Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD13-01782
StatusFinaled
Name ESI
Site Address 800 W MAIN ST Unit: 1500
Project Name8TH & MAIN STE 1500
Customer NumberREF BLD13-01691
ePlanReviewNo
Description
(HOLLAND & HART – 8th & Main Building – Suite # 1500) This building is sprinklered to comply as a high-rise building. Permit is to build out for the first time the entire 16,828 square foot 15th floor (Shell and Core done under BLD12-01991) as offices. Work is to include: [construction of interior none bearing walls to create; 43 offices, 8 open office areas, 4 small storage area, two conference rooms (under 400 sq. ft), a coffee / break room, and two copy/print areas], installation of a new lighting, installation of new plumbing, installation of new mechanical, and new interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. NOTE: Reference ePlanReview case BLD13-01691 for review. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/10/20155/18/2015 DONE
Print Statement  5/18/2015 DONE
DetailsRita DeYoung
Third Notice 2/7/20155/5/2015 DONE
Third Notice 1/11/20152/2/2015 DONE
Third Notice 11/12/201412/1/2014 DONE
Third Notice 9/3/201411/3/2014 DONE
e-mailed to Adam Johnson @ ESI
Third Notice 6/14/20148/29/2014 DONE
e-mailed to Adam Johnson
Third Notice 5/10/20146/9/2014 DONE
e-mailed to Adam Johnson
Third Notice 4/5/20145/5/2014 DONE
e-mailed to Adam Johnson
Second Notice 3/16/20143/31/2014 DONE
First Notice 2/21/20143/6/2014 DONE
FIRE-Final Inspection2/10/20142/11/20142/11/2014APASS
DetailsForrest France
Fire life safety walkthrough passed.
BLD-Final2/10/20142/11/20142/11/2014APASS
DetailsDave Hannah
Final inspection request of H&H 15th Floor. Adam will walk with you for this inspection. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
Application received 7/3/20132/11/2014 DONE
Permanent Occupancy  2/11/2014 DONE
BLD-Conference2/4/20142/5/20142/5/2014APEND
DetailsDave Hannah
Meet and walk H&H floors for egress signage compliance. Contact Adam or Murph. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Ceiling Grid Inspection1/17/20141/21/20141/21/2014PPART
DetailsJim Sly
15th Floor Ceiling Grid inspection, Holland and Hart. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
Install Perimeter only.....OK
BLD-Ceiling Grid Inspection1/7/20141/8/20141/9/2014PPART
DetailsDave Hannah
Ceiling Grid Inspection request Per Murph. PM. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to place bourder tiles in.
Print Occupancy Form  1/9/2014 DONE
DetailsChristina Prado
BLD-Ceiling Grid Inspection12/27/201312/30/201312/31/2013PPART
DetailsDave Hannah
Ceiling inspection, 15th Floor Holland and Hart, requested for PM Monday, by Murph. Thanks, AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson hard lids each side of elevator lobby ok to cover
BLD-Conference11/4/201311/5/201311/5/2013APASS
DetailsDave Hannah
15th Floor Framing inspection, request for cover via Murph. Thanks. Adam ###-####. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in10/24/201310/24/201310/24/2013APART
DetailsDave Hannah
Inspection scheduled via John Woods. Adam is off site this morning, contact John for inspection needs. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson all the rest of the office on the out perm ok to cover
BLD-Framing/Rough-in10/1/201310/1/201310/3/2013PPART
DetailsDave Hannah
H&H Framing Inspection, 15th Floor. Thanks. Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover rooms 1###-#### and 1###-####
BLD-Framing/Rough-in9/20/20139/23/20139/23/2013APART
DetailsDave Hannah
Adam-inspection for the stairway between 16th & 17th floor Phone #: ###-####
BLD-Framing/Rough-in9/5/20139/5/20139/6/2013PPART
DetailsDave Hannah
Dave, Please inspect 15th Floor Perimeter Soffit framing. Thanks. Adam ESI. Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to insulate top of ext walls
Issue PAID IN FULL permit  8/8/2013 DONE
DetailsBarbara Stitt
Print Occupancy Form  8/7/2013 DONE
DetailsBarbara Stitt
Permit Ready to Issue  8/7/2013 DONE
DetailsBarbara Stitt
Routing - FIRE8/1/20138/1/20138/2/2013 PASS
DetailsScott Arellano
Attached Fire Review comments to plans.
PLANS/APPL TAKEN TO FRONT DESK  8/2/2013 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)7/3/2013 8/2/2013 PASS
DetailsTim L. Woodard
1st Review Complete.
Routing - FIRE7/30/20137/30/20137/31/2013 FAIL
DetailsScott Arellano
Emailed resubmittal item to architect. Attached plan review report to case.
Plan resubmittals received  7/30/2013 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK7/30/2013 7/30/2013 PASS
DetailsTim L. Woodard
1st review completed  7/17/2013 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK7/3/2013 7/17/2013 FAIL
DetailsTim L. Woodard
Reference ePlanReview case BLD13-01691 for review.
Routing - PLUMBING7/3/2013 7/11/2013 PASS
DetailsBill VanDegrift
perplans and ISPC
Routing - FIRE7/3/20137/3/20137/9/2013 FAIL
DetailsScott Arellano
Emailed resubmittal item to architect. Attached IFC comments to case.
Routing PW Sewer Rating7/5/2013 7/5/2013 PASS
DetailsBeverly Mountain
Routing - Addressing7/3/2013 7/5/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS7/3/2013 7/5/2013 PASS
DetailsBeverly Mountain
Intake Approval  7/2/2013 PASS
DetailsJason Blais
Prescreen passed by Tim Woodard and plan review fees paid on 7/1/13. Received applications on 7/2/13.