Third Notice | | 5/10/2015 | 6/9/2015 | | DONE |
|
|
|
|
Third Notice | | 3/8/2015 | 5/5/2015 | | DONE |
|
|
|
|
Third Notice | | 2/7/2015 | 3/3/2015 | | DONE |
|
|
|
|
Third Notice | | 1/7/2015 | 2/2/2015 | | DONE |
|
|
|
|
Third Notice | | 12/6/2014 | 1/2/2015 | | DONE |
|
|
|
mailed with letter
|
Third Notice | | 11/15/2014 | 12/1/2014 | | DONE |
|
|
|
|
Third Notice | | 10/11/2014 | 11/10/2014 | | DONE |
|
|
|
mailed to Fredrick Schuerman
|
Second Notice | | 9/7/2014 | 10/6/2014 | | DONE |
|
|
|
|
First Notice | | 8/7/2014 | 8/28/2014 | | DONE |
|
|
|
|
BLD-Final | 7/28/2014 | 7/28/2014 | 7/28/2014 | P | PASS |
Jim Sly
|
|
|
Dave Phone #: ###-#### OK for Perm Occ.
|
Permanent Occupancy UNPAID FEE | | | 7/28/2014 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 7/14/2014 | 7/14/2014 | 7/14/2014 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 7/9/2014 | 7/9/2014 | 7/9/2014 | P | FAIL |
Troy Cobbley
|
|
|
Repair the two exit discharge lights and the kitchen emergency light
|
BLD-Energy code compliance | 9/18/2013 | 9/18/2013 | 9/18/2013 | P | PASS |
Jim Sly
|
|
|
DAVE Phone #: ###-####
|
FIRE-Final Inspection | 9/10/2013 | 9/11/2013 | 9/11/2013 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was actually just a conference. Dave and I went over possible fire sprinkler obstructions for this build out and over door hardware.
|
BLD-Framing/Rough-in | 9/9/2013 | 9/10/2013 | 9/10/2013 | A | PASS |
Jim Sly
|
|
|
dave Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/30/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (AJS) | 8/8/2013 | 8/8/2013 | 8/26/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review complete in fire Due 8/13
|
Routing - PLAN CHECK | 8/26/2013 | | 8/26/2013 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 8/26/2013 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/26/2013 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/26/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 8/26/2013 | | DONE |
Christina Prado
|
|
|
called Bill to advise permit is ready and gave fees due
|
Override - Parcel Holds | | | 8/26/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 8/26/2013 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 8/23/2013 | | DONE |
Tisha Gallop
|
|
|
received response, two copies of plumbing fixture analysis, and plan sheets G0.0, A1.0, A1.1, A3.0, E1.0; taken to Adele
|
1st review completed | | | 8/13/2013 | | FAIL |
|
|
|
Failed Plan Check.
|
Routing - FIRE | 8/12/2013 | | 8/13/2013 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans.
|
Routing - PLAN CHECK | 8/8/2013 | | 8/12/2013 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
completed review. see documents for letter sent to fireLevel 3 Due 8/13
|
Plan assigned to (SRZ) | 7/17/2013 | 7/17/2013 | 8/8/2013 | | DEFR |
Sam Zahorka
|
|
|
Deferred to AJS on 8/8/13 - Level 3 TI - Sockeye Brew Pub
|
Routing - Design Review | 7/23/2013 | | 7/24/2013 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - DRH11-00263
|
Routing - PUBLIC WORKS | 7/18/2013 | | 7/19/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 7/18/2013 | | 7/19/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 7/17/2013 | | 7/18/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Environmental | 7/18/2013 | | 7/18/2013 | | PASS |
Walt Baumgartner
|
|
|
1500 GI put in w/ initial brewing operation building, new plans show kitchen drains to the GI
|
Plans ACCEPTED BY PLAN TECH | | | 7/17/2013 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 7/17/2013 | | PASS |
John Menard
|
|
|
|
Override - Parcel Holds | | | 7/17/2013 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/17/2013 | | DONE |
Christina Prado
|
|
|
|
Pending Assignment by JCB | 7/17/2013 | | 7/17/2013 | | DONE |
Jason Blais
|
|
|
|
Routing - PLUMBING | 7/19/2013 | | 7/23/2012 | | PASS |
Bill VanDegrift
|
|
|
Per plan and 2009 ISPC.
|
Application received | | 7/17/2013 | | | |
|
|
|
|