BLD-Final | 1/15/2015 | 1/15/2015 | 1/15/2015 | A | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 1/15/2015 | 1/15/2015 | 1/15/2015 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 1/14/2015 | 1/15/2015 | 1/15/2015 | A | NH |
Jim Storey
|
|
|
Call to Matt Garner ###-#### approx 30 minutes prior to arrival. Phone #: ###-#### Inspection requested via web by Chris Laraway
|
BLD-Wall cover | 10/25/2013 | 10/25/2013 | 10/25/2013 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Larawayfurn support ok// ok to insulate.
|
BLD-Framing/Rough-in | 10/23/2013 | 10/24/2013 | 10/24/2013 | A | PART |
Jim Storey
|
|
|
Please call 30 min prior to meet on site. All action items have been addressed. Item 2 is completed, Item 1 requires coordination for access to inspect fireplace once installed, Item 3 has been reviewed, and Item 4 for the attic will be batt insulation where the air handler is located for adaquate coverage. Phone #: ###-#### >> Inspection requested via web by Chris Laraway a1 resolve bearing point// nail furn support// batt attic
|
BLD-Framing/Rough-in | 10/17/2013 | 10/18/2013 | 10/18/2013 | A | FAIL |
Jim Storey
|
|
|
Framing, Wall bracing & Energy Inspection. Phone #: ###-#### >> Inspection requested via web by Chris Laraway no fire place permit or insp. / ag web brace/a1 no center bearing point/ b7 thur b8 not designed to carrie furnce ceilling load/ cg to be aproved by house designer or plan review/ 2nd floor ductting can not replace attic r vaule of insulation.
|
BLD-Framing/Rough-in | 10/15/2013 | 10/16/2013 | 10/16/2013 | A | NR |
Jim Storey
|
|
|
Framing, Wall Brace & Energy reay to inpsect for cover. Phone #: ###-#### >> Inspection requested via web by Chris Laraway
|
Plan resubmittals received | | | 10/11/2013 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 10/11/2013 | | 10/11/2013 | | PASS |
Troy James
|
|
|
resubmitted manual j
|
BLD-Foundation | 8/21/2013 | 8/21/2013 | 8/21/2013 | P | PASS |
Jim Storey
|
|
|
chris Phone #: ###-####
|
BLD-Footing | 8/20/2013 | 8/20/2013 | 8/20/2013 | P | PASS |
Jim Storey
|
|
|
|
OVERRIDE | | | 8/20/2013 | | |
|
|
|
|
Plan assigned to (CDM) | 7/29/2013 | 7/29/2013 | 8/20/2013 | | PASS |
Carl D Madsen
|
|
|
ePlan review First review completed
|
Issue PAID IN FULL permit | | | 8/20/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 8/20/2013 | | 8/20/2013 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/20/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/20/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/20/2013 | | DONE |
Christina Prado
|
|
|
|
Routing - MECHANICAL | 8/19/2013 | | 8/19/2013 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 8/16/2013 | | 8/16/2013 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/29/2013 | | 8/12/2013 | | FAIL |
Carl D Madsen
|
|
|
ePlan review
|
1st review completed | | | 8/12/2013 | | FAIL |
|
|
|
|
Routing - Addressing | 7/29/2013 | | 7/30/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Route to Impact Fee Review | 7/29/2013 | 8/1/2013 | 7/29/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PUBLIC WORKS | 7/29/2013 | | 7/29/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - MECHANICAL | 7/29/2013 | | 7/29/2013 | | FAIL |
Troy James
|
|
|
eplan
|
Routing - PLANNING | 7/29/2013 | | 7/29/2013 | | PASS |
Leon Letson
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/29/2013 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/29/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 7/24/2013 | | PASS |
Christina Prado
|
|
|
|
Intake Approval | | | 7/22/2013 | | FAIL |
Barbara Stitt
|
|
|
Wall bracing still not complete per Carl Madsen and all sheets were turned in landscaping format
|
Intake Approval | | | 7/19/2013 | | FAIL |
Tisha Gallop
|
|
|
Still need wall bracing plan requirements
|
Intake Approval | | | 7/5/2013 | | FAIL |
Tisha Gallop
|
|
|
Wall bracing, building section, stair section (minor items: attic access, stamp area on A2 & S2). Wrote detailed message on ePlanReview response in addition to items on Pre-Screen checklist. Told him to call Tisha at permit desk for assistance.
|
Application received | | | 7/3/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 3 2013 12:26PM
|
Intake Approval | | | 7/3/2013 | | FAIL |
Barbara Stitt
|
|
|
Needed to seperate drawing sheets and properly label them, needs wall bracing, needs stair section details
|
Intake Approval | | | 7/3/2013 | | FAIL |
|
|
|
Plans need to be shown in the landscape position & still need stair section
|