First Notice | 12/5/2013 | 12/5/2013 | 12/24/2013 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 12/5/2013 | 12/5/2013 | 12/5/2013 | P | PASS |
Jim Storey
|
|
|
ron Phone #: ###-#### it permit bld13-02885
|
DOC - Permit Finaled | 12/5/2013 | 12/5/2013 | 12/5/2013 | P | PASS |
Jim Storey
|
|
|
it permit bld13-02885
|
BLD-Final | 10/14/2013 | 10/15/2013 | 10/15/2013 | P | PEND |
Mike Jordan
|
|
|
Eric Phone #: ###-####. Thiis tenant space is currently occupied and needs to get a cert. of occupancy.
|
FIRE-Final Inspection | 10/14/2013 | 10/15/2013 | 10/15/2013 | A | PASS |
Troy Cobbley
|
|
|
LIfe safety passed. Trent with BRS Architects is going to work with the tenant to get an occupancy permit
|
Inspection Record Card- Bld | | | 9/30/2013 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 9/30/2013 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Final Inspection | 9/17/2013 | 9/17/2013 | 9/17/2013 | P | FAIL |
Troy Cobbley
|
|
|
Provide annual inspection for the fire extinguishers, reverse the hardware to the reception door or provide passage hardware, meet with plan reviewer to resolve island restroom exiting and provide occupancy permit for the tenant occupying the tenant space.
|
BLD-Framing/Rough-in | 9/9/2013 | 9/9/2013 | 9/9/2013 | P | PASS |
Mike Jordan
|
|
|
eric Phone #: ###-####. Interior steel studs for wall infills.
|
Place hold on job | 7/26/2013 | | 8/20/2013 | | DONE |
Christina Prado
|
|
|
Permit BLD13-01907 must be issued at same time as BLD13-01890. They are both on one set of plans in ePlan review. DO NOT ISSUE SEPERATELY
|
Inspection Record Card- Bld | | | 8/20/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/20/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 8/20/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (AJS) | 7/16/2013 | 7/16/2013 | 7/26/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Level 2 Due 7/26
|
Routing - PLAN CHECK | 7/16/2013 | | 7/26/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 7/26/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/26/2013 | | DONE |
|
|
|
|
Intake Approval | | | 7/16/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Application received | | 7/15/2013 | | | |
|
|
|
|