C2; plans inserted by arch rep and taken to John for further review
Routing PW Drainage6/28/2013 7/1/2013 PASS
DetailsBrian Murphy
Routing PW Sewer Rating6/28/2013 6/28/2013 PASS
DetailsConnie Baumgartner
Routing PW Environmental6/27/2013 6/27/2013 PASS
DetailsWalt Baumgartner
Application received 6/26/20136/26/2013 DONE
DetailsTisha Gallop
Pending Assignment by JCM6/26/2013 6/26/2013 DONE
DetailsJohn Menard
Plans ACCEPTED BY PLAN TECH  6/26/2013 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  6/26/2013 DONE
DetailsTisha Gallop
Routing - PLANNING Land Div6/26/2013 6/26/2013 PASS
DetailsDave Abo
Parcel over 5 acres in size.
Routing - Addressing6/26/2013 6/26/2013 PASS
DetailsJason C. Taylor
Telephone call  6/26/2013 DONE
DetailsTisha Gallop
called Action Couriers for pick up