Permit Information
Permit NumberBLD13-01804
StatusFinaled
Name AMYX SIGNATURE HOMES
Site Address 13999 W WAINWRIGHT DR
Project NameApline Pointe, Building #4
Customer Number 
ePlanReviewYes
Description
(ALPINE POINT, BUILDING #4) Plan modification for minor floorplan alterations 1-14-13 CDM. Permit for the construction of a new 4,660 sq. ft. office building on an existing foundation (BLD05-03488). Work to include the construction of interior walls for office areas, conference rooms and accessible restrooms. There are common core restrooms, drinking fountains and a breakroom. The current configuration allows exiting from the the common area through an unoccupoed space. As tenants occupy the separate tenant spaces a common exit corridor is required to be maintained if the empty tenant space is occupied and the common exit path is bloced a new common exit path from the common area will be required. A separate exit is required from the common area which does not require an occupant to back through their own space or through anonther tenant space. This building is not fire sprinklered. All work per the approved plans. No occupancy is allowed under this permit a separate building permit will be required for occupancy. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/5/20144/2/2014 DONE
DetailsChristina Prado
completed 4-2-14
Second Notice 3/10/20143/31/2014 DONE
DetailsChristina Prado
mailed 4-1-14
First Notice2/21/20142/21/20142/28/2014 DONE
DetailsJim Sly
mailed 2-28-14
BLD-Final2/20/20142/21/20142/21/2014APASS
DetailsJim Sly
troy Phone #: ###-####
DOC - Permit Finaled2/21/20142/21/20142/21/2014PPASS
DetailsJim Sly
FIRE-Final Inspection2/12/20142/12/20142/12/2014PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Conference2/4/20142/5/20142/5/2014ADONE
DetailsTroy Cobbley
Troy and I went over fire extinguisher placement.
FIRE-Conference2/3/20142/4/20142/4/2014ADEFR
DetailsForrest France
CHANGE STATUS TO (ISS)  2/3/2014 DONE
DetailsTisha Gallop
paid plan mod fees
Plan assigned to (CDM)1/10/2014 1/14/2014 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK1/10/2014 1/14/2014 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  1/14/2014 DONE
Plan Modification Accepted  1/9/2014 DONE
DetailsTisha Gallop
plan mod workflow started to modify floor plan in tenant space #3.
BLD-Energy code compliance12/12/201312/13/201312/13/2013APASS
DetailsJim Sly
troy Phone #: ###-####
BLD-Framing/Rough-in12/9/201312/10/201312/10/2013PPASS
DetailsJim Sly
troy please call for access Phone #: ###-####
BLD-Wall Bracing11/7/201311/8/201311/8/2013PPASS
DetailsJim Sly
todd Phone #: ###-####
Issue PAID IN FULL permit  10/11/2013 DONE
DetailsChristina Prado
Inspection Record Card- Bld  10/11/2013 DONE
DetailsChristina Prado
OVERRIDE  10/10/2013  
Permit Ready to Issue  10/10/2013 DONE
DetailsTisha Gallop
Plan assigned to (CDM)7/18/20137/18/20139/26/2013 PASS
DetailsCarl D Madsen
First review completed
Routing PW Street Lights7/16/2013 9/26/2013 PASS
DetailsMike D Hedge
Signed of per Eplan
Routing PW Solid Waste7/16/2013 9/26/2013 PASS
DetailsPeter J. McCullough
signed of per Eplan
Routing - PLAN CHECK9/26/2013 9/26/2013 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  9/26/2013 DONE
Routing Off Site - STRUCTURAL9/12/2013 9/25/2013 PASS
DetailsCarl D Madsen
Routing - Erosion and Sediment9/13/2013 9/13/2013 PASS
DetailsJason C. Taylor
Waiver approved. Jason Taylor ###-####
1st review completed  8/19/2013 DONE
Routing - PLAN CHECK7/16/2013 8/19/2013 FAIL
DetailsJohn Menard
Routing PW Drainage7/16/2013 7/23/2013 PASS
DetailsBrian Murphy
Routing Off Site - STRUCTURAL7/16/2013 7/22/2013 FAIL
DetailsJohn Menard
Routing - PLUMBING7/16/2013 7/22/2013 PASS
DetailsDaryl Spivey
Provide tempered water to lavs.
Routing - FIRE7/16/20137/16/20137/18/2013 PASS
DetailsScott Arellano
Attached Fire Comments to plans.
Routing - Addressing7/16/2013 7/17/2013 PASS
DetailsJason C. Taylor
Route to Impact Fee Review7/16/2013 7/17/2013 PASS
DetailsCindy M. Gould
Routing PW Sewer Design7/16/2013 7/17/2013 PASS
DetailsMike Sheppard
Payment Received  7/16/2013 DONE
Payment received via Govolutions
Pending Assignment by JCM7/16/2013 7/16/2013 DONE
DetailsJohn Menard
Routing - Design Review7/16/2013 7/16/2013 PASS
DetailsSarah Schafer
Approved under DRH05-00197. Four buildings were approved as part of this DRH. This is the last of the four to be constructed.
Routing - PUBLIC WORKS7/16/2013 7/16/2013 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment7/16/2013 7/16/2013 FAIL
DetailsKimberly M. Johnson
waiver request denied. Please submit Erosion Control Plan.
Routing - PLANNING Land Div7/16/2013 7/16/2013 PASS
DetailsDave Abo
Lot 6, Block 2 of the Zebulon Heights Subdivision.
Routing PW Sewer Rating7/16/2013 7/16/2013 PASS
DetailsConnie Baumgartner
Intake Approval  7/10/2013 FAIL
DetailsTim L. Woodard
Jeff,

Please address all items noted with an arrow in the attached checklist. Drainage and ESC requirements need to be provided or verification these items are not required. You may ask Kim Johnson for an email to negate ESC requirements and Brian Murphy for an email to negate Drainage requirements.

Kimberley M. Johnson KMJohnson@cityofboise.org
Brian Murphy BMURPHY@cityofboise.org

Best regards,

Tim Woodard
Plans Examiner II / City of Boise
###-####
twoodard@cityofboise.org

Application received  7/8/2013 DONE
Application submitted via PDS Online on Jul 8 2013 9:53AM