BLD-Final | 2/11/2014 | 2/12/2014 | 2/12/2014 | A | PASS |
Dave Hannah
|
|
|
clint Phone #: ###-#### blower door 3.8
|
DOC - Permit Finaled | 2/12/2014 | 2/12/2014 | 2/12/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 12/10/2013 | 12/11/2013 | 12/11/2013 | A | PASS |
Dave Hannah
|
|
|
Clint Phone #: ###-####
|
BLD-Energy code compliance | 12/3/2013 | 12/10/2013 | 12/10/2013 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 12/3/2013 | 12/6/2013 | 12/6/2013 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 11/18/2013 | 11/19/2013 | 11/19/2013 | A | PASS |
Jim Storey
|
|
|
Joey Phone #: ###-####
|
BLD-Wall Bracing | 11/14/2013 | 11/14/2013 | 11/15/2013 | P | PART |
Dave Hannah
|
|
|
Joey Phone #: ###-#### second floor ok to cover ext.
|
BLD-Foundation | 10/10/2013 | 10/11/2013 | 10/14/2013 | P | PASS |
Dave Hannah
|
|
|
wes Phone #: ###-####
|
BLD-Footing | 10/9/2013 | 10/10/2013 | 10/10/2013 | A | PASS |
Tom Arcoraci
|
|
|
wes - call prior to going Phone #: ###-####
|
BLD-Footing | 10/9/2013 | 10/10/2013 | 10/10/2013 | A | PASS |
Tom Arcoraci
|
|
|
wes Phone #: ###-#### (this inspection was scheduled for yesterday afternoon, but this inspection was not reassigned to an available inspector so Bob A. auth to pour and will verify footing this morning)
|
BLD-Footing | 10/3/2013 | 10/3/2013 | 10/4/2013 | P | PASS |
Dave Hannah
|
|
|
anton Phone #: ###-#### setbacks ok ? about grade
|
Issue PAID IN FULL permit | | | 9/27/2013 | | DONE |
Barbara Stitt
|
|
|
|
OVERRIDE | | | 7/17/2013 | | |
|
|
|
|
Plan assigned to (AJS) | | 7/1/2013 | 7/17/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Due 7/12
|
Routing - PLAN CHECK | 7/17/2013 | | 7/17/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 7/17/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/17/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 7/17/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/17/2013 | | DONE |
Tisha Gallop
|
|
|
called Tahoe Homes and left vm permit is ready and fee.
|
Plan Reviewer's activity | | | 7/10/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
emails from 7/10/13 sent to draft tech and leonard,
Thank you for responding. When you are standing in front of the home looking at the entrance the entrance is on the right side of the dwelling, per the site plan. The elevation shows the entrance door on the left of the dwelling. I understand that sometimes these homes are flipped but in the cases were they are, all of the submitted sheets should be the same. The revised floor plan submitted shows the entrance door on the right but the foundation, main level and upstairs have the entry on the left. It is okay to have the house flipped from the site plan but then all of the sheets submitted need to be the same.
Please feel free to contact me if you have any questions. Also I will need two full sized copies of all sheets submit to PDS as we are not able to print full sized sheets.
Thank you
Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####
From: Draftech [mailto:brendan@draftechidaho.com]
Sent: Wednesday, July 10, 2013 9:30 AM
To: leonardwd@tahoe-homes.com
Cc: Adele Schaffeld-Griffin
Subject: RE: 2905 Honeycomb way
Leonard,
It looks to me that the discrepancy is in the footprint on the site plan, very minor in the garage and fireplace. (not the perimeter) The rest of the plan is correct.
I have corrected the site plan effecting only the cover page. Attached is the sheet.
Let me know if you need anything else.
Thanks,
Brendan Smythe
Designer/Owner
###-####
From: Leonard W Dooms [mailto:leonardwd@tahoe-homes.com]
Sent: Wednesday, July 10, 2013 7:37 AM
To: 'Draftech'
Subject: FW: 2905 Honeycomb way
Sunflower 13C for 7-31 Hr9
Leonard W Dooms
Tahoe Homes LLC
RCE 452
________________________________________
From: Adele Schaffeld-Griffin [mailto:ASchaffeldGriffin@cityofboise.org]
Sent: Monday, July 08, 2013 9:54 AM
To: leonardwd@tahoe-homes.com
Cc: Adele Schaffeld-Griffin
Subject: 2905 Honeycomb way
Leonard,
I have completed my plan review for BLD13-01724.
I received a revised second floor framing plan that matches the layout of the house as shown on the site plan. However there are still several other sheets that do not match the layout of the house as shown on the site plan. Please submit 2 sheets of all corrected sheets.
Thank you.
Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####
|
Plan resubmittals received | | | 7/10/2013 | | DONE |
Christina Prado
|
|
|
received two revised sets of plans marked 1, 2,3,4,5,6,7,8 & 9; Taken to Adele for review
|
Routing - MECHANICAL | 7/3/2013 | | 7/9/2013 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 7/8/2013 | | 7/8/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
emailed loenard 7/8/13
Leonard,
I have completed my plan review for BLD13-01724.
I received a revised second floor framing plan that matches the layout of the house as shown on the site plan. However there are still several other sheets that do not match the layout of the house as shown on the site plan. Please submit 2 sheets of all corrected sheets.
Thank you.
Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####
|
1st review completed | | | 7/8/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLANNING | 7/2/2013 | | 7/3/2013 | | PASS |
Joshua Johnson
|
|
|
|
Route to Impact Fee Review | 7/1/2013 | 7/5/2013 | 7/2/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Addressing | 7/1/2013 | | 7/2/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | | | 7/2/2013 | | PASS |
|
|
|
|
Plan resubmittals received | | | 7/2/2013 | | DONE |
Christina Prado
|
|
|
received two sets of revised plan sheets numbered 6; taken to Adele for review
Adele- put revisions with plans in Jason T office. 7/2/13
|
Plans ACCEPTED BY PLAN TECH | | | 7/1/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 7/1/2013 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/1/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 7/1/2013 | | | |
|
|
|
|