Permit NumberBLD13-01792
StatusFinaled
Name STEED CONSTRUCTION
Site Address 601 W GOWEN RD
Project NameWPS Warehouse Expansion
Customer Number 
ePlanReviewYes
Description
Western Power Sports - Warehouse Addition - To construct a new 60,000 square foot insulated tilt-up concrete warehouse addition to the south end of the existing building. The new addition will connect with an existing metal building to the west attaching it to main builidng and creating one structure of 247,870 sq. ft. The south exterior wall of the existing metal building will be removed. An ESFR sprinkler system and suspended ceiling for in rack storage including tires will be installed. New accessible restrooms are also being construction at a portion of the existing warehouse, south of the wall at grid line D. This permit also includes related site improvements. This building is fully fire sprinklered. The sprinklers are used for area increase. This is an unlimited area building. All construction per the approved plans and attached comment list.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 11/13/201411/12/2014 DONE
This permit finaled on the web by Scott Raymes
First Notice 10/27/201411/3/2014 DONE
Permanent Occupancy  10/17/2014 DONE
DetailsChristina Prado
BLD-Final10/15/201410/16/201410/16/2014APASS
DetailsJim Storey
Odie Phone #: ###-####
PubWorks Occupancy Approval9/18/20149/18/20149/18/2014 PASS
DetailsBrian Murphy
Brian Murphy approves Occupancy
Zoning Approval9/18/20149/18/20149/18/2014 PASS
DetailsJosh Wilson
BLD-Final9/16/20149/17/20149/17/2014ANR
DetailsJim Storey
Odie Phone #: ###-####
FIRE-Final Inspection9/15/20149/16/20149/16/2014PPASS
DetailsForrest France
Noted correction items finished. Fire life safety final approved.
FIRE-Final Inspection9/3/20149/4/20149/4/2014APART
DetailsForrest France
EM light and exit sign repairs completed per contractor.
FIRE-Final Inspection8/12/20148/15/20148/19/2014APART
DetailsForrest France
Odie Phone #: ###-####-please give as much notice as possible so he can meet Phone #: ###-####
FIRE-Final Inspection8/12/20148/15/20148/19/2014APART
DetailsForrest France
Odie Phone #: ###-####-please give as much notice as possible so he can meet Phone #: ###-####
FIRE-Final Inspection7/7/20147/8/20147/8/2014PPART
DetailsForrest France
Intended for an on site conference regarding exit sign locations at the new racking area.
BLD-Framing/Rough-in4/14/20144/14/20144/14/2014PPASS
DetailsJim Storey
Odie-also breeze-way Phone #: ###-#### pending others. ok
BLD-Ceiling Grid Inspection4/14/20144/14/20144/14/2014PPASS
DetailsJim Storey
Odie Phone #: ###-####
BLD-Framing/Rough-in12/30/201312/30/201312/30/2013PPASS
DetailsJim Storey
odie Phone #: ###-#### roof deck and parapet ok insulation ok
Print Occupancy Form  8/29/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  8/29/2013 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  8/29/2013 DONE
DetailsChristina Prado
Routing Off Site - STRUCTURAL8/26/2013 8/27/2013 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  8/27/2013 DONE
DetailsJohn Menard
Plan assigned to (JCM)7/15/2013 8/27/2013 PASS
DetailsJohn Menard
1st Review completed 08/06/2013 JCM
Routing Off Site - STRUCTURAL8/12/2013 8/15/2013 FAIL
DetailsJohn Menard
Routing - PLAN CHECK8/12/2013 8/14/2013 PASS
DetailsJohn Menard
Routing - FIRE8/12/2013 8/13/2013 PASS
DetailsScott Arellano
Attached IFC comments to plans.
Plan Reviewer's activity  8/12/2013 PASS
DetailsJohn Menard
Reviewed and approved requested revisions. JCM
1st review completed  8/6/2013 DONE
DetailsJohn Menard
Routing - PLAN CHECK7/15/2013 8/6/2013 FAIL
DetailsJohn Menard
Routing - PUBLIC WORKS7/15/2013 7/23/2013 PASS
DetailsConnie Baumgartner
Routing PW Sewer Design7/15/2013 7/23/2013 PASS
DetailsKyle S. Rosenmeyer
No Comment.
Routing - FIRE7/15/20137/15/20137/19/2013 FAIL
DetailsScott Arellano
Emailed resubmittal item to architect. Attached Fire Comments to case.
Routing - PLUMBING7/15/2013 7/18/2013 PASS
DetailsDaryl Spivey
Tempered water required on lavs.
Routing Off Site - STRUCTURAL7/15/2013 7/17/2013 FAIL
DetailsJohn Menard
Route to Impact Fee Review7/15/2013 7/17/2013 PASS
DetailsCindy M. Gould
Routing - Design Review7/15/2013 7/17/2013 PASS
DetailsJosh Wilson
Ok per DRH13-00153
Routing - Erosion and Sediment7/15/2013 7/15/2013 PASS
DetailsKimberly M. Johnson
See also ESC13-01793 for rough grading and site development
Routing PW Sewer Rating7/15/2013 7/15/2013 PASS
DetailsConnie Baumgartner
Routing PW Environmental7/15/2013 7/15/2013 PASS
DetailsWalt Baumgartner
Routing - PLANNING Land Div7/15/2013 7/15/2013 PASS
DetailsDave Abo
Routing - Addressing7/15/2013 7/15/2013 PASS
DetailsJason C. Taylor
Pending Assignment by JCM7/15/2013 7/15/2013 DONE
DetailsJohn Menard
Payment Received  7/11/2013 DONE
Payment received via Govolutions
Intake Approval  7/11/2013 PASS
OK to submitt for permit
Application received  7/7/2013 DONE
Application submitted via PDS Online on Jul 7 2013 11:59AM