Permit Information
Permit NumberBLD13-01764
StatusIssued
Name ESI
Site Address 1797 W STATE ST
Project NameSTARBUCKS
Customer Number 
ePlanReviewYes
Description
(STARBUCKS – Interior Remodel) To remodel an existing coffee shop originally installed under BLD97-02678. Scope of work: improvements to the front and back bar areas, minor repairs, new furniture, new ceilings, new casework, new equipment, minor exterior work and interior finishes. This building is not fire sprinklered. NOTE: Under this review the overall occupant load actually decreases due to a larger back bar area. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  12/23/2013 DONE
FIRE-Final Inspection10/1/201310/2/201310/2/2013APASS
DetailsForrest France
Remainder of project completed. Life safety inspection passed. No signature card available on site.
FIRE-Final Inspection9/6/20139/9/20139/9/2013PCANC
DetailsForrest France
kevin Phone #: ###-####
BLD-Final9/5/20139/6/20139/6/2013PPART
DetailsJim Sly
kevin Phone #: ###-####
OK for Temp Occ.
FIRE-Final Inspection9/5/20139/6/20139/6/2013APART
DetailsForrest France
Life safety final pending equipment layout and finishes underway. Contractor to provide new battery backup at the EM light and exit sign in the employee work area as discussed. Final inspection scheduled 9/9/13. Okayed for start-up.
BLD-Framing/Rough-in8/29/20138/30/20138/30/2013APASS
DetailsTony Young
kevin Phone #: ###-####
BLD-Framing/Rough-in8/29/20138/29/20138/29/2013PPART
DetailsTony Young
kevin Phone #: ###-####,, walls ok pending trades
BLD-Framing/Rough-in8/28/20138/29/20138/29/2013ANR
DetailsTony Young
kevin Phone #: ###-####
(F) Reprint permit  8/28/2013 DONE
DetailsChristina Prado
CHANGE STATUS TO (ISS)  8/28/2013 DONE
DetailsChristina Prado
Routing - Design Review8/23/2013 8/23/2013 PASS
DetailsJosh Wilson
Ok for exterior work per CZC13-00187.
Routing - PLAN CHECK8/23/2013 8/23/2013 PASS
DetailsTim L. Woodard
Plan Modification Accepted  8/23/2013 DONE
DetailsTim L. Woodard
Print Occupancy Form  8/21/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  8/21/2013 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  8/21/2013 DONE
DetailsChristina Prado
Plan assigned to (TLW)8/1/2013 8/15/2013 PASS
DetailsTim L. Woodard
Level 3 TI - Starbucks
Plan resubmittals received  8/15/2013 DONE
DetailsTim L. Woodard
E-Plan
Routing - Design Review8/15/2013 8/15/2013 PASS
DetailsSarah Schafer
Ok for interior work only.
Routing - PLAN CHECK8/15/2013 8/15/2013 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  8/15/2013 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK8/1/2013 8/12/2013 PASS
DetailsTim L. Woodard
Approved with history and redlines on drawings. TLW
1st review completed  8/12/2013 DONE
DetailsTim L. Woodard
Routing - PLUMBING8/1/2013 8/9/2013 PASS
DetailsBill VanDegrift
1) pipe 3 compartment sink waste to floor sink
2) provide R.P. upstream of filter and on water to espresso
Routing - FIRE8/1/20138/1/20138/5/2013 PASS
DetailsScott Arellano
Attached IFC comments to plans.
Routing - Design Review8/1/2013 8/1/2013 PASS
DetailsSarah Schafer
Sarah Schafer - New exterior backlit wood slat covering (See Sheet A-2001 Exterior Elevations)

I will contact the applicant to let them know we will need to have a zoning certificate for this exterior change. I want to review the back lighting.
Routing PW Sewer Rating8/1/2013 8/1/2013 PASS
DetailsConnie Baumgartner
Intake Approval  8/1/2013 PASS
DetailsJason Blais
Prescreen passed by John Menard on 7/31/13. Plan Review Fees paid on 8/1/13.
Pending Assignment by JCB8/1/2013 8/1/2013 DONE
DetailsJason Blais
Routing - Addressing8/1/2013 8/1/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS8/1/2013 8/1/2013 PASS
DetailsConnie Baumgartner
Payment Received  7/31/2013 DONE
Payment received via Govolutions
Intake Approval  7/30/2013 FAIL
DetailsJohn Menard
1. A number of the new revised plan sheets have not been signed and dated by the project design professional.
Please review and have the project architect sign all plan sheets that are not currently signed.
Intake Approval  7/11/2013 FAIL
DetailsJohn Menard
1. A completed submittal checklist is required before a prescreen review can be completed. Please submit a completed tenant improvement submittal checklist. Additional items may be required after a prescreen can be done using the completed checklist.
2. Please complete the Certificate of Value with electrical, plumbing and other associate values broken out.
3. Please submit the information required for Central District Health review.
4. The ComCheck energy compliance sheets to be included on full sized plan sheets, not on 81/2" x 11" sheets.
Application received  7/2/2013 DONE
Application submitted via PDS Online on Jul 2 2013 4:36PM