Second Notice | | 3/13/2015 | 3/12/2015 | | DONE |
|
|
|
This permit finaled on the web by Robert Faull
|
First Notice | | 3/2/2015 | 3/3/2015 | | DONE |
|
|
|
mailed 3-3-15
|
Permanent Occupancy | | | 2/20/2015 | | DONE |
Christina Prado
|
|
|
|
BLD-Conference | 2/19/2015 | 2/19/2015 | 2/19/2015 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | PASS |
Mike Jordan
|
|
|
Paul Phone #: ###-####. ok for perm occ.
No Mechanical needed per MIke Jordan///cdp
|
BLD-Conference | 2/13/2015 | 2/13/2015 | 2/13/2015 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 2/9/2015 | 2/9/2015 | 2/9/2015 | P | NR |
Mike Jordan
|
|
|
Paul Phone #: ###-####. Needs special inspection on bolting and final letter from special inspection agency. Also needs plumbing final.
|
FIRE-Final Inspection | 2/9/2015 | 2/9/2015 | 2/9/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Roadway surface has been approved.
|
FIRE-Final Inspection | 2/5/2015 | 2/5/2015 | 2/6/2015 | P | CANC |
Troy Cobbley
|
|
|
Paul and Scott are working out the details of the fire dept access still.
|
Additional plans submitted | | | 2/6/2015 | | DONE |
Scott Arellano
|
|
|
Recieved revised plan sheet C1.0 indicating recycled asphalt mix for the FD access roadway. Additional pictures also provided.
|
Telephone call | | | 2/5/2015 | | DONE |
Scott Arellano
|
|
|
Spoke with Paul Warner regarding the recycled asphalt roadway. Informed Paul that a revised plan will need to be submitted to the Building Department which accurately reflects the constructed roadway.
|
PubWorks Occupancy Approval | 2/3/2015 | 2/3/2015 | 2/3/2015 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Sprinkler Rough-in | 1/30/2015 | 1/30/2015 | 1/30/2015 | P | FAIL |
Troy Cobbley
|
|
|
Provide approval from plan review for the road surface change, remove thumbturn dead bolts and provide annual inspection tag for fire extinguishers.
|
BLD-Final | 1/23/2015 | 1/26/2015 | 1/26/2015 | A | NR |
Mike Jordan
|
|
|
Paul ###-####. Needs plumbing and fire/life/afety finals. Contacte and spoke to paul regaurding open perkits.
|
BLD-Framing/Rough-in | 3/24/2014 | 3/25/2014 | 3/25/2014 | A | NR |
Tom Arcoraci
|
|
|
paul Phone #: ###-#### per plan
|
BLD-Foundation | 1/27/2014 | 1/28/2014 | 1/28/2014 | A | PASS |
Tom Arcoraci
|
|
|
Paul Phone #: ###-####
|
BLD-Foundation | 1/21/2014 | 1/23/2014 | 1/23/2014 | A | PASS |
Tom Arcoraci
|
|
|
paul Phone #: ###-####
|
OVERRIDE | | | 11/6/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/6/2013 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 11/6/2013 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 11/6/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing PW Drainage | 9/16/2013 | | 9/17/2013 | | PASS |
Brian Murphy
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/17/2013 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 7/10/2013 | | 9/17/2013 | | PASS |
John Menard
|
|
|
1st Review Complete 7/30/2013 JCM
|
Routing Off Site - STRUCTURAL | 9/10/2013 | | 9/16/2013 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 9/10/2013 | | 9/16/2013 | | PASS |
John Menard
|
|
|
|
Routing PW Drainage | 9/10/2013 | | 9/11/2013 | | FAIL |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 9/10/2013 | | 9/10/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLAN CHECK | 8/6/2013 | | 8/14/2013 | | PASS |
John Menard
|
|
|
|
Routing - FIRE | 8/6/2013 | | 8/13/2013 | | PASS |
Scott Arellano
|
|
|
Attached Fire Code review comments to plans.
|
Routing Off Site - STRUCTURAL | 8/6/2013 | | 8/13/2013 | | FAIL |
John Menard
|
|
|
|
Routing - PLUMBING | 8/6/2013 | | 8/7/2013 | | PASS |
Daryl Spivey
|
|
|
Provide a DCVA on water service upstream of any fixtures.
|
Routing - PUBLIC WORKS | 8/6/2013 | | 8/6/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 8/6/2013 | | 8/6/2013 | | FAIL |
Brian Murphy
|
|
|
|
1st review completed | | | 8/1/2013 | | DONE |
John Menard
|
|
|
|
Routing - PLAN CHECK | 7/10/2013 | | 7/30/2013 | | PASS |
John Menard
|
|
|
|
Routing PW Solid Waste | 7/30/2013 | | 7/30/2013 | | PASS |
Peter J. McCullough
|
|
|
No chages to solid waste approved or noted on plans.
|
Routing - PLUMBING | 7/10/2013 | | 7/29/2013 | | FAIL |
Bill VanDegrift
|
|
|
|
Routing Off Site - STRUCTURAL | 7/10/2013 | | 7/23/2013 | | FAIL |
John Menard
|
|
|
|
Routing PW Drainage | 7/15/2013 | | 7/22/2013 | | FAIL |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 7/15/2013 | | 7/16/2013 | | PASS |
Mike D Hedge
|
|
|
|
Routing - FIRE | 7/10/2013 | 7/10/2013 | 7/15/2013 | | FAIL |
Scott Arellano
|
|
|
Emailed architect resubmittal items.
|
Routing PW Sewer Rating | 7/15/2013 | | 7/15/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 7/15/2013 | | 7/15/2013 | | PASS |
Walt Baumgartner
|
|
|
Future connection to sewer of uncovered equipment washpad prohibited.
|
Routing - PUBLIC WORKS | 7/10/2013 | | 7/15/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Design Review | 7/10/2013 | | 7/12/2013 | | PASS |
Josh Wilson
|
|
|
|
Routing - Addressing | 7/10/2013 | | 7/11/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Route to Impact Fee Review | 7/10/2013 | | 7/11/2013 | | PASS |
Cindy M. Gould
|
|
|
|
Payment Received | | | 7/10/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Pending Assignment by JCM | 7/10/2013 | | 7/10/2013 | | DONE |
John Menard
|
|
|
|
Routing - PLANNING Land Div | 7/10/2013 | | 7/10/2013 | | PASS |
Dave Abo
|
|
|
Parcel over 5 acres in size.
|
Routing - Erosion and Sediment | 7/10/2013 | | 7/10/2013 | | PASS |
Kimberly M. Johnson
|
|
|
|
Application received | | | 7/8/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 8 2013 4:24PM
|