Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD13-01845
StatusFinaled
Name ESI
Site Address 7031 S EISENMAN RD
Project NamePowerbar - Mezzanine
Customer Number 
ePlanReviewYes
Description
(POWER BAR – Mechanical Mezzanine) Permit is to add a 3,557 square foot elevated mechanical mezzanine above an existing work area within a 187,820 square foot building. This building is fully fire sprinklered for area increase. Approval contingent upon adhering to the approved plans on file and plan review report. Work to include: [installation of interior bearing walls to support new mezzanine], construction of a new equipment platform for new HVAC unit, [installation of interior non-bearing walls to create a new work area separate from the main large work area floor], new light switching, installation of new stairways to serve mezzanines, new mechanical, new electrical, and finishes in compliance with chapter 8 of the 2009 IBC. Note: this platform is connected to and serviced off of adjacent mezzanine added under BLD12-01448. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice12/6/201312/6/201312/30/2013 DONE
DetailsBarbara Stitt
Faxed 12-30-13
BLD-Final12/5/201312/6/201312/6/2013APASS
DetailsJim Storey
Jim, call me when you get here, will meet you with Wade up front, everyone is signed off. Phone #: ###-#### >> Inspection requested via web by Miles Hash
DOC - Permit Finaled12/6/201312/6/201312/6/2013PPASS
DetailsJim Storey
FIRE-Final Inspection11/26/201311/27/201311/29/2013PPASS
DetailsForrest France
Fire life safety inspection completed satisfactory.
BLD-Framing/Rough-in9/16/20139/17/20139/17/2013APASS
DetailsJim Storey
call me Jim and I will meet you at the front desk Phone #: ###-#### >> Inspection requested via web by Miles Hash
BLD-Framing/Rough-in8/23/20138/26/20138/26/2013APART
DetailsJim Storey
call and I will met you at the front office for sign-in and escort, maybe some power bars when you are done. thanks Jim it''s Miles long time no see. Phone #: ###-#### >> Inspection requested via web by Miles Hash
rfi as to double door header for gyp support. ok to cover pending responce from arch.
Inspection Record Card- Bld  8/21/2013 DONE
DetailsBarbara Stitt
Permit Ready to Issue  8/20/2013 DONE
Issue PAID IN FULL permit  8/20/2013  
(F) Reprint permit  8/20/2013 DONE
Routing - FIRE8/13/2013 8/15/2013 PASS
DetailsScott Arellano
Attached Fire Code comments to plans.
PLANS/APPL TAKEN TO FRONT DESK  8/15/2013 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)7/12/2013 8/15/2013 PASS
DetailsTim L. Woodard
Level 3 TI - Powerbar
Routing - PLAN CHECK8/13/2013 8/13/2013 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK7/12/2013 8/7/2013 FAIL
DetailsTim L. Woodard
Refer to change mark on drawings. TLW
Routing - PLUMBING7/12/2013 8/7/2013 PASS
DetailsBill VanDegrift
Approved in e-plan review. TLW
Routing - Erosion and Sediment7/12/2013 8/7/2013 PASS
DetailsKimberly M. Johnson
ESC permit needed for new underslab plumbing work? No permit required

Kim added notes and signed off in E-plan that no ESC is required. TLW
1st review completed  8/7/2013 DONE
DetailsTim L. Woodard
Routing - FIRE7/12/20137/12/20137/16/2013 FAIL
DetailsScott Arellano
Emailed resubmittal item to architect. Attached plan review report to case.
Routing PW Environmental7/15/2013 7/16/2013 PASS
DetailsWalt Baumgartner
New "work area" indicates two new floor sinks, facility subject to pretreatment inspection
Routing - Design Review7/12/2013 7/15/2013 PASS
DetailsSarah Schafer
Sarah Schafer - Exterior door change - I have signed off on the exterior door change as part of the building permit application.
Routing PW Sewer Rating7/15/2013 7/15/2013 PASS
DetailsConnie Baumgartner
Routing - Addressing7/12/2013 7/15/2013 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS7/12/2013 7/15/2013 PASS
DetailsConnie Baumgartner
Intake Approval  7/12/2013 PASS
DetailsJason Blais
Prescreen passed by Adele Schaffeld-Griffin on 7/11/13 and Plan Review Fees paid on 7/12/13.
Pending Assignment by JCB7/12/2013 7/12/2013 DONE
DetailsJason Blais
Plan Reviewer's activity  7/11/2013 DONE
DetailsAdele J Schaffeld-Griffin
Spoke with Tim and called Rebecca to let her know we woudl accept the pre screen but this project would be routed as a mojor. I will let Jason know when it comes though for routing.
Application received  7/10/2013 DONE
Application submitted via PDS Online on Jul 10 2013 7:46AM