Permit Information
Permit NumberBLD13-01678
StatusVoid/No Violation
Name JEFF BANKA
Site Address 301 S CAPITOL BLVD
Project NameBOISE STATE UNIVERSITY
Customer Number 
ePlanReviewNo
Description
**(Idaho State Board of Education – BSU – Bodo #7 – NE Corner)** Application for inspection to determine requirements for issuance of a Certificate of Occupancy for a 8,466 sq ft existing office / assembly tenant space. This space was previously occupied by "IDAHO ASSOCIATION OF REALTORS" under BLD06-01951. NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT. There will be no change to the occupancy. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  6/12/2017 DONE
DetailsAdele J Schaffeld-Griffin
Case can be closed, no c of o issued by city. Permits obtained through DBS.

FYI on State Condo ownership within buildings and required permits:

***This issue with the State on condo ownership within tenant spaces has been a challenge to determine. Have been discussing with Legal again.

What I am hearing back from Legal is, if the work is contained within the condo walls and ceiling, this can be construed as a State owned “facility”, however, the systems that serve the space (sprinklers, alarms, mechanical, etc…) or any structural work that are part of the condo association ownership (like above the ceiling), would need permits from us. So, sounds like they may be okay with State permits for nonstructural TI or trade work within the space but may need to obtain City building or trade permits where structure or systems are affected outside the condo ceiling/walls ownership.***

Jason
VOIDED CHANGE STATUS  6/12/2017 DONE
DetailsAdele J Schaffeld-Griffin
Plan Reviewer's activity  2/2/2016 DONE
DetailsAdele J Schaffeld-Griffin
this permit has expired however it is occupied. i sent a letter to the tenant and condo association 2/2/16 to get TI submitted. no insepctions for the TI can be completed under this permit.
FIRE-Final Inspection4/17/20144/29/20144/29/2014AFAIL
DetailsForrest France
Cathline ###-####-call 20 minutes prior Cathline would like both inspections done at the same time
BLD-Final4/17/20144/29/20144/29/2014AFAIL
DetailsDave Hannah
Cathline ###-####-call 20 minutes prior Cathline would like both inspections done at the same time
FIRE-Final Inspection3/20/20143/24/20143/21/2014ACANC
DetailsForrest France
jeff Phone #: ###-#### //jeff called in and cancelled this inspection - will call sometime next week and reschedule 3-21-14 ps 11:14am
Issue PAID IN FULL permit  7/9/2013 DONE
DetailsChristina Prado
Plan assigned to (TLW)6/26/2013 7/3/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK6/26/2013 7/3/2013 PASS
DetailsTim L. Woodard
1st review completed  7/3/2013 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  7/3/2013 DONE
DetailsTim L. Woodard
Case Summary (BLD)  7/3/2013 DONE
DetailsTim L. Woodard
Print Occupancy Form  7/3/2013 DONE
Permit Ready to Issue  7/3/2013  
Telephone call  7/3/2013  
7-3-13 called Jeff left message permit ready for pick up ///dld
Plans ACCEPTED BY PLAN TECH  6/26/2013 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  6/26/2013 DONE
DetailsChristina Prado
Application received 6/26/2013