Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD13-01742
StatusFinaled
Name HEAD ROBERT D
Site Address 1136 E INSIGNIA DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 3062 sq. ft., two story (first story 1327 sq. ft., second story 1735 sq. ft.) single family dwelling with 3 bedrooms, 3 bathrooms, approximately 209 sq. ft. of covered patio/porch and a 694 sq. ft. attached garage per the approved plans, plan review report and any notations. R-2D zoning and setbacks per planning. CDM All compaction testing results and a letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/6/2016 DONE
BLD-Final3/28/20143/28/20143/28/2014PPASS
DetailsJim Storey
Robert Phone #: ###-####
DOC - Permit Finaled3/28/20143/28/20143/28/2014PPASS
DetailsJim Storey
PubWorks Occupancy Approval3/28/20143/28/20143/28/2014 DONE
DetailsJason C. Taylor
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.

BLD-Final3/26/20143/27/20143/27/2014PNR
DetailsJim Storey
robert Phone #: ###-#### need pw sign off
BLD-Energy code compliance12/18/201312/18/201312/18/2013PPASS
DetailsTom Arcoraci
BLD-Energy code compliance12/17/201312/18/201312/18/2013ANR
DetailsTom Arcoraci
Robert Phone #: ###-#### will return in the pm
BLD-Energy code compliance12/16/201312/17/201312/17/2013PDEFR
DetailsJim Storey
Robert Phone #: ###-#### not ready out of time defred to am
BLD-Framing/Rough-in12/13/201312/16/201312/16/2013APASS
DetailsJim Storey
bob Phone #: ###-####
Plan Modification Accepted  11/14/2013 DONE
new manual j
Routing - MECHANICAL11/14/2013 11/14/2013 PASS
DetailsTroy James
new manual j submitted
BLD-Conference11/12/201311/13/201311/13/2013APART
DetailsJim Storey
robert Phone #: ###-#### beamm calks ok need garage thru bolt or revison.
BLD-Foundation10/4/201310/4/201310/4/2013PPASS
DetailsJim Storey
early pm please// Dave Phone #: ###-####
BLD-Footing10/2/201310/3/201310/3/2013APASS
DetailsJim Storey
Dave Phone #: ###-####
BLD-Footing10/1/201310/2/201310/2/2013ANR
DetailsJim Storey
pouring at noon - dane Phone #: ###-#### pw not signed off
PubWorks Subgrade Approval10/2/201310/2/201310/2/2013 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  7/24/2013 DONE
DetailsBarbara Stitt
OVERRIDE  7/23/2013  
Plan assigned to (CDM)7/11/20137/11/20137/23/2013 PASS
DetailsCarl D Madsen
First review completed. 7-17-13 CDM
Telephone call  7/23/2013  
Please call John Head for pick up of plans @ ###-####
Routing - PLAN CHECK7/23/2013 7/23/2013 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  7/23/2013 DONE
Case Summary (BLD)  7/23/2013 DONE
Inspection Record Card- Bld  7/23/2013 DONE
Telephone call  7/23/2013 DONE
DetailsChristina Prado
left message for Robert - need to verifiy GC info prior to issuance - either parcel owner or under contractor license. Also gave fees due
Permit Ready to Issue  7/23/2013 DONE
DetailsChristina Prado
Plan resubmittals received  7/19/2013 DONE
DetailsChristina Prado
received two sets of revise structural calcs and plans marked A2, A3, A4 & A5:Plans taken to Carl Madsen for further review
1st review completed  7/17/2013 FAIL
Routing - PLAN CHECK7/8/2013 7/17/2013 FAIL
DetailsCarl D Madsen
Need revisions to the structurals plans, engineers stam required. Called and E-Mailed Jason with countryside design and robert Head. 7-17-13 CDM
Plan assigned to (AJS)7/1/20137/1/20137/11/2013 DEFR
DetailsAdele J Schaffeld-Griffin
Hillside Due 7/18
Routing - FIRE7/9/20137/9/20137/9/2013 PASS
DetailsScott Arellano
No comments
Routing - MECHANICAL7/9/2013 7/9/2013 PASS
DetailsTroy James
Routing - Erosion and Sediment7/8/2013 7/9/2013 PASS
DetailsKimberly M. Johnson
Routing PW Grading-Hillside7/3/2013 7/8/2013 PASS
DetailsJason C. Taylor
All compaction testing results and a letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - MECHANICAL7/3/2013 7/8/2013 FAIL
DetailsTroy James
emailed correction to Teds Heating
Routing - PLANNING7/3/2013 7/3/2013 PASS
DetailsSue Cummings
Routing - Addressing7/1/2013 7/3/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS  7/3/2013 PASS
DetailsConnie Baumgartner
Route to Impact Fee Review7/1/20137/5/20137/2/2013 PASS
DetailsCindy M. Gould
Application received 7/1/20137/1/2013 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  7/1/2013 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  7/1/2013 DONE
DetailsBarbara Stitt
Intake Approval  7/1/2013 PASS
DetailsBarbara Stitt