Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD13-01748
StatusFinaled
Name BERKELEY BUILDING COMPANY INC
Site Address 1022 E CARTER ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 3183 sq. ft., two story (first story 1724 sq. ft., second story 1459 sq. ft.) single family dwelling with 4 bedrooms, and (3) baths, approximately 696 sq. ft. of covered patio/porch and a 1057 sq. ft. attached garage per the approved plans, plan review report, attached engineering and any notations. R-1C zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/8/201311/12/201311/12/2013APASS
DetailsJim Storey
Call for access code - Ray Phone #: ###-####
DOC - Permit Finaled11/12/201311/12/201311/12/2013PPASS
DetailsJim Storey
BLD-Blower Door Test Results11/12/201311/12/201311/12/2013APASS
DetailsJim Storey
4.0
Letter of compliance/Occupancy  11/12/2013 DONE
DetailsTisha Gallop
BLD-Energy code compliance9/20/20139/20/20139/20/2013PPASS
DetailsJim Storey
ray Phone #: ###-####
BLD-Framing/Rough-in9/17/20139/18/20139/18/2013APASS
DetailsJim Storey
ray Phone #: ###-####
BLD-Framing/Rough-in9/10/20139/10/20139/10/2013PPASS
DetailsJim Storey
Shear inspection please-Ray Phone #: ###-####
Plan resubmittals received  9/10/2013 DONE
new manual j
Routing - MECHANICAL9/10/2013 9/10/2013 PASS
DetailsTroy James
resubmitted manual j
BLD-Footing8/6/20138/6/20138/6/2013PPASS
DetailsTom Arcoraci
Jared Phone #: ###-####
Issue PAID IN FULL permit  8/2/2013 DONE
OVERRIDE  7/18/2013  
Plan assigned to (CDM)7/11/20137/11/20137/18/2013 PASS
DetailsCarl D Madsen
First review completed 7-15-13 CDM
Application received 7/2/20137/18/2013 DONE
Routing - PLAN CHECK7/18/2013 7/18/2013 PASS
DetailsCarl D Madsen
Case Summary (BLD)  7/18/2013 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/18/2013 DONE
Inspection Record Card- Bld  7/18/2013 DONE
DetailsTisha Gallop
Telephone call  7/18/2013 DONE
DetailsChristina Prado
called Randy to advise permit is ready pending Rp and gave fees due
Permit Ready to Issue  7/18/2013 DONE
DetailsChristina Prado
Plan resubmittals received  7/17/2013 DONE
DetailsChristina Prado
received two sets of revised plan sheets marked A2, A3, A4 & A6;Plans taken to Carl for review
Routing - Erosion and Sediment7/12/2013 7/15/2013 PASS
DetailsKimberly M. Johnson
1st review completed  7/15/2013 FAIL
Routing - PLAN CHECK7/9/2013 7/15/2013 FAIL
DetailsCarl D Madsen
Inaequate beams and additional information required to be on the plans from the engineering. E-Mailed Sandy and Joe at Berkeley. 7-15-13 CDM
Plan assigned to (AJS)7/2/20137/2/20137/11/2013 DEFR
DetailsAdele J Schaffeld-Griffin
Due 7/15
Routing - MECHANICAL7/9/2013 7/9/2013 PASS
DetailsTroy James
Routing - Erosion and Sediment7/9/2013 7/9/2013 FAIL
DetailsKimberly M. Johnson
Needs ECP. Called Joe to notify; engineer is working on it.
Routing - PLANNING7/9/2013 7/9/2013 PASS
DetailsLeon Letson
Re-submittal approved
Routing - MECHANICAL  7/9/2013 FAIL
emailed corrections to Integrity heating
Routing - PLANNING7/5/2013 7/8/2013 FAIL
DetailsLeon Letson
Driveway width and separation do not meet B.C.C. requirements. Driveway shall be a maximum of 33' wide within setbacks and separated a minimum of 3' from adjacent properties.
Routing - PUBLIC WORKS  7/5/2013 PASS
Route to Impact Fee Review7/2/20137/8/20137/3/2013 PASS
DetailsCindy M. Gould
Routing - Addressing7/2/2013 7/3/2013 PASS
DetailsJason C. Taylor
Intake Approval  7/2/2013 PASS