BLD-Final | 7/24/2013 | 7/26/2013 | 7/26/2013 | P | PASS |
Tom Arcoraci
|
|
|
Brianna Phone #: ###-####
|
BLD-Final | 7/26/2013 | 7/26/2013 | 7/26/2013 | P | PASS |
Tom Arcoraci
|
|
|
Brianna Phone #: ###-####
|
FIRE-Final Inspection | 7/24/2013 | 7/26/2013 | 7/26/2013 | A | PASS |
Forrest France
|
|
|
Noted correction items finished. Life safety finaled.
|
Permanent Occupancy | | | 7/26/2013 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 7/24/2013 | 7/25/2013 | 7/24/2013 | A | FAIL |
Troy Cobbley
|
|
|
Provide floor plan that matches actual wall layout. Also plan review has marked one door as an exit but the door has been blocked with the hardware removed. Repair emergency lights as marked. Remove deadbolt from exit door as marked on the plans.
|
Telephone call | | | 7/24/2013 | | DONE |
Christina Prado
|
|
|
called Briana to advise permit is ready for pick up and gave fees due
|
Permit Ready to Issue | | | 7/24/2013 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 7/24/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 7/24/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | 7/11/2013 | 7/11/2013 | 7/23/2013 | | PASS |
Carl D Madsen
|
|
|
First review completed. CDM
|
Routing - PLAN CHECK | 7/23/2013 | | 7/23/2013 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/23/2013 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/12/2013 | | 7/17/2013 | | FAIL |
Carl D Madsen
|
|
|
Applicant need to provide room ussage designations and meeting room ussage and typical occupant load for the meeting rooms. Called and spoke with Brianna and requested the additional information. 7-17-13 CDM
|
1st review completed | | | 7/17/2013 | | FAIL |
|
|
|
|
Application received | | 7/12/2013 | 7/12/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/11/2013 | | DONE |
Tisha Gallop
|
|
|
|
First Notice | | 8/5/2013 | | | |
|
|
|
|