Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-01819
StatusExpired
Name AQUATECH POOLS BY CHI
Site Address 3672 E ALTA RIDGE WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To place a new 760s.f. inground gunite swimming pool with Chlorine dissinfection and a cartridge filter. R-1C setbacks approved by Leon Letson.A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Separate electrical permit is required and bonding of all metal parts is required to be approved by the electrical division prior to approval for placement of any concrete by the structural division.
If you have any questions call Jason at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired5/9/20195/9/20195/9/2019PPASS
DetailsJim Storey
ncfi
BLD-Final10/28/201310/29/201310/29/2013AFAIL
DetailsJim Storey
shawnda Phone #: ###-#### gate latch min 54 from bottom of gate/ self colsing on both access gates// barrior must be around yard to pervent access to outsid pool.
PubWorks Subgrade Approval8/2/20138/2/20138/2/2013 DONE
DetailsJason C. Taylor
*RETAINING WALL* Recieved structural engineers approval for the retaining walls in the rear adjacent tot he swimming pool. Wall were built over 4' and closer than 10' of separation. Letter has been submitted to OnBase. Jason Taylor ###-####
BLD-Foundation7/19/20137/22/20137/22/2013PPASS
DetailsJim Storey
rebar - shawnda Phone #: ###-####
PubWorks Subgrade Approval7/12/20137/12/20137/12/2013 DONE
DetailsJason C. Taylor
Recieved subgrade approval from geotechnical engineer (MTI) for entire pool. Building department may be scheduled for inspections. Jason Taylor ###-####.
OVERRIDE  7/8/2013  
Routing Walk-In (PW Hillside)7/8/20137/8/20137/8/2013PDONE
DetailsJason C. Taylor
Subgrade inspection will be required prior to scheduling footing inspections. Jason Taylor ###-####.
Routing Walk-In (Zoning)7/8/20137/8/20137/8/2013PPASS
DetailsLeon Letson
Routing Walk-In (BLD)7/8/20137/8/20137/8/2013PDONE
DetailsPerry Paine
Plan assigned to (PEP)7/8/20137/8/20137/8/2013 PASS
DetailsPerry Paine
1st review completed  7/8/2013 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/8/2013 DONE
Permit Ready to Issue  7/8/2013 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  7/8/2013  
Issue PAID IN FULL permit  7/8/2013 DONE
DetailsTisha Gallop
Application received 7/8/2013