Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-01724
StatusFinaled
Name TAHOE HOMES LLC
Site Address 2905 S HONEYCOMB WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI ZONE B, Permit for the construction of a new 2295 sq. ft., two story (first story 1364 sq. ft., second story 931 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 161 sq. ft. of covered patio/porch and a 850 sq. ft. attached garage per the approved plans, res check, attached engineering, plan review report and any notations. SP-01 zoning and setbacks per planning. AJS
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/11/20142/12/20142/12/2014APASS
DetailsDave Hannah
clint Phone #: ###-#### blower door 3.8
DOC - Permit Finaled2/12/20142/12/20142/12/2014PPASS
DetailsDave Hannah
BLD-Energy code compliance12/10/201312/11/201312/11/2013APASS
DetailsDave Hannah
Clint Phone #: ###-####
BLD-Energy code compliance12/3/201312/10/201312/10/2013ANR
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Framing/Rough-in12/3/201312/6/201312/6/2013APASS
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Wall Bracing11/18/201311/19/201311/19/2013APASS
DetailsJim Storey
Joey Phone #: ###-####
BLD-Wall Bracing11/14/201311/14/201311/15/2013PPART
DetailsDave Hannah
Joey Phone #: ###-#### second floor ok to cover ext.
BLD-Foundation10/10/201310/11/201310/14/2013PPASS
DetailsDave Hannah
wes Phone #: ###-####
BLD-Footing10/9/201310/10/201310/10/2013APASS
DetailsTom Arcoraci
wes - call prior to going Phone #: ###-####
BLD-Footing10/9/201310/10/201310/10/2013APASS
DetailsTom Arcoraci
wes Phone #: ###-#### (this inspection was scheduled for yesterday afternoon, but this inspection was not reassigned to an available inspector so Bob A. auth to pour and will verify footing this morning)
BLD-Footing10/3/201310/3/201310/4/2013PPASS
DetailsDave Hannah
anton Phone #: ###-#### setbacks ok ? about grade
Issue PAID IN FULL permit  9/27/2013 DONE
DetailsBarbara Stitt
OVERRIDE  7/17/2013  
Plan assigned to (AJS) 7/1/20137/17/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Due 7/12
Routing - PLAN CHECK7/17/2013 7/17/2013 PASS
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  7/17/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  7/17/2013 DONE
Inspection Record Card- Bld  7/17/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  7/17/2013 DONE
DetailsTisha Gallop
Telephone call  7/17/2013 DONE
DetailsTisha Gallop
called Tahoe Homes and left vm permit is ready and fee.
Plan Reviewer's activity  7/10/2013 DONE
DetailsAdele J Schaffeld-Griffin
emails from 7/10/13 sent to draft tech and leonard,

Thank you for responding. When you are standing in front of the home looking at the entrance the entrance is on the right side of the dwelling, per the site plan. The elevation shows the entrance door on the left of the dwelling. I understand that sometimes these homes are flipped but in the cases were they are, all of the submitted sheets should be the same. The revised floor plan submitted shows the entrance door on the right but the foundation, main level and upstairs have the entry on the left. It is okay to have the house flipped from the site plan but then all of the sheets submitted need to be the same.

Please feel free to contact me if you have any questions. Also I will need two full sized copies of all sheets submit to PDS as we are not able to print full sized sheets.

Thank you


Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####

From: Draftech [mailto:brendan@draftechidaho.com]
Sent: Wednesday, July 10, 2013 9:30 AM
To: leonardwd@tahoe-homes.com
Cc: Adele Schaffeld-Griffin
Subject: RE: 2905 Honeycomb way

Leonard,

It looks to me that the discrepancy is in the footprint on the site plan, very minor in the garage and fireplace. (not the perimeter) The rest of the plan is correct.
I have corrected the site plan effecting only the cover page. Attached is the sheet.

Let me know if you need anything else.
Thanks,

Brendan Smythe
Designer/Owner
###-####





From: Leonard W Dooms [mailto:leonardwd@tahoe-homes.com]
Sent: Wednesday, July 10, 2013 7:37 AM
To: 'Draftech'
Subject: FW: 2905 Honeycomb way

Sunflower 13C for 7-31 Hr9


Leonard W Dooms
Tahoe Homes LLC
RCE 452
________________________________________
From: Adele Schaffeld-Griffin [mailto:ASchaffeldGriffin@cityofboise.org]
Sent: Monday, July 08, 2013 9:54 AM
To: leonardwd@tahoe-homes.com
Cc: Adele Schaffeld-Griffin
Subject: 2905 Honeycomb way

Leonard,

I have completed my plan review for BLD13-01724.

I received a revised second floor framing plan that matches the layout of the house as shown on the site plan. However there are still several other sheets that do not match the layout of the house as shown on the site plan. Please submit 2 sheets of all corrected sheets.

Thank you.

Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####

Plan resubmittals received  7/10/2013 DONE
DetailsChristina Prado
received two revised sets of plans marked 1, 2,3,4,5,6,7,8 & 9; Taken to Adele for review
Routing - MECHANICAL7/3/2013 7/9/2013 PASS
DetailsTroy James
Routing - PLAN CHECK7/8/2013 7/8/2013 FAIL
DetailsAdele J Schaffeld-Griffin
emailed loenard 7/8/13
Leonard,

I have completed my plan review for BLD13-01724.

I received a revised second floor framing plan that matches the layout of the house as shown on the site plan. However there are still several other sheets that do not match the layout of the house as shown on the site plan. Please submit 2 sheets of all corrected sheets.

Thank you.

Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####

1st review completed  7/8/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLANNING7/2/2013 7/3/2013 PASS
DetailsJoshua Johnson
Route to Impact Fee Review7/1/20137/5/20137/2/2013 PASS
DetailsCindy M. Gould
Routing - Addressing7/1/2013 7/2/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS  7/2/2013 PASS
Plan resubmittals received  7/2/2013 DONE
DetailsChristina Prado
received two sets of revised plan sheets numbered 6; taken to Adele for review
Adele- put revisions with plans in Jason T office. 7/2/13
Plans ACCEPTED BY PLAN TECH  7/1/2013 DONE
DetailsChristina Prado
Intake Approval  7/1/2013 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  7/1/2013 DONE
DetailsChristina Prado
Application received 7/1/2013