Permit Information
Permit NumberBLD13-01750
StatusFinaled
Name TAHOE HOMES LLC
Site Address 2882 S HONEYCOMB WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI ZONE B, Permit for the construction of a new 2,358 sq. ft., two story (first story 1,182 sq. ft., second story 1,176 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 100 sq. ft. of covered patio/porch and a 857 sq. ft. attached garage per the approved plans, res check attached engineering, plan review report and any notations. SP-01 zoning and setbacks per planning. AJS
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/31/20131/3/20141/3/2014APASS
DetailsDave Hannah
clint Phone #: ###-####
DOC - Permit Finaled1/3/20141/3/20141/3/2014PPASS
DetailsDave Hannah
BLD-Energy code compliance10/29/201310/30/201310/30/2013APASS
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Framing/Rough-in10/25/201310/28/201310/28/2013APASS
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Clint Wall
BLD-Wall Bracing10/8/201310/8/201310/8/2013PPASS
DetailsDave Hannah
joey Phone #: ###-####
BLD-Framing/Rough-in10/3/201310/3/201310/4/2013PPART
DetailsDave Hannah
Joey-Shear inspection please Phone #: ###-#### upper level ok to cover ext
BLD-Foundation8/29/20138/29/20138/29/2013PPASS
DetailsDave Hannah
alvaro Phone #: ###-####
BLD-Footing8/28/20138/28/20138/28/2013PPART
DetailsJim Storey
Alvaro Phone #: ###-####wip set backs ok
Issue PAID IN FULL permit  7/24/2013 DONE
DetailsChristina Prado
OVERRIDE  7/23/2013  
Plan assigned to (AJS)7/2/20137/2/20137/23/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Due 7/15
Telephone call  7/23/2013 DONE
DetailsBarbara Stitt
Called and left voice message that pemit is ready and fees due on 7-23-13 @ 3:45pm//BAS
Routing - PLAN CHECK7/23/2013 7/23/2013 PASS
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  7/23/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  7/23/2013 DONE
Inspection Record Card- Bld  7/23/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  7/23/2013 DONE
DetailsBarbara Stitt
Plan resubmittals received  7/22/2013 DONE
Routing - MECHANICAL  7/9/2013 PASS
DetailsTroy James
Routing - PLAN CHECK7/8/2013 7/8/2013 FAIL
DetailsAdele J Schaffeld-Griffin
emailed leonard 7/8/13
Leonard,

I have completed the building plan review for BLD13-01750.

Please provide the stamped engineering calculations for the engineered lateral analysis. The balloon framed portion shown on the wall bracing exceeds prescriptive design.

Please provide the beam/ angled post calculations for this project.

Thank you

Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####


1st review completed  7/8/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Route to Impact Fee Review7/2/20137/8/20137/5/2013 PASS
DetailsCindy M. Gould
Routing - PLANNING7/3/2013 7/5/2013 PASS
DetailsLeon Letson
Application received 7/2/20137/3/2013 DONE
DetailsTisha Gallop
Routing - Addressing7/3/2013 7/3/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS7/3/2013 7/3/2013 PASS
DetailsConnie Baumgartner
Intake Approval  7/2/2013 PASS
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  7/2/2013 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  7/2/2013 DONE
DetailsTisha Gallop