Third Notice | | 7/14/2014 | 9/2/2014 | | DONE |
|
|
|
ok to sign off per Rita
|
Second Notice | | 6/21/2014 | 7/9/2014 | | DONE |
|
|
|
|
First Notice | | 4/27/2014 | 6/11/2014 | | DONE |
|
|
|
Mailed 6-11-14
|
Permanent Occupancy | | | 4/17/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 4/15/2014 | 4/16/2014 | 4/15/2014 | A | PASS |
Jim Storey
|
|
|
Gordon Phone #: ###-####
|
FIRE-Final Inspection | 9/23/2013 | 9/23/2013 | 9/23/2013 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 9/20/2013 | 9/23/2013 | 9/23/2013 | A | PART |
Jim Storey
|
|
|
gordan Phone #: ###-#### temp ok pending ele sign off/
|
FIRE-Final Inspection | 9/12/2013 | 9/13/2013 | 9/16/2013 | A | FAIL |
Forrest France
|
|
|
East side fire sprinkler system is not yet in service, fire alarm permit work underway, provide approved hardware at the new warehouse exit door. Project is not yet in condition for final occupancy approval at this time.
|
FIRE-Conference | 9/9/2013 | 9/10/2013 | 9/10/2013 | A | DONE |
Forrest France
|
|
|
On site visit to determine status of work in progress and discuss project related fire sprinkler permit activity and system repairs.
|
FIRE-Conference | 9/6/2013 | 9/9/2013 | 9/9/2013 | A | DONE |
Forrest France
|
|
|
Regarding project completion schedule
|
BLD-Conference | 9/3/2013 | 9/3/2013 | 9/3/2013 | P | PART |
Tom Arcoraci
|
|
|
needs to see plan review mezzanine not on plan????? exiting and size ect????
|
BLD-Conference | 8/30/2013 | 9/3/2013 | 9/3/2013 | A | CANC |
Tom Arcoraci
|
|
|
gordon Phone #: ###-####
|
FIRE-Final Inspection | 8/29/2013 | 8/30/2013 | 8/30/2013 | A | FAIL |
Forrest France
|
|
|
Noted items as follows; existing fire sprinkler system deficiencies including system currently out of service, missing coverage below overhead garage doors, stairs to the mezzanine, and two closets. Post door to remain unlocked signage at the main entry, reverse door swing per plan, post illuminated exit signs/EM lights, reverse door hardware at the rated wall, provide current tags on the fire extinguishers, verify offsite monitoring.
|
FIRE-Conference | 8/28/2013 | 8/29/2013 | 8/29/2013 | P | DONE |
Forrest France
|
|
|
Conversation with tenant regarding items required for occupancy approval.
|
FIRE-Final Inspection | 8/28/2013 | 8/29/2013 | 8/29/2013 | P | CANC |
Forrest France
|
|
|
gordon Phone #: ###-####
|
Fees Due Hold | 8/16/2013 | | 8/28/2013 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 8/1/2013 | | DONE |
Tisha Gallop
|
|
|
|
Routing - FIRE | 7/20/2013 | | 7/23/2013 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
1st review completed | | | 7/23/2013 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 7/23/2013 | | 7/23/2013 | | PASS |
Jason Blais
|
|
|
For Tim Woodard.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2013 | | DONE |
Jason Blais
|
|
|
|
Print Occupancy Form | | | 7/23/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 7/23/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/23/2013 | | DONE |
Tisha Gallop
|
|
|
called Clinton and told him permit is ready, fee and need GC.
|
Plan assigned to (TLW) | 7/16/2013 | | 7/23/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/17/2013 | | 7/20/2013 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines. Tim Woodard
|
Case Summary (BLD) | | | 7/20/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 7/16/2013 | | 7/17/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 7/17/2013 | | 7/17/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Sewer Rating | 7/17/2013 | | 7/17/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 7/16/2013 | 7/16/2013 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/16/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/16/2013 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 7/16/2013 | | PASS |
Tim L. Woodard
|
|
|
|