Second Notice | | 3/15/2014 | 3/31/2014 | | DONE |
Christina Prado
|
|
|
mailed 4-1-14
|
First Notice | | 2/6/2014 | 3/5/2014 | | DONE |
|
|
|
Faxed 3-5-14
|
BLD-Final | 1/24/2014 | 1/27/2014 | 1/27/2014 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Todd McLean
|
Permanent Occupancy | | | 1/27/2014 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 1/23/2014 | 1/24/2014 | 1/24/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed. The two exit discharge lights were repaired while on site
|
Zoning Approval | 1/22/2014 | 1/22/2014 | 1/22/2014 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH12-00319 Modification.
|
FIRE-Sprinkler Rough-in | 1/3/2014 | 1/3/2014 | 1/3/2014 | A | DONE |
Forrest France
|
|
|
Okay to cover remainder of grid and sheetrock lid ceilings throughout. Discussed project related trade permit work and life safety features.
|
BLD-Ceiling Grid Inspection | 1/2/2014 | 1/3/2014 | 1/3/2014 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Todd McLean
|
BLD-Wall cover | 12/5/2013 | 12/9/2013 | 12/9/2013 | P | PASS |
Dave Hannah
|
|
|
Please ask for Todd, thanks. Phone #: ###-#### >> Inspection requested via web by Todd McLean
|
BLD-Framing/Rough-in | 12/3/2013 | 12/4/2013 | 12/9/2013 | A | PASS |
Dave Hannah
|
|
|
Please ask for Todd when you arrive.
Thanks. Phone #: ###-#### >> Inspection requested via web by Todd McLean
|
BLD-Conference | 11/4/2013 | 11/5/2013 | 11/6/2013 | P | DONE |
Dave Hannah
|
|
|
Conference and slab re-bar inspection. Phone #: ###-#### >> Inspection requested via web by Todd McLean
|
Issue PAID IN FULL permit | | | 10/28/2013 | | DONE |
|
|
|
|
Application received | | 6/26/2013 | 7/10/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing PW Environmental | 6/27/2013 | | 7/10/2013 | | PASS |
Walt Baumgartner
|
|
|
|
Permit Ready to Issue | | | 7/10/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/10/2013 | | DONE |
Tisha Gallop
|
|
|
called Dago Barajas and told him permit is ready, fee due and need GC form.
|
Plan assigned to (SRZ) | 6/27/2013 | 6/27/2013 | 7/9/2013 | | PASS |
Sam Zahorka
|
|
|
**GREEN TAG** TRADER JOES
|
Routing - FIRE | 7/8/2013 | | 7/9/2013 | | PASS |
Scott Arellano
|
|
|
Attached Fire Code comments to plans.
|
1st review completed | | | 7/9/2013 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 7/9/2013 | | 7/9/2013 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2013 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 7/9/2013 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 7/8/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 7/1/2013 | | 7/8/2013 | | PASS |
Sam Zahorka
|
|
|
|
Routing - Design Review | 6/28/2013 | | 7/1/2013 | | PASS |
Sarah Schafer
|
|
|
Sarah Schafer - DRH12-00319 Approved per the DR.
|
Routing - PLUMBING | 6/27/2013 | | 6/28/2013 | | PASS |
Bill VanDegrift
|
|
|
1) increase vent to 3" to first tee at restroom to meet cross sectional area, UPC 904.1
2) Idaho State Code, indirect waste required at three compartment sink or grease trap.
3) note 19 page P-2, mount R.P. over P-4 at vacuum pump
4) note 4 page P-4, PVC for ecterior piping only
5) provide 120 degree max. hot water to lavs and hand sinks
6) detail 4 page P-3 pipe T&P drain to P-4
|
Routing - Addressing | 6/27/2013 | | 6/27/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | | | 6/27/2013 | | PASS |
|
|
|
|
Pending Assignment by JCB | 6/26/2013 | | 6/27/2013 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 6/26/2013 | | PASS |
Sam Zahorka
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/26/2013 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/26/2013 | | DONE |
Christina Prado
|
|
|
|