Third Notice | | 6/14/2015 | 7/13/2015 | | DONE |
|
|
|
|
Third Notice | | 5/10/2015 | 6/9/2015 | | DONE |
|
|
|
|
Third Notice | | 2/7/2015 | 5/5/2015 | | DONE |
|
|
|
|
Third Notice | | 1/11/2015 | 2/2/2015 | | DONE |
|
|
|
|
Third Notice | | 11/12/2014 | 12/1/2014 | | DONE |
|
|
|
|
Third Notice | | 9/3/2014 | 11/3/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson @ ESI
|
Third Notice | | 6/14/2014 | 8/29/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson
|
Third Notice | | 5/10/2014 | 6/9/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson
|
Third Notice | | 4/5/2014 | 5/5/2014 | | DONE |
|
|
|
e-mailed to Adam Johnson
|
Second Notice | | 3/16/2014 | 3/31/2014 | | DONE |
|
|
|
|
First Notice | | 2/24/2014 | 3/6/2014 | | DONE |
|
|
|
|
BLD-Final | 2/13/2014 | 2/14/2014 | 2/14/2014 | P | PASS |
Dave Hannah
|
|
|
Reinspection of 17th Floor Holland and Hart after walk with Forrest. Coordinate with Adam for inspection. Crews will be on site to drop power and test MAG locks for Forrest. Thanks. AKJ >> Inspection requested via web by Adam Johnson
|
FIRE-Final Inspection | 2/13/2014 | 2/14/2014 | 2/14/2014 | A | PASS |
Forrest France
|
|
|
Previous C/N items verified for completion. Fire life safety passed.
|
Permanent Occupancy | | | 2/14/2014 | | DONE |
|
|
|
|
BLD-Final | 2/10/2014 | 2/11/2014 | 2/12/2014 | P | NR |
Dave Hannah
|
|
|
Final inspection request of H&H 17th Floor. Adam will walk with you for this inspection. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson needs fire life saftey final first
|
FIRE-Final Inspection | 2/10/2014 | 2/11/2014 | 2/11/2014 | P | PART |
Forrest France
|
|
|
Final pending relay to the fire alarm panel at the main entry/exit door mags, post max occupant signage at the meeting room.
|
Print Occupancy Form | | | 1/9/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Framing/Rough-in | 12/30/2013 | 12/30/2013 | 12/31/2013 | P | PART |
Dave Hannah
|
|
|
Framing inspection requested by John Woods, FCS, 17th Floor Holland and Hart. Thanks, AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover hard lids each side of elevators
|
BLD-Framing/Rough-in | 12/10/2013 | 12/10/2013 | 12/11/2013 | P | PASS |
Dave Hannah
|
|
|
Faming inspection walk requested by John Woods FCS. Thanks. akj 12-10-13 Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 11/22/2013 | 11/22/2013 | 11/25/2013 | P | PART |
Dave Hannah
|
|
|
Framing Holland and Hart, 17th Floor. Thanks. Adam. Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to one side int walls
|
BLD-Framing/Rough-in | 10/1/2013 | 10/1/2013 | 10/3/2013 | P | NR |
Dave Hannah
|
|
|
17th Floor, Holland and Hart, East and South Sections. Thanks. Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
Issue PAID IN FULL permit | | | 8/8/2013 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 8/7/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 8/7/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - FIRE | 7/30/2013 | 7/30/2013 | 7/31/2013 | | PASS |
Scott Arellano
|
|
|
Attached Plan Review report to case. Plans are approved with conditions and red lined annotations.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/31/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 7/3/2013 | | 7/31/2013 | | PASS |
Tim L. Woodard
|
|
|
1st Review Complete.
|
Plan resubmittals received | | | 7/30/2013 | | DONE |
Tim L. Woodard
|
|
|
E-Plan
|
Routing - PLAN CHECK | 7/30/2013 | | 7/30/2013 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 7/17/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/3/2013 | | 7/17/2013 | | FAIL |
Tim L. Woodard
|
|
|
Refer to change marks on drawings. TLW
|
Routing - PLUMBING | 7/3/2013 | | 7/11/2013 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - FIRE | 7/3/2013 | 7/3/2013 | 7/9/2013 | | FAIL |
Scott Arellano
|
|
|
Emailed resubmittal item to architect. Attached plan review report to case.
|
Routing PW Sewer Rating | 7/5/2013 | | 7/5/2013 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 7/3/2013 | | 7/5/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 7/3/2013 | | 7/5/2013 | | PASS |
Beverly Mountain
|
|
|
|
Pending Assignment by JCB | 7/3/2013 | | 7/3/2013 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 7/2/2013 | | PASS |
Jason Blais
|
|
|
Prescreen passed by Tim Woodard and plan review fees paid on 7/1/13. Received applications on 7/2/13.
|
Application received | | | 6/27/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 27 2013 9:44AM
|