Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-01805
StatusFinaled
Name ARMADA HOMES
Site Address 1110 E INSIGNIA DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 3080 sq. ft., two story (first story 1412 sq. ft.)., (second story 1668 sq. ft.) single family dwelling with 3 bedrooms, and (2) 1/2 baths, approximately 192 sq. ft. of covered patio/porch and a 588 sq. ft. garage per the approved plans, res check, attached foundation engineering, plan review report and any notations. R-2D zoning and setbacks per planning. AJS A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/28/20145/28/20145/28/2014PPASS
DetailsJim Storey
Kelly Phone #: ###-####
DOC - Permit Finaled5/28/20145/28/20145/28/2014PPASS
DetailsJim Storey
PubWorks Subgrade Approval5/16/20145/16/20145/16/2014 DONE
DetailsJason C. Taylor
letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Energy code compliance10/30/201310/30/201310/30/2013PPASS
DetailsJim Storey
Kelly Phone #: ###-####
BLD-Framing/Rough-in10/28/201310/28/201310/28/2013PPASS
DetailsJim Storey
Mark Phone #: ###-####
BLD-Framing/Rough-in10/22/201310/22/201310/22/2013PNR
DetailsJim Storey
Mark Phone #: ###-####
BLD-Framing/Rough-in10/21/201310/21/201310/21/2013PNR
DetailsJim Storey
Mark Phone #: ###-#### hvac c/n
Plan resubmittals received  10/11/2013 DONE
new manual j
Routing - MECHANICAL10/11/2013 10/11/2013 PASS
DetailsTroy James
resubmitted manual j
BLD-Wall Bracing10/9/201310/9/201310/9/2013PPASS
DetailsJim Storey
mark Phone #: ###-####
BLD-Foundation9/11/20139/12/20139/12/2013PPASS
DetailsJim Storey
adam Phone #: ###-####
BLD-Footing9/11/20139/11/20139/11/2013PPASS
DetailsJim Storey
adam Phone #: ###-####
PubWorks Subgrade Approval9/3/20139/3/20139/3/2013 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.

Issue PAID IN FULL permit  8/9/2013 DONE
Plan assigned to (AJS)7/8/20137/8/20138/8/2013 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Hillside Due 7/25
Plan resubmittals received  8/8/2013 DONE
DetailsTisha Gallop
received two coipes of ResCheck; taken to Adele.
Routing - PLAN CHECK8/8/2013 8/8/2013 PASS
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  8/8/2013 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  8/8/2013 DONE
Inspection Record Card- Bld  8/8/2013 DONE
DetailsChristina Prado
Permit Ready to Issue  8/8/2013 DONE
DetailsBarbara Stitt
Telephone call  8/8/2013 DONE
DetailsBarbara Stitt
Called Kelly and told him that permit is ready & fees due on 8-8-13 @ 3:05pm//BAS
Routing - Erosion and Sediment8/6/2013 8/7/2013 PASS
DetailsKimberly M. Johnson
approved with redlines
Routing - PLAN CHECK8/6/2013 8/6/2013 FAIL
DetailsAdele J Schaffeld-Griffin
email sent to Kelly 8/6/13

Kelly,

I have completed the 2nd plan review for BLD13-01805.


Thank you for submitting the Res Check for review. The building orientation show the front of the building faces 90 degrees from North. The site plan shows the front of the home facing South. Please revise the orientation to 180 degrees from North.



Please note that this permit has not passed in Erosion and Sediment.

Please contact Kim at ###-#### for ESC.

Please submit 2 copies of res check along with any other documents required by the other departments.

Please contact me if you have any questions.

Thank you

Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####

Plan resubmittals received  8/6/2013 DONE
DetailsTisha Gallop
received two copies of ESC narrative and plans; taken to Adele.
Routing - Erosion and Sediment7/30/2013 7/30/2013 FAIL
DetailsKimberly M. Johnson
No ESC resubmittal was included. Email correspondance on 7/30 to notifiy engineer.
Routing PW Grading-Hillside7/30/2013 7/30/2013 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Plan resubmittals received  7/30/2013  
received REScheck for this permit I put it with the plans/dld
Routing - PLAN CHECK7/17/2013 7/24/2013 FAIL
DetailsAdele J Schaffeld-Griffin
need res check, emailed applicant 7/24/13

I have completed the plan review for BLD13-01805.

The res check was not included in the packet. Please submit res check for review.

Please note that this permit failed in Erosion and Sediment and in Grading.

Please contact Kim at ###-#### for ESC and Jason at ###-#### for Grading.

Please submit 2 copies of res check along with any other documents required by the other departments.

Please contact me if you have any questions.

Thank you

Adele J. Schaffeld-Griffin
City of Boise
Plans Examiner II
###-####

1st review completed  7/24/2013 FAIL
DetailsAdele J Schaffeld-Griffin
Plan resubmittals received  7/24/2013 DONE
DetailsTisha Gallop
received response from engineer and three copies of plan sheet C1.0; taken to Adele.
Routing - FIRE  7/17/2013 PASS
DetailsScott Arellano
No comments.
Routing - MECHANICAL  7/11/2013 PASS
no rescheck to review for compliance
Routing - Erosion and Sediment7/11/2013 7/11/2013 FAIL
DetailsKimberly M. Johnson
Need ESC Narrative and map needs updated with BMPs
Route to Impact Fee Review7/8/20137/11/20137/10/2013 PASS
DetailsCindy M. Gould
Routing - Addressing7/8/2013 7/9/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS  7/9/2013 PASS
DetailsConnie Baumgartner
Routing - PLANNING7/9/2013 7/9/2013 PASS
DetailsLeon Letson
Routing PW Grading-Hillside7/9/2013 7/9/2013 FAIL
DetailsJason C. Taylor
Grading plan needs revised to add conveyence swales to east and west sideyards. Jason Taylor ###-####
Plans ACCEPTED BY PLAN TECH  7/8/2013  
7-8-13 ok per Jason Taylor to take in
Intake Approval  7/8/2013 PASS
Application received 7/8/2013