BLD-Blower Door Test Results | 4/2/2014 | 4/2/2014 | 4/2/2014 | A | PASS |
Dave Hannah
|
|
|
3.3
|
BLD-Final | 4/1/2014 | 4/2/2014 | 4/2/2014 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 4/2/2014 | 4/2/2014 | 4/2/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 1/15/2014 | 1/17/2014 | 1/17/2014 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 1/15/2014 | 1/16/2014 | 1/16/2014 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 12/23/2013 | 12/23/2013 | 12/23/2013 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-####
|
BLD-Foundation | 12/3/2013 | 12/3/2013 | 12/4/2013 | P | PASS |
Dave Hannah
|
|
|
Ready around 4 - Anton Phone #: ###-####
|
BLD-Footing | 12/2/2013 | 12/2/2013 | 12/2/2013 | P | PASS |
Dave Hannah
|
|
|
Wes Phone #: ###-####
|
OVERRIDE | | | 10/30/2013 | | |
|
|
|
|
Plan assigned to (AJS) | | 10/29/2013 | 10/30/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - MECHANICAL | | | 10/30/2013 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 10/30/2013 | | 10/30/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 10/30/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Inspection Record Card- Bld | | | 10/30/2013 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 10/30/2013 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/30/2013 | | DONE |
|
|
|
|
Routing - PLANNING | 10/29/2013 | | 10/29/2013 | | PASS |
Leon Letson
|
|
|
|
Plan Modification Accepted | | | 10/29/2013 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets, reduced site plan, manual J and Rescheck;taken to Adele for routing
|
Issue PAID IN FULL permit | | | 9/27/2013 | | DONE |
Barbara Stitt
|
|
|
|
OVERRIDE | | | 7/23/2013 | | |
|
|
|
|
Telephone call | | | 7/23/2013 | | DONE |
Barbara Stitt
|
|
|
Called and left voice message that pemit is ready and fees due on 7-23-13 @ 3:45pm//BAS
|
Inspection Record Card- Bld | | | 7/23/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 7/23/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (AJS) | | 7/8/2013 | 7/22/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1 st review completed Due7/19
|
Plan resubmittals received | | | 7/22/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/22/2013 | | 7/22/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 7/22/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/22/2013 | | DONE |
|
|
|
|
1st review completed | | | 7/16/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 7/11/2013 | | 7/16/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
emailed comments to Leonard 7/16/13
Leonard,
I have completed the building plan review for BLD13-01801, 3103 Hickory Way.
Please provide the stamped engineering calculations for the engineered lateral analysis. The balloon framed portion shown on the wall bracing exceeds prescriptive design.
Please provide the beam/ angled post calculations for this project.
Thank you
Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####
|
Routing - MECHANICAL | | | 7/11/2013 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 7/8/2013 | 7/11/2013 | 7/10/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 7/9/2013 | | 7/9/2013 | | PASS |
Leon Letson
|
|
|
|
Routing - Addressing | 7/8/2013 | | 7/9/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | | | 7/9/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/8/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 7/8/2013 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/8/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | 7/8/2013 | | | |
|
|
|
|