Third Notice | | 2/3/2014 | 2/5/2014 | | DONE |
|
|
|
|
Print Statement | | | 2/5/2014 | | DONE |
Tisha Gallop
|
|
|
mailed to Van Auker Co
|
Second Notice | | 1/3/2014 | 1/29/2014 | | DONE |
|
|
|
|
First Notice | | 11/2/2013 | 12/24/2013 | | DONE |
Christina Prado
|
|
|
mailed 12-26-13
|
BLD-Final | 10/22/2013 | 10/23/2013 | 10/23/2013 | P | PASS |
Mike Jordan
|
|
|
Ron Phone #: ###-####. ok for perm. occ.
|
FIRE-Final Inspection | 10/22/2013 | 10/23/2013 | 10/23/2013 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Permanent Occupancy | | | 10/23/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Conference | 10/18/2013 | 10/21/2013 | 10/21/2013 | P | DONE |
Mike Jordan
|
|
|
ron - call 30 mins prior Phone #: ###-####
|
BLD-Final | 10/15/2013 | 10/16/2013 | 10/16/2013 | P | NR |
Mike Jordan
|
|
|
Ron Phone #: ###-####
|
FIRE-Final Inspection | 10/15/2013 | 10/16/2013 | 10/16/2013 | A | FAIL |
Troy Cobbley
|
|
|
Provide verification that a racking permit has been applied for and provide modified sprinkler protection for the display area (merchantile). Sprinkler system was originally designed for light hazard office.
|
Issue PAID IN FULL permit | | | 7/22/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (AJS) | 7/17/2013 | 7/17/2013 | 7/19/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Level 1 Due 7/23
|
Routing - PLAN CHECK | 7/18/2013 | | 7/19/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 7/19/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 7/19/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/19/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/19/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 7/19/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 7/19/2013 | | DONE |
Barbara Stitt
|
|
|
Called Gayle and told him that permit is ready, fees due and need gc form on 7-19-13 @ 2:30pm//BAS
|
Routing - FIRE | 7/17/2013 | | 7/18/2013 | | PASS |
Scott Arellano
|
|
|
Attached IFC Comments to plans.
|
Plans ACCEPTED BY PLAN TECH | | | 7/17/2013 | | |
|
|
|
Ok per Adele to take in level 1
|
Application received | | 7/16/2013 | | | |
|
|
|
|