Permanent Occupancy | | | 8/7/2013 | | DONE |
|
|
|
|
BLD-Final | 7/22/2013 | 7/26/2013 | 7/26/2013 | P | PASS |
Jim Storey
|
|
|
calll 1/2 hr before to meet// Jessie Phone #: ###-#### final ok pending plm temp sign off.
|
FIRE-Final Inspection | 7/24/2013 | 7/24/2013 | 7/26/2013 | P | PASS |
Forrest France
|
|
|
Correction items finished, life safety passed.
|
FIRE-Final Inspection | 7/22/2013 | 7/22/2013 | 7/22/2013 | P | FAIL |
Troy Cobbley
|
|
|
Shay and I spoke with Carl Madson and determined that an updated floor plan needs to be submitted that shows the island restroom, small enclosed corridor and the separate business in suite 102. The fire extinguisher has been inspected.
|
FIRE-Final Inspection | 7/18/2013 | 7/18/2013 | 7/18/2013 | P | FAIL |
Troy Cobbley
|
|
|
Provide annual inspection for the fire extinguisher. Provide access to the locked room also if needed get with plan review to let tim woodard know that office #2 has been sub-leased.
|
Plan assigned to (TLW) | 7/15/2013 | | 7/18/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/17/2013 | | 7/18/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 7/15/2013 | | 7/18/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved on Routing sheet. TLW
|
1st review completed | | | 7/18/2013 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/18/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Override - Parcel Holds | | | 7/18/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 7/18/2013 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 7/18/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 7/18/2013 | | DONE |
Christina Prado
|
|
|
called Shalia to advise permit was ready pending SWR fee payment
|
Override - Parcel Holds | | | 7/18/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/18/2013 | | DONE |
|
|
|
|
Routing PW Sewer Rating | 7/17/2013 | | 7/17/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 7/16/2013 | | 7/16/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Application received | | 7/15/2013 | 7/15/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/15/2013 | | DONE |
Tisha Gallop
|
|
|
|