Second Notice | | 11/13/2014 | 11/28/2014 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 10/19/2014 | 11/3/2014 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/9/2014 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 10/8/2014 | 10/8/2014 | 10/8/2014 | P | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-#### pending ele temp
|
FIRE-Final Inspection | 10/6/2014 | 10/7/2014 | 10/7/2014 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Address and sticker to be mounted prior to a building sign off.
|
PubWorks Occupancy Approval | 10/7/2014 | 10/7/2014 | 10/7/2014 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Framing/Rough-in | 9/8/2014 | 9/8/2014 | 9/8/2014 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 9/2/2014 | 9/2/2014 | 9/2/2014 | P | PART |
Jim Storey
|
|
|
Please call ahead for access - Dave Phone #: ###-#### fire blk unusable space at ceillng line/ air seal/
|
BLD-Foundation | 5/19/2014 | 5/21/2014 | 5/21/2014 | A | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-####
|
BLD-Foundation | 5/20/2014 | 5/20/2014 | 5/20/2014 | P | PASS |
Jim Storey
|
|
|
call before to meet him on site // Dave O''Neil Phone #: ###-####
|
BLD-Footing | 5/15/2014 | 5/16/2014 | 5/16/2014 | P | PASS |
Tom Arcoraci
|
|
|
Dave-please call 1 hr prior Phone #: ###-####
|
BLD-Conference | 5/5/2014 | 5/6/2014 | 5/6/2014 | P | PASS |
Jim Storey
|
|
|
David - please call with a meet ftime. Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/22/2014 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 4/21/2014 | | |
|
|
|
|
Routing - PLAN CHECK | 4/11/2014 | | 4/21/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 4/21/2014 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2014 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/21/2014 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 4/21/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (AJS) | 1/6/2014 | | 4/21/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1 st review completed Due 2/5 Western International recovery bureau new office
|
Routing - FIRE | 4/14/2014 | 4/14/2014 | 4/14/2014 | | PASS |
Craig D. Hanson
|
|
|
See attached report
|
Plan resubmittals received | | | 4/11/2014 | | DONE |
Christina Prado
|
|
|
Received three set of revised plan sheets marked M-1, M-2 & P-1;Taken to Adele for further review
|
Routing - PUBLIC WORKS | 4/11/2014 | | 4/11/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - FIRE | 3/31/2014 | 3/31/2014 | 4/9/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review Rev 1 04-09-14
|
Routing - PLAN CHECK | 4/1/2014 | | 4/2/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
email sent 4-2-14
I have completed the second review for the WIRB building. Please see the attached document. The door hardware was not corrected on the plans and I have red lined them. Please be sure to read the information on the correct door hardware for construction. The only item I am missing is the re submitted mechanical sheet was not stamped by the mechanical engineer of record. Please submit 2 sets of the revised mechanical sheets with the mechanical engineers stamp.
Thank you
Adele Schaffeld-Griffin
Plans Examiner II
City of Boise PDS
###-####
|
Routing PW Environmental | 4/2/2014 | | 4/2/2014 | | PASS |
Walt Baumgartner
|
|
|
Flamm incept to be installed per plumbing div
|
Routing - PLUMBING | 3/31/2014 | | 4/1/2014 | | PASS |
Daryl Spivey
|
|
|
Need to meet cross sectional venting requirements and install flammable liquids interceptor as detail included in plans.
|
Routing - PUBLIC WORKS | 3/31/2014 | | 4/1/2014 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 3/31/2014 | | 3/31/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Environmental | 3/31/2014 | | 3/31/2014 | | FAIL |
Walt Baumgartner
|
|
|
City approved flammable liquids oil/water/sediment separator required.
|
Plan resubmittals received | | | 3/27/2014 | | DONE |
Christina Prado
|
|
|
Received three sets of revised plan sheets marked C1, A3, A4, A5, A7, E1, EN-1, M1, p-1 & p-2 as well as three plan review responses, new application and energy saver calcs;Plans taken to Adele for review
|
Routing - FIRE | 1/31/2014 | 1/3/2014 | 1/31/2014 | | PASS |
Craig D. Hanson
|
|
|
See attached Fire Plan Report
|
Routing - PLAN CHECK | 1/13/2014 | | 1/31/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
plan review letter emailed 1/31/14
|
1st review completed | | | 1/31/2014 | | FAIL |
|
|
|
Failed: Plan Check, Plumbing, PW, Enviromental
|
Routing Off Site - STRUCTURAL | 1/6/2014 | | 1/31/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
recieved email approval
|
Route to Impact Fee Review | 1/3/2014 | 1/8/2014 | 1/15/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLUMBING | 1/10/2014 | | 1/13/2014 | | FAIL |
Daryl Spivey
|
|
|
1. Resubmittal required by Public Works for oil-sand-flammable intercepter for plumbing.
2. The stub for future water for bld. to east is required to have a seperate water meter installed for that bld.
3. Cold water supply riser diagram does not match plumbing plan.
4. Plumbing plan is required to be a stamped plan by a Idaho licensed engineer.
|
Routing - PLANNING | 1/13/2014 | | 1/13/2014 | | PASS |
Sue Cummings
|
|
|
see redlines on site plan.
|
Routing - PUBLIC WORKS | 1/8/2014 | | 1/10/2014 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Walt Baumgartner for Environment issues. ###-####
|
Routing - Erosion and Sediment | 1/10/2014 | | 1/10/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan and narrative submitted and approved. Need to designate valid RP before issue permit.
|
Routing PW Sewer Design | 1/9/2014 | | 1/10/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Sewer Rating | 1/10/2014 | | 1/10/2014 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Solid Waste | 1/10/2014 | | 1/10/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Environmental | 1/10/2014 | | 1/10/2014 | | FAIL |
Walt Baumgartner
|
|
|
City approved flammable liquids oil/water/sediment separator required. Contact info - ###-####
Floor drains, etc. for both tenant spaces may route thru single 1500 gal interceptor to be placed outside building footprint.
|
Routing PW Street Lights | 1/9/2014 | | 1/9/2014 | | PASS |
Mike D Hedge
|
|
|
No street lights required
|
Routing PW Drainage | 1/3/2014 | | 1/8/2014 | | PASS |
Brian Murphy
|
|
|
|
Telephone call | | | 1/6/2014 | | DONE |
Christina Prado
|
|
|
called Action Couriers for pick up
|
Routing - PLANNING Land Div | 1/3/2014 | | 1/3/2014 | | PASS |
Dave Abo
|
|
|
Lot 3, Block 1 of Mendenhall Subdivision.
|
Routing - Addressing | 1/3/2014 | | 1/3/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/3/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 1/3/2014 | | PASS |
Carl D Madsen
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/3/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 12/4/2013 | | FAIL |
|
|
|
|
Intake Approval | | | 7/22/2013 | | FAIL |
|
|
|
(7-22-13) No drawings uploaded.
|
Payment Received | | | 7/17/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/17/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 17 2013 12:04PM
|
Pending Assignment by JCM | 1/3/2014 | | | | |
John Menard
|
|
|
|